This document is an Amendment to Solicitation W912ES24B0012 for the Lock & Dam 2 Barge Impact Repair project. The amendment updates Specification Section 02 41 00, changing the dewatering elevation from 673 to 680. The overall solicitation is for a firm-fixed price construction contract to repair damage to the upstream guidewall of Lock & Dam 2 in Hastings, MN, caused by a barge collision. The work requires demolition and removal of the upper portion of the guidewall monolith, realignment of the foundation, and replacement of approximately 180 CY of reinforced concrete. The contractor must furnish and operate a dewatering system. Construction is under a compressed timeline, with work commencing after navigation season ends on December 9, 2024 and completing by early March 2025. The procurement is a 100% Small Business Set-Aside with an estimated magnitude between $1,000,000 and $5,000,000. The contracting agency is the U.S. Army Corps of Engineers - St. Paul District.

View the file

Other files for this federal contract opportunity

Other files attached to Lock & Dam 2 Barge Impact Repair, newest first.
File Type Posted
W912ES24B0012 Bid Abstract (signed).pdf PDF
02 41 00 AMEND4.pdf PDF
W912ES24B0012-0003 Amendment 0003.pdf PDF
W912ES24B0012-0002 Amendment 2.pdf PDF
W912ES24B0012_Amend_2 Section 01 14 00.00 13.pdf PDF
W912ES24B0012-0001 Amendment 0001.pdf PDF
01 14 00.00 13 Amend.pdf PDF
W912ES24B0012_SPECS.pdf PDF
W912ES24B0012_PLANS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0004 is to updated Specification Section 02 41 00. In Subpart 3.1 DEWATERING the elevation is changed from 673 to 680.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Aug-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ES24B0012

X 9B. DATED (SEE ITEM 11)

10-Jul-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Aug-2024

CODE

CONTRACTING DIVISION

USACE, ST PAUL

332 MINNESOTA STREET

SUITE E1500

ST PAUL MN 55101-1323

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES24B0012

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been modified:

SUMMARY OF CHANGES

Summary of Change – Amendment 2

SOLICITATION NUMBER: W912ES24B0012

Amended solicitation specification Section 01 14 00.00 13

Changed “approval” in second sentence to “notification”.

Added: (Refer to Section 01 00 00.00 13 Paragraph 3.2.2) after the first sentence.

Deleted: The contractor must provide the Contracting Officer a request 7 calendar days prior to starting a construction schedule involving work outside of the normal hours of operation.

Amended solicitation specification Section 01 32 01.00 10

1) 1.1 SUBMITTALS

Added the requirement for a submittal for approval of the Project Scheduler Qualifications.

1) 1.2 PROJECT SCHEDULER QUALIFICATIONS

Designate an authorized representative to be responsible for the preparation of the schedule and all required updating and production of reports. The Designated Project Scheduler must have prepared and maintained at least three previous construction schedules for projects of similar size and complexity to this contract, using Primavera P6.. Representative must have a comprehensive knowledge of CPM scheduling principles and application.

2) 2.1.2 CONTRACTOR SOFTWARE

Deleted: Scheduling software used by the contractor must be commercially available from the software vendor for purchase with vendor software support agreements available. The software routine used to create the required sdef file must be created and supported by the software manufacturer.

Added: Scheduling Software used by the contractor must be Primavera P6.

5) 2.1.2.1 PRIMAVERA

Delete "If Primavera P6 is selected for use," and Capitalize the "Provide"

6) 2.1.2.2 OTHER THAN PRIMAVERA

Deleted part.

7) Added 3.3.8 ADVERSE WEATHER

Added "Adverse Weather" with the following verbiage... "Ensure anticipated adverse weather is accounted for in the Project Schedule. AACE 84R-13 provides methodologies for techniques in planning for adverse weather. The preferred methodology is the use of a weather calendar.

3.4.1 PRELIMINARY PROJECT SCHEDULE SUBMISSION

Deleted part.

3.4.1 INITIAL PROJECT SCHEDULE SUBMISSION

Update this to 30 days instead of 42 due to short project timeline

Add the following verbiage from previous paragraph here... "The approved Initial Project Schedule will be used for payment purposes. Completely cost load the Initial Project Schedule to balance the contract award CLINS shown on the Price Schedule. It must be early start and late finish constrained and logically tied as specified. The Initial Project Schedule specified herein must include all the required plan and program preparations, submissions and approvals identified in the contract (for example, Quality Control Plan, Safety Plan, and Environmental Protection Plan) as well as design activities, planned submissions of all early design packages, permitting activities, design review conference activities, and other non-construction activities.

Government acceptance of specified Program and Plan approvals must occur prior to any planned construction activities. Activity code any activities that are summary in nature after the first 90 calendar days with Bid Item (CLIN) code (BIDI), Responsibility Code (RESP) and Feature of Work code (FOW)."

3.5 SUBMISSION REQUIREMENTS

Remove Preliminary Schedule from first sentence.

3.7 WEEKLY PROGRESS MEETINGS

Add to the end... "Contractor to prepare and submit minutes of this meeting within 3 calendar days to the Government."

Summary of Change – Amendment 0004

Amended solicitation specification Section 02 41 00

Changed elevation from 673 to 680 in Subpart 3.1 DEWATERING

(End of Summary of Changes)