W912ES24B0012-0001 Amendment 0001.pdf

PDF 503 KB Posted

Attached to
Lock & Dam 2 Barge Impact Repair Federal contract opportunity
Solicitation number
W912ES24B0012
Issued by
Department of the Army Corps of Engineers Engineering District St Paul

About this file

This document is an Amendment to Solicitation/Modification of Contract for a firm-fixed price Construction contract to repair damage to the upstream guidewall of Lock & Dam 2 in Hastings, MN. The purpose of the amendment is to make changes to the specifications, including changes to clause 52.236-4 Physical Data and Section 01 14 00.00 13 Subparts 3.3, 3.5, 3.6, and 3.7.

The related federal contract opportunity is for a Construction contract to demolish and remove the upper portion of the upstream guidewall monolith 25, and realign the foundation of monolith 25 and make minor adjustments to monolith 24. The principal repair feature is replacing approximately 180 CY of cast-in-place reinforced concrete, portions of which are below water. The estimated magnitude of construction is between $1,000,000 and $5,000,000. This Invitation for Bid (IFB) is 100% set-aside for Small Businesses under NAICS code 237990, with a $45,000,000 SBA size standard. The location is Lock and Dam No. 2 in Hastings, MN. Construction cannot begin until after the navigation season has ended (tentatively scheduled for December 9, 2024) and must be complete by early March 2025.

View the file

Other files for this federal contract opportunity

Other files attached to Lock & Dam 2 Barge Impact Repair, newest first.
File Type Posted
W912ES24B0012 Bid Abstract (signed).pdf PDF
W912ES24B0012-0004 Amendment 0004.pdf PDF
02 41 00 AMEND4.pdf PDF
W912ES24B0012-0003 Amendment 0003.pdf PDF
W912ES24B0012-0002 Amendment 2.pdf PDF
W912ES24B0012_Amend_2 Section 01 14 00.00 13.pdf PDF
01 14 00.00 13 Amend.pdf PDF
W912ES24B0012_SPECS.pdf PDF
W912ES24B0012_PLANS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0001 is to make changes to the SPECS, including changes to clause 52.236-4, and Section 01 14 00.00 13 Subparts 3.3, 3.5, 3.6, and 3.7.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Jul-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ES24B0012

X 9B. DATED (SEE ITEM 11)

10-Jul-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Jul-2024

CODE

CONTRACTING DIVISION

USACE, ST PAUL

332 MINNESOTA STREET

SUITE E1500

ST PAUL MN 55101-1323

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES24B0012

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been modified:

52.236-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by . . . . . . . . . the USACE St. Paul District Dive Team, sonar, and site inspections by professional engineers.

(b) Weather conditions . . . . . . . . . weather data based on observations at the Minneapolis St. Paul International Airport, MN which has a period of record of 84 years (1939 – 2022) is available. The number of adverse weather days, defined as precipitation of 0.1 inch or more and maximum daily temperature less than 32 degrees Fahrenheit are shown. Please Note – there will be no time extensions granted for severe weather for this contract.

MONTHLY ANTICIPATED ADVERSE WEATHER DAYS

BASED ON A 7 DAY WEEK

GEOGRAPHIC LOCATION – Lock & Dam 2, Hastings, MN Month JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

Days 24 17 12 6 7 7 6 6 6 5 7 20

(c) Transportation facilities . . . . . . . . . Lock and Dam 2 is accessible by road from US Highway 61 and local roads via Lock and Dam Road.

(d) Flow Rates. . . . . . . . . . Hydrographs showing the daily flow rate of Lock and Dam 2 for the period of January 1, 2014 – December 31, 2023 are available upon request. The highest recorded flow of 172,800 cfs occurred on April 17, 1965.

(End of clause)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .