FY20 Base +4 Year Document Destruction
Closed Solicitation Posted
- Solicitation number
- 36C25620Q0181
- Agency
-
Veterans Integrated Service Network 16
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 561990 All Other Support Services
Notice details come from SAM.gov. Updated .
Notice text
4 versions
Update #4 · Latest ·
Clarifies response due date: Submission shall be received not later than Tuesday 11:59 PM January 21, 2020 to email address anthony.mitchell4@va.gov. Late submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f). Only e-mailed quotes will be accepted].
Clarifies that the QASP will be submitted post award.
Corrects the number of consoles in price schedule.
B.3 PRICE SCHEDULE
ITEM INFORMATION
ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
0001
34.5 weeks
Mo
Document Destruction in accordance with Statement of Work. 276 consoles at different locations in Jackson area
Contract Period: Base
POP Begin: 02-01-2020
POP End: 09-30-2020
SUBTOTAL BASE YEAR
ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1001
52 weeks
Mo
Document Destruction in accordance with Statement of Work. 276 consoles at different locations in Jackson area.
Contract Period: Option 1
POP Begin: 02-01-2021
POP End: 01-31-2022
SUBTOTAL OPTION 1
SUBTOTAL BASE & OPTION 1
ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
2001
52 weeks
Mo
Document Destruction in accordance with Statement of Work. 276 consoles at different locations in Jackson area
Contract Period: Option 2
POP Begin: 02-01-2022
POP End: 01-31-2023
SUBTOTAL OPTION 2
SUBTOTAL OPTION 1 & 2
ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
3001
52 weeks
MO
Document Destruction in accordance with Statement of Work. 276 consoles at different locations in Jackson area.
Contract Period: Option 3
POP Begin: 02-01-2023
POP End: 01-31-2024
SUBTOTAL OPTION 3
SUBTOTAL OPTION 1, 2 & 3
ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
4001
52 weeks
MO
Document Destruction in accordance with Statement of Work. 276 consoles at different locations in Jackson area
Contract Period: Option 4
POP Begin: 02-01-2024
POP End: 01-31-2025
SUBTOTAL OPTION 4
NOTE: FAR 52.217-8 Option to Extend Services , not to exceed six (6) months in total for this contract. The specified rates under this clause will be those rates in effect under the contract each time an option is exercised under this clause.
GRAND TOTAL BASE AND ALL OPTIONS
Update #3 ·
36C256-20-Q-0181_1 A0002
This amendment clarifies , adds, or corrects information in the Combined Solicitation Synopsis.
It extends the date specified for receipt of offers to accommodate the advertisement of the Request for Information answers. Please see answers below.
The date for receipt of offers is changed from January 16, 2020 to January 21, 2020.
Please see answers to Request for Information below.
CLIN 0001 period of performance is changed to read 34.5 weeks.
P. 3, 1.3.
Final destruction shall occur at a NAID certified location contradicts p. 7 which states where practicable . Since NAID certifies entities rather than locations, and does not certify recycling centers at all, could this requirement please be removed?
The last sentence of 1.3 bullet 3 is removed and NAID requirement is removed from requirement.
This section calls for service every other week whereas elsewhere weekly serviced is indicated. Please confirm which is correct weekly or bi-weekly.
Weekly
P. 7, 1.5.5.4. This section mentions national security classified . Please confirm that there will not be any national security classified material presented. A VAMC does not normally generate classified material, and such material requires special handling, security clearances, etc.
The wording for this section is taken directly from the VA Directive 6371 Appendix A, page A-1. It states, However if the records require special protection because they are national security classified or deemed confidential by statue . This can be interpreted as a contingency if the situation is ever encountered in the VA. There is no mention of special protection because they are national security classified or deemed confidential by statue in the PWS other than the general information section of the solicitation.
P. 13, 5.5. Locations of consoles continuously change , which is repeated on p. 15, 5.1.8.1.
How will the location of consoles be tracked?
At Present contractor tracks bins by serial number and location if one is to be moved contractor in notified of change
Historically how much are consoles moved around?
This depends on the movement of departments in the VA Due to Construction and renovation projects
Historically how often is the number of consoles increased and/or decreased at each location?
The numbers have stayed the same over the last 4 years no increase or decrease
P. 14, 5.1.1.
Are the small consoles for media to be picked bi-weekly as noted here, or monthly as stated in 5.1.8.1?
Change to weekly to maintain consistency
Will a service that falls on a Federal Holiday be rescheduled for the same week, or does excluding Federal Holidays indicate that service will be skipped that week?
Rescheduled before or after
P. 14, 4.1.8.1. Rolling bins will be available for use by the medical center on an as needed basis. Please explain if this refers to the ten rolling bins in 5.1.1 or
there is a need for additional rolling bins. If so, what is the quantity needed and how often will they need servicing?
This refers to the 10 bins 5.1.1
P. 16. Please confirm that VA Directive 6371 is the guiding document for the shredding process.
Yes
P. 20, price schedule. The quantity of 270 consoles in each CLIN does not match the count for consoles on pages 14-15, nor does it match the total number of containers in that list. Please confirm what number we should use when entering pricing in the price schedule, and if what we will be servicing on is the price schedule quantity of 270, or the quantities broken out in the list on pages 14-15.
Correct price schedule to read 272 consoles, per p14-15 5.1.1-5.1.7
P. 23, Part A, 1. Please explain the requirement for Microbiological Testing Services or kindly delete it.
Delete Typo. Replace with Document Shredding Services.
P. 23, Part B, 2.
Can you please describe what a prudent person would pay for these services? Is that person the CO who is making the award?
A Quoter s price quote will be evaluated for reasonableness. For a price to be reasonable, it must represent a price to the Government that a prudent person would pay when consideration is given to prices in the market. Normally, price reasonableness is established through adequate price competition, but may also be determined through price analysis techniques as described in FAR 13.106-3.
Since this is an SDVOSB set-aside, and the Limitations on Subcontracting apply, the awardee cannot pay a similarly situated subcontractor more than 50% of the award. This means that comparing an SDVOSB offer to previous awards to contractors (e.g. small or large businesses) who were not required to meet this regulation is patently unfair.
Will Limitations on Subcontracting be taken into account when evaluating offers?
Evaluation and award will be conducted in accordance with the requirements of FAR 13.106-2(b)(3)
How will awardee adherence to the regulation be enforced?
See VAAR clause 852.219-74
At the main campus, across how many buildings will the containers be spread and how far apart are they? At all locations, will any bins be located above/below the ground floor? If so, are elevators available to move them to the ground floor?
3 all connected by ground floor See Floor Plans attached 1 out building ground access via main building sidewalks
Is there a loading dock at any of the locations? Yes. Current contractor uses ramp to parking lot in secure area of loading dock area.
Is there sufficient parking for our truck at each location for the time it will take to retrieve containers, shred the contents and return the containers?
Yes
Is there a current contract for the work being solicited? Yes
If so, please provide that awarded contract number or task order number (NOT the incumbent GSA contractor number). VA256-15-F-0333
Please provide the name of the incumbent contractor. Shred-it ® is a Stericycle solution
Please provide the annual contract amount. $98,866.17
Is the level of effort being performed under the current contract fundamentally the same as what will be required to fulfill # 36C25620Q0181? Yes
Is the QASP document in the solicitation package for informational purposes only, to be filled out post-award? Yes
Removes The statement :
One (1) Part A - Content of the Non-Price Factors/Technical Part.
The Quoter shall provide a technical approach that details how the requirements of the SOW will be accomplished. At a minimum, this shall include the following:
The intended strategy to complete all tasks as described in the SOW. A description of the company s technical ability to provide Microbiological Testing Services in accordance with the terms, conditions, specifications, and requirements of the solicitation and resulting contract.
And changes it to:
The narrative summary may describe the Contractor s capability, stability and strengths.
3. As of this posting Requests for Information , will no longer be received by the Government for this requirement. Please sign and return all Amendments.
Update #2 ·
36C256-20-Q-0181_1 Amendment 0001
This amendment clarifies , adds, or corrects information in the Combined Solicitation Synopsis.
The set-aside block of page 1, adds the designator SD for Service Disable Veteran Owned Business.
Page 15 paragraph 5.1.7, adds the quantity of one (1), regular lockable console. Sixteen (16), is the estimated number of lockable 96-gallon rolling bins.
End of Amendment
Update #1 ·
Combined Synopsis/Solicitation for Commercial Items
VHAPM Part 813.106-1/2 SAP: Soliciting Competition & Evaluation of Quotations/Offers
Original Date: 10/12/17
COMBINED SYNOPSIS/SOLICITATION FOR COMMERCIAL ITEMS
General Information
Document Type:
Combined Solicitation/Synopsis
Solicitation Number:
36C256-20-Q-0181_1
Posted Date:
January 8, 2020
Original Response Date:
January 16, 2020
Current Response Date:
January 16, 2020
Product or Service Code:
R616 Physical Records Management
Set Aside (SDVOSB/VOSB):
SDVOSB
NAICS Code:
561990 Other Support Services
Contracting Office Address
Network Contracting Office 16
510 East Stoner Ave
Shreveport, LA 71101
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Items, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and a written solicitation document will not be issued.
This solicitation is a request for quotations. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2019-06 (effective 10/10/2019)..
The associated North American Industrial Classification System (NAICS) code for this procurement is 561990, other support services, with a small business size standard of 12.0 million.
The G.V. (Sonny) Montgomery VA Medical Center, 1500 East Woodrow Wilson Drive, Jackson MS 39216-5116 is seeking to purchase Document Destruction Services .
All interested companies shall provide quotations for the following:
PERFORMANCE WORK STATEMENT (PWS)
Document Destruction Solicitation for Environmental Management Services
Part 1
General Information
1. GENERAL: This is a non-personnel services contract to provide, National Association of Information Destruction (NAID) Certified document destruction of temporary paper records. The service shall provide for both On-site Interim Document Destruction and Final Document Destruction for G.V.(Sonny) Montgomery, Veterans Administration Medical Center (VAMC) and its designated associated sites. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 DESCRIPTION OF SERVICES/INTRODUCTION: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform on-site interim shredding services of confidential and sensitive documents in accordance with the National Institute of Standards and Technology (NIST) and the National Association for Information Destruction (NAID). The NAID certified contractor will provide service for document destruction to include but is not limited to non-paper data media, (such as CDs and floppy disks) as defined in this Performance Work Statement. The NAID certified contractor shall provide attestation of final document destruction for each shipment of records.
1.2 BACKGROUND: The current contract is a GSA task order and has been in place for 5 years. Pricing is calculated on total number of bins emptied per year. All bins were supplied by contractor.
1.3 OBJECTIVES:
Contractor will provide at the sites specified the appropriate placement of secured containers.
Interim On-site Document destruction shall consist of pierce, tear shred so that information cannot be read or reconstructed without a considerable amount of effort.
Final destruction shall occur at a NAID certified location where records shall be rendered totally unrecognizable and un-reconstructable.
The contractor shall provide documentation attesting to the chain of custody for records until final destruction.
Interim On-site document destruction shall be accomplished every other week at each specified site.
Provide a Certificate of Interim Destruction at the close of each service day to the facility generating the records for destruction.
Ensure that the document destruction services comply with VHA Directives 6371
1.4 SCOPE: Contractor will provide the necessary equipment needed on site to shred or destroy collected materials from the secured containers in accordance with interim destruction methods described in VA Directive 6371, Appendix A, paragraph 6. Interim destruction of records must take place at the VA facility and this destruction must be to the degree that the information contained on them is not readable and not reconstructable without extraordinary effort. If the interim destruction is not carried out by VA employees, it must be carried out by a National Association for Information Destruction (NAID) certified, bonded, and insured contractor who has contracted to provide sufficient reasonable safeguards to protect the records until final destruction has been completed. The final destruction witnessed by the contractor must be attested in writing, and the attestation must be submitted to the organization that created the records. The locations shall be serviced at a minimum, once every other week. Services include the interim destruction of sensitive and non-sensitive temporary records, documents and paper. Upon approval by the Contracting Officer Representative (COR) secured containers will be provided at no additional cost at a locations specified in the PWS. The Contractor shall upon completion of services provide the COR with a Certificate of Interim Destruction at the close of each service day.
1.5 GENERAL INFORMATION
1.5.1 QUALITY CONTROL: The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor s Quality Control Plan (QCP) program is the means by which he assures himself that his work complies with the requirement of the contract. One copy of the contractor's QCP shall be provided to the CONTRACTING OFFICER with the contractor's proposal. An updated copy shall be provided to the CONTRACTING OFFICER as changes occur. The plan shall comply with the requirements of FAR 52.246.4, Inspection of Services Fixed Price, which is incorporated by reference. The QCP shall be specifically tailored to the tasks of this PWS. The contractor shall list how specific tasks for this PWS shall be accomplished. A general business QCP will not suffice and will render your submission ineligible for evaluation. The plan shall include the following:
1.5.1.2. INSPECTION SYSTEM: An inspection system covering all the services specified in this PWS. It must specify the areas to be inspected on a scheduled or unscheduled basis, how often inspection will be accomplished, and the title of the individual (s) who will perform the inspections.
1.5.1.3. IDENTIFICATION AND PREVENTION. The methods for identifying and preventing defects in the quality of service performed before performance becomes unacceptable.
1.5.1.4. RECORDS: On-site records of all inspections conducted by the contractor and necessary corrective action taken. This documentation shall be made available to the government during the term of the contract.
1.5.1.5. GOVERNMENT REVIEW. The government will review the Contractor QCP to determine if it is adequate. If the plan is adequate, the government will accept the plan. If the plan is not adequate as submitted, the deficiencies will be identified to the contractor in writing. The contractor shall correct all identified deficiencies and submit a corrected Contractor QCP within ten working days or on contract start date, whichever is sooner. The government will also periodically review the manner in which the contractor is conducting the quality control program by either reviewing the contractor's records, observing actual performance or both. After acceptance of the quality control plan the Contractor shall receive the CONTRACTING OFFICER s acceptance in writing of any proposed change to his QCP program.
1.5.2 QUALITY ASSURANCE: The Government shall evaluate the Contractor s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QSAP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.5.3 HOURS OF OPERATION: Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential. The Contractor is responsible for providing services, between the hours of 8:00 AM and 4:30 PM, Monday thru Friday. Work schedule must be coordinated with the COR or his designee. The Contractor shall be accessible and/or available via phone Monday through Friday, 8:00 am to 4:30 pm, excluding federally recognized holidays, for answering questions and meeting the COR and facility s needs
1.5.3.1 RECOGNIZED HOLIDAYS: The contractor is not required to provide service on the following Federal observed holidays: New Year's Day, Martin Luther King's birthday, Presidents' Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, and Christmas Day.
1.5.3.2 PLACE OF PERFORMANCE: The work to be performed under this contract shall be performed at:
(1). 1500 East Woodrow Wilson Drive, Jackson Mississippi
(2). 715 South Pear Orchard, Ridgeland, Mississippi
(3). 3531 Lakeland Drive, Flowood, Mississippi
(4). 4 Riverbend Drive, Flowood, Mississippi
(5). 8 Riverbend Drive, Flowood, Mississippi
(6). 11 Riverbend Drive, Flowood, Mississippi
(7). 100 Spring Lake Cove, Pearl, Mississippi
1.5.4 SECURITY REQUIREMENTS: Contractor personnel performing work under this contract shall meet the industry standard for security requirements prior to commencement of work under this contract and must maintain the industry standard required for the life of the contract. All shredding shall take place at the Government owned or leased facilities herein and shall be witnessed by a Veterans Administration (VA) employee authorized to witness the destruction of sensitive VA material.
1.5.4.1 PHYSICAL SECURITY: The Contractor shall be responsible for safeguarding all Government information and property provided for destruction. At the close of each work period, Government facilities, equipment, and materials shall be secured. Collection containers distributed throughout any VA facility must be secured in a manner that prohibits unauthorized individuals from accessing paper records identified for destruction that have been deposited into them. These containers must provide reasonable physical safeguards which may include, among other measures, locks or placement in secure areas. The contractor shall clean up any residual material before leaving the site.
1.5.4.2 PERSONNEL: The selection, assignment, reassignment, transfer, supervision, management, and control of employees in performance of this work statement shall be the responsibility of the Contractor. However, the contractor shall comply with general intent and specific policies set forth in the performance of work statement concerning conduct of employees as referenced herein. When the Government directs, the Contractor shall remove from performance on the contract any person who is identified as a potential threat to the health, safety, security, general well-being, or operation mission of the activity and its population.
1.5.4.3 ACCESS LIMITATION: Only authorized Contractor employees are allowed inside the VA clinic. Contractor employees are not to be accompanied in the work area by acquaintances, family members, assistants, or any other person unless said person is an authorized Contractor employee.
1.5.4.4 BACKGROUND CHECKS: Documentation of a National Agency Check with Inquiries (NACI) background check shall be provided to the Contracting Officer s Representative (COR) on all contract employees who will provide service to the Medical Center and all other locations.
1.5.5.1 SAFETY AND FIRE PREVENTION: G. V. (Sonny) Montgomery VAMC Safety Officer is responsible for the enforcement of all safety regulations as they apply to the safety of VA employees, contractor employees, visitors, and patients. Any violations by contractor employees will be submitted to the Contracting Officer for mediation. In the performance of this contract, the Contractor shall take such safety precautions as necessary to protect the lives and health of occupants of the building. The Contractor shall comply with the Federal, State, and Local safety and fire regulations and codes. Contract employees shall smoke only in designated areas outside of the building. The Contractor shall be responsible for providing all applicable training and protective equipment to protect contract employees from any hazards, including blood borne pathogens that may be encountered in the performance of the contract.
1.5.5.2 PRIVACY: All VA sensitive information that is contained in paper records under the jurisdiction of VA shall be handled by the most secure, economical, and effective means in accordance with legal requirements. PII is the most common form of sensitive information handled at the VAMC and therefore requires the use of extraordinary procedures for its protection. PII that is not properly disposed of can result in actual or potential identity theft and can cause great personal hardship to the subject individuals. It is imperative that the appropriate means of destruction be used for all VA temporary paper records. VA s preference is for a method of destruction that permits paper records to be recycled, while still meeting the requirements for final destruction.
1.5.5.3 INTERIM DESTRCTION: Interim destruction on temporary paper records refers to macerating, chopping, pulverizing, or shredding of these records to a degree that does not definitely ensure that they are not readable or re-constructible to any degree, but does ensure that they are not readable or re-constructible without extraordinary effort. This destruction of temporary records is a preliminary step that will allow for secure transport of records until such time as their final destruction. The interim destruction of records is proper for ensuring their security when transportation is necessary for final destruction. Interim destruction of these records must take place at the Veterans Administration (VA) facility or at a secured vendor location; and this destruction must be to the degree that the information contained on them is not readable or re-constructible without extraordinary effort. If interim destruction is not carried out by VA employees, it must be carried out by a National Association for Information Destruction (NAID) certified, bonded, and insured contractor who has contracted to provide sufficient reasonable safeguards to protect the records until final destruction has been completed. Methods of interim destruction carried out by a contractor must be witnessed by a Federal employee or, if authorized by the organization that created the records, a contractor employee may act as witness, and the written attestation shall be submitted to the organization that created the records. The contractor employee may be the vendor performing the interim destruction as long as a certification of destruction is provided by the VA.
1.5.5.4. FINAL DESTRUCTION: The process through which temporary paper records are pulped, macerated, or shredded to a degree that definitively ensures that they are not readable or re-constructible to any degree. If this final destruction is performed away from a VA facility it must be performed, where practicable, by a National Association for Information Destruction (NAID) certified, bonded, and insured recycler or papermill, and any intermediary processes must protect the records until final destruction is completed. However, if the records require special protection because they are national security classified or deemed confidential by statue such as the Privacy Act of 1974, and the Health Insurance Portability and Accountability Act of 1996 (HIPPA), regulation, or VA policy, the wastepaper contractor shall be required to wet pulp, macerate, chop, shred, or otherwise definitively destroy the information contained in the records so that it is not readable or re-constructible. The destruction of the information must be witnessed either by a Federal employee, or if authorized by the organization that created the records, by a contractor employee. This witnessing may be completed by the wastepaper contractor as long as documented certification of destruction is provided by the VA that certifies complete destruction of the records.
1.5.5.5. CERTIFICATION OF DESTRUCTION: Written documentation by a records destruction or recycling contractor or vendor that attests to the completion of the destruction process after the destruction of VA records has taken place. This certification is not considered a valid certification of destruction if submitted prior to the actual destruction of the records. Certifications of destruction shall be maintained in accordance with applicable VA Records Control Schedules and shall only be accepted from data destruction or recycle vendors after final destruction has actually taken place. VA personnel responsible for the final destruction of temporary records will develop a tracking method for ensuring that a certification of destruction is submitted for every shipment of such records released to data destruction or recycling vendor.
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. DELIVERABLE. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8. QUALITY ASSURANCE. The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.
2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime Contractor. The Government does not have privity of contract with the sub-Contractor.
2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
CFR Code of Federal Regulations
COR Contracting Officer Representative
COTS Commercial-Off-the-Shelf
FAR Federal Acquisition Regulation
HIPAA Health Insurance Portability and Accountability Act of 1996
CO Contracting Officer
NAID National Association of Information Destruction
OCI Organizational Conflict of Interest
PIPO Phase In/Phase Out
POC Point of Contact
PRS Performance Requirements Summary
PWS Performance Work Statement
QA Quality Assurance
QAP Quality Assurance Program
QASP Quality Assurance Surveillance Plan
QC Quality Control
QCP Quality Control Program
TE Technical Exhibit
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1 The Government will provide escort as necessary for container access.
3.2 The Government will provide space for placement of containers.
3.3 The VA reserves the right to increase or decrease the number of consoles by 10% as needed by submitting a request in writing at least 30 days in advance.
3.4 Consoles shall be provided, maintained, increased, decreased, and replaced at no charge to the Veterans Administration (VA).
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 GENERAL: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2 KEYS: will be provided to the Contracting Officer s Representative (COR), ONLY.
4.3. MATERIALS: Contractor will supply keys to the VAMC COR for access to the secured containers for retrieval of documents and other items inadvertently placed in collection containers.
4.4. CONTINGENCY PLAN: Contractor must have a contingency plan in the event the on-site shredder arrives at the VA or CBOC and is unable, malfunctioned, or is incapable of shredding on-site service. The contractor contingency plan must incorporate same day on site shredding and destruction and must notify the COR when in use and the type shredding process utilized.
4.5. POST AWARD CONFERENCE/PERIODIC PROGRESS MEETINGS: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. The written minutes of these meeting shall be signed by the contractor's manager, Contracting Officer, and COR. If the contractor does not concur with the minutes, notice of non-concurrence shall be provided to the Contracting Officer. This notice shall be in writing and provided within seven work days of receipt of the minutes. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
4.6. KEY PERSONNEL: The follow personnel are considered key personnel by the Government: The Contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the Contracting Officer. The contract manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available within 3 hours Monday thru Friday except Federal holidays or when the Government facility is closed for administrative reasons, to meet on the installation with government personnel designated by the Contracting Officer to discuss problem areas anytime the work is performed at the designated sites.
4.7. IDENTIFICATION OF CONTRACTOR EMPLOYEES: Contractor personnel shall present a net appearance and be easily recognized. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges which contain the company name and employee name. All employees and representatives of the Contractor must be fluent enough in the English language to read and understand chemical labels/signs and to converse intelligibly with the COR
4.10 The Contractor shall randomly drug test on an annual basis and shall perform a criminal background screening on any employee performing the service of this contract.
4.11 The Contractor shall assign a Project Manager for the purpose of coordination, oversight, and management of this contract. All contract employees shall present a neat, clean appearance, well-groomed, and be easily recognized while working. While on the premises, contract employees shall wear a company uniform with a visible identification badge which shall contain a picture of the employee.
4.12 The Contractor shall provide only personnel who are knowledgeable of all sites and locations of collection bins. Upon arrival, the contract employee shall check in with the COR or with Environmental Management Service to be assigned an escort. Contract employees shall not be on any federally owned or leased property without an escort.
4.13 The Contractor shall ensure that access to Personally Identifiable Information (PII) is limited to authorized personnel and shall be kept in strict confidentiality. The Contractor is further informed that in accordance with provisions of the Privacy Act and Health Insurance Portability and Accountability Act of 1996 (HIPPA), criminal penalties may result for knowingly and willfully disclosing information of this type. The Contractor shall provide documentation of a contingency plan in the event of equipment failure or unexpected events.
4.14 Contract employees shall be subject to the provisions of Public Law 93-579, Privacy Act of 1974, Health Insurance Portability and Accountability Act of 1996 (HIPPA), applicable Federal and VA confidentiality and security laws and regulations, and Joint Commission Standards.
4.15 The Contractor shall maintain liability insurance for the duration of the contract, and shall follow all federal, state, and VA regulations regarding the transportation and destruction of classified medical documentation.
4.16 PHASE IN /PHASE OUT PERIOD: To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have personnel on board, during the (30) day, phase in/ phase out periods. During the phase in period, the Contractor shall become familiar with performance requirements in order to commence full performance of services on the contract start date.
4.17 The Contractor shall provide secured containers, AT NO ADDITIONAL COST TO THE GOVERNMENT, for the discarding of confidential documents. All containers shall have a slotted lid allowing for the discarding of confidential documents and shall have a locking device to limit access. The following sizes are required (no larger than);
Regular Consoles 19 L X 19 W X 40 H
Small Consoles 12 L X 12 W X 12 H (non-paper media)
Rolling Bins 96 gallon
PART 5
SPECIFIC TASKS
5. SPECIFIC TASKS. The NAID Certified Contractor shall provide a certificate of final destruction for each shipment. Interim destruction of documents is required on-site. The documents shall consist of but is not limited to: sensitive and non-sensitive papers at the specified locations. The interim destruction contents shall be securely transported in a NAID approved vehicle to a NAID approved location to await final destruction. Final destruction of documents shall be witnessed by the certified contractor. The contractor shall attest to said destruction in writing and submit the attestation to the organization that created the document, the CONTRACTING OFFICER, and the COR. The service provided shall comply with VHA Directives 6371.
5.1. The contractor shall provide on-site interim document destruction at each designated location. Interim On-site Document Destruction shall consist of pierce, tear shred so that information cannot be read or reconstructed without a considerable amount of effort.
5.2. The contractor shall provide a Certificate of Interim Document Destruction for each shipment at each facility. A certificate of interim document destruction shall be provided to the facility generating the records for interim destruction at the close of each service day.
5.3. The contractor shall provide a pdf Certificate of Final Destruction to the CONTRACTING OFFICER, COR and facility generating the records for final destruction for each shipment.
5.4. The contractor shall provide chain of custody documentation for each shipment at each facility until final destruction. When a shipment is finally destroyed a chain of custody letter shall be provided to the facility for that shipment. It shall state the dates and times of each stage of destruction during the contractor s custody of the shipment.
5.5. Consoles shall be placed in designated areas in the medical center and other VA Facilities. Locations of consoles continuously change. Rolling bins will be available for use on an as needed basis. Contractor shall remove discarded confidential documents from EACH secured container.
5.6. All shredding services (interim destruction) shall be conducted on government-owned or leased properties herein. Contract employees shall go to the locations of consoles, remove materials from the locked containers and transfer them to a secured location until destruction. The Contractor shall destroy all paper products removed from the VA Medical Center and the other VA Facilities, through an acceptable process which renders the paper completely unreadable, in accordance with the National Association for Information Destruction (NAID) standards and VA Directive 6371.
5.7 Consoles shall be provided, maintained, and replaced at no charge to the VA. Consoles shall be installed in specific locations by the Contractor. Changes in location of any console shall be by agreement of both the Government and the Contractor. Any console movement shall be accomplished by the Contractor.
5.8 Discarded confidential documents shall be transported in a secured container to the site of shredding at the G.V. Montgomery VA Medical Center or on other government owned or leased properties.
5.9 The shredder shall be of such capacity that limited quantities of incidentals such as paper clips, staples, rubber bands, pill bottles, patient plastic armbands, and other types of paper can be shredded. All shredded materials shall be removed from the G.V. Sonny Montgomery VAMC premises and shall be recycled if possible. The G.V. Sonny Montgomery VAMC WILL NOT be required to separate documents by color and WILL NOT be required to remove paper clips or fasteners.
5.10 The Contractor will provide a Certificate of Destruction to the Contracting Officer s Representative (COR), in Facility Management Service, Room 1-101, upon completion of service.
5.11 The Contractor shall shred (pulverize) the confidential documents to the point that they are unreadable, by utilizing a Contractor-owned vehicle(s) that has a built-in shredding system. All shredded (pulverized) materials shall be removed from the G.V. (Sonny) Montgomery VA Medical Center premises and shall be recycled. The Contractor shall provide a Certificate of Destruction to the Contracting Officer s Representative (COR), in Facility Management Service, Room 1-101, IMMEDIATELY, upon completion of service.
5.12 The Contractor shall clean up any residual material before leaving the site. Services will be performed each Tuesday, between the hours of 8:00 am and 4:30 pm. On the last Thursday of each month there will be a pick-up of the non-paper data media. Any changes to that schedule must be approved by the COR. The Contractor shall perform to the standards expressed in the contract and perform all tasks during these hours. All shredding shall take place at the Government-owned or leased facilities herein and shall be witnessed by a VA employee authorized to witness the destruction of sensitive VA material.
5.13 The selection, assignment, reassignment, transfer, supervision, management, and control of employees in performance of this work statement shall be the responsibility of the Contractor. However, the Contractor shall comply with the general intent and specific policies set forth in the performance work statement concerning conduct of employees as referenced herein. When the Government directs, the Contractor shall remove from performance on the contract any person who is identified as a potential threat to the health, safety, security, general well-being, or operation mission of the activity and its population.
5.14 When the Government directs, the Contractor shall remove from performance on the contract any person who is identified as a potential threat to the health, safety, security, general well-being, or operation mission of the activity and its population.
5.1.1 VA Facility
G.V. (Sonny) Montgomery Veterans Administration Medical Center
1500 East Woodrow Wilson Drive, Jackson, Mississippi 39216
Estimated number of regular lockable consoles: 219.
Pick-up: Every Tuesday (excluding Federal Holidays)
Estimated number of small lockable (non-paper media) consoles: 10
Pick-up: Every other Tuesday (excluding Federal Holidays)
Estimated number of lockable 96 gallon rolling bins: 10
Pick-up: Every Tuesday (excluding Federal Holidays)
5.1.2 VA Facility
715 S. Pear Orchard, Ridgeland, MS 39157
Estimated number of regular lockable consoles: 6
Pick-up: Every Tuesday (excluding Federal Holidays)
5.1.3 VA Facility
3531 Lakeland Drive, Flowood, MS 39232
Estimated number of regular lockable consoles: 1
Pick-up: Every Tuesday (excluding Federal Holidays)
5.1.4 VA Facility
4 Riverbend Drive, Flowood, MS 39232
Estimated number of regular lockable consoles: 4
Pick-up: Every Tuesday (excluding Federal Holidays)
5.1.5 VA Facility
8 Riverbend Drive, Flowood, MS 39232
Estimated number of regular lockable consoles: 4
Pick-up: Every Tuesday (excluding Federal Holidays)VA Facility
5.1.6 VA Facility
11 Riverbend Drive, Flowood, MS 39232
Estimated number of regular lockable consoles: 5
Pick-up: Every Tuesday (excluding Federal Holidays)
5.1.7 VA Facility
100 Spring Lake Cove, Pearl, MS 39208
Estimated number of regular lockable consoles: Pick-up: Every Tuesday (excluding Federal Holidays)
Estimated number of lockable 96-gal rolling bins: '16 Pick-up: Every Tuesday (excluding Federal Holidays)
5.1.8 OPERATIONS
5.1.8.1 Numbers and locations of consoles are continuously changing. Rolling bins will be available for use by the medical center on an as needed basis. Contractor shall remove discarded confidential documents from EACH secured container on Tuesday of every week during administrative work hours, 8:00 am to 4:30 pm. (Please note: there are some containers that will not require removal of discarded confidential documents every week due to the volume of documents; however, the Contractor shall check EACH secured container each week). Small consoles, for non-paper media data, placed in various locations throughout the medial center, will ONLY be picked-up on the last Tuesday of the month.
5.1.8.2 All shredding services shall be provided on government-owned or leased properties herein. Contract employees shall go to the locations of consoles, remove materials from the locked containers, and transfer them to a secured location until destruction.
PART 6
APPLICABLE PUBLICATIONS
6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
VA Directive 6371, Destruction of Temporary Paper Records
VA Directive 6502, VA Enterprise Privacy Program
VA Handbook 6500, Information Security Program
National Institute of Standards and technology (NIST)
National Association for Information Destruction (NAID)
Public Law 93-579 Privacy Act of 1974.
Health Insurance Portability and Accountability Act of 1996 (HIPPA)
VA confidentiality and security laws and regulations, and the Joint Commission Standards.
PART 7
ATTACHMENT/TECHNICAL EXHIBIT LISTING
Attachment/Technical Exhibit List:
Attachment 1/Technical Exhibit 1 Performance Requirements Summary
Attachment 2/Technical Exhibit 2 Deliverables Schedule
Attachment 3/Technical Exhibit 3 Sample Quality Assurance Plan
TECHNICAL EXHIBIT 1
Performance Requirements Summary
The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective
Standard
Performance Threshold Acceptable Quality Level
Method of Surveillance
Incentives
PRS # 1.
Interim On-site Document Destruction shall consist of pierce, tear shred so that information cannot be read or reconstructed without a considerable amount of effort.
PWS paragraph 5.1.
VHA Directives 6371.
Zero Deviations
100% Inspection
Exercise of Options Performance Reporting
PRS # 2
A certificate of interim document destruction shall be provided to the facility generating the records for interim destruction at the close of each service day.
PWS paragraph 5.2.
VHA Directives 6371.
Zero Deviations
100% Inspection
Exercise of Options Performance Reporting
PRS # 3
The contractor shall provide a pdf Certificate of Final Destruction to the Contract Officer, COR and facility generating the records for final destruction for each shipment.
PWS paragraph 5.3.
VHA Directives 6371.
Zero Deviations
100% Inspection
Exercise of Options Performance Reporting
PRS # 4
The contractor shall provide chain of custody documentation for each shipment at each facility.
PWS paragraph 5.4.
VHA Directives 6371.
Zero Deviations
100% Inspection
Exercise of Options Performance Reporting
TECHNICAL EXHIBIT 2
Deliverables Schedule
Deliverable
Frequency
# of Copies
Medium/Format
Submit To
Quality Control Plan shall be delivered with the contractor s proposal
One time with contractor s proposal.
Within 5 working days when changes are made.
1 copy
PDF Document
Contracting Officer
Proof of NAID Certification
With Proposal
1 copy
PDF Document
Contracting Officer
Proof of Insurance
With Proposal
1 copy
PDF Document
Contracting Officer
BAA
With Proposal
1 copy
PDF Document
Contracting Officer
Sample Certificate
Of Destruction
With Proposal
1 copy
PDF Document
Contracting Officer
Interim Destruction
Documentation
Each shipment of records released to the data destruction contractor
3 copies
Printed & Signed
PDF copy to
Facility
COR & CO
Certificate of Destruction
Each shipment of records released to the data destruction contractor.
3 copies
Printed & Signed
PDF copy to
Facility
COR & CO
The Period of Performance is scheduled for a Base period with 4, one-year options.
Base Period: Date of award to September 30, 2020
Option 1: October 1, 2020 thru September 30, 2021
Option 2: October 1, 2021 thru September 30, 2022
Option 3: October 1, 2022 thru September 30, 2023
Option 4: October 1, 2023 thru September 30, 2024
B.3 PRICE SCHEDULE
ITEM INFORMATION
ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
0001
32 weeks
Mo
Document Destruction in accordance with Statement of Work. 270 consoles at different locations in Jackson area
Contract Period: Base
POP Begin: 02-01-2020
POP End: 09-30-2020
SUBTOTAL BASE YEAR
ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1001
52 weeks
Mo
Document Destruction in accordance with Statement of Work. 270 consoles at different locations in Jackson area.
Contract Period: Option 1
POP Begin: 02-01-2021
POP End: 01-31-2022
SUBTOTAL OPTION 1
SUBTOTAL BASE & OPTION 1
ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
2001
52 weeks
Mo
Document Destruction in accordance with Statement of Work. 270 consoles at different locations in Jackson area
Contract Period: Option 2
POP Begin: 02-01-2022
POP End: 01-31-2023
SUBTOTAL OPTION 2
SUBTOTAL OPTION 1 & 2
ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
3001
52 weeks
MO
Document Destruction in accordance with Statement of Work. 270 consoles at different locations in Jackson area.
Contract Period: Option 3
POP Begin: 02-01-2023
POP End: 01-31-2024
SUBTOTAL OPTION 3
SUBTOTAL OPTION 1, 2 & 3
ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
4001
52 weeks
MO
Document Destruction in accordance with Statement of Work. 270 consoles at different locations in Jackson area
Contract Period: Option 4
POP Begin: 02-01-2024
POP End: 01-31-2025
SUBTOTAL OPTION 4
NOTE: FAR 52.217-8 Option to Extend Services , not to exceed six (6) months in total for this contract. The specified rates under this clause will be those rates in effect under the contract each time an option is exercised under this clause.
GRAND TOTAL BASE AND ALL OPTIONS
Award shall be made to the quoter whose quotation conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The government will evaluate information based on the following evaluation criteria: Evaluation and award will be conducted in accordance with the requirements of FAR 13.106-2(b)(3), the quotes will undergo a comparative evaluation to determine which contractor provides the best value to the government in terms of technical capability, while also providing a competitive price.
The full text of FAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html.
FAR Number
Title
Date
52.212-1
INSTRUCTIONS TO OFFERORS COMMERCIAL ITEMS
OCT 2018
ADDENDUM to FAR 52.212-1 INSTRUCTIONS TO OFFERORS COMMERCIAL ITEMS
Provisions that are incorporated by reference (by Citation Number, Title, and Date), have the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
The following provisions are incorporated into 52.212-1 as an addendum to this solicitation:
Evaluation of Quote
The Government will award a contract resulting from this solicitation to the responsible contractor whose quote conforming to the solicitation will be most advantageous to the Government, price and other factors considered.
EVALUATION PROCEDURES AND AWARD
Evaluation and award will be conducted in accordance with the requirements of FAR 13.106-2(b)(3), the quotes will undergo a comparative evaluation to determine which contractor provides the best value to the government in terms of technical capability, while also providing a competitive price.
For quotes to be considered acceptable and eligible for evaluation, they must be prepared in accordance with and in compliance with the instructions given in this solicitation and address all the requirements set forth within this solicitation. The Government does not anticipate requesting revisions to quotes, so Quoter s should provide their best quote in the response to this solicitation. However, the Government reserves the right to request quote revisions that seek additional price discounts, provide revisions to the technical and or prices aspects of the quote, or to clarify aspects of the quote. In the event quote revisions are requested, the Government will not necessarily be seeking revisions from all Quoter s. The Government will not be conducting "discussions" as defined in FAR Part 15.
Prospective Contractors are required to submit two separate evaluation documents in addition to all other documents required by this solicitation. If the parts are not submitted as separate documents, the quote will be considered non-responsive. If both Parts are not received, the quote will be considered non-responsive, and will not be considered for award.
One (1) Part A - Content of the Non-Price Factors/Technical Part.
The Quoter shall provide a technical approach that details how the requirements of the SOW will be accomplished. At a minimum, this shall include the following:
1. The intended strategy to complete all tasks as described in the SOW. A description of the company s technical ability to provide Microbiological Testing Services in accordance with the terms, conditions, specifications, and requirements of the solicitation and resulting contract. The narrative summary may describe the Contractor s capability, stability and strengths.
2. An account of the Quoter s comparable experience, in terms of size, scope, and complexity to the tasks described in the Statement of Work.
3. Technical Acceptability will be based upon the conformance to the guidelines outlined in this solicitation. Quotes will be evaluated on a GO, NO-GO basis. The technical evaluation will evaluate the technical content received as required in the instructions of this solicitation. This is a subjective evaluation that is based upon the Governments judgment as to whether the Quoter has satisfactorily addressed the technical content requirements as set forth within this solicitation.
One (1) Part B Price and price related factors.
1. Price - The contractor shall provide a separate and complete price schedule as provided in the solicitation including all offered discounts.. See Section B3.
2. A Quoter s price quote will be evaluated for reasonableness. For a price to be reasonable, it must represent a price to the Government that a prudent person would pay when consideration is given to prices in the market. Normally, price reasonableness is established through adequate price competition, but may also be determined through price analysis techniques as described in FAR 13.106-3.
(End of Addendum)
The full text of FAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html.
The following solicitation provisions apply to this acquisition:
FAR 52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
FAR 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016)
FAR 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
FAR 52.233-2 SERVICE OF PROTEST (SEP 2006)
As prescribed in 33.106 , insert the following provision:
Service of Protest (Sept 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from ______________________. [Contracting Officer designate the official or location where a protest may be served on the Contracting Officer.]
(b) The copy of any protest shall be received in the office designated above within oneday of filing a protest with the GAO.
(End of provision)
VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)
As prescribed in 833.106-70(a), insert the following provision:
PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)
(a) Any protest filed by an interested party shall
(1) Include the name, address, fax number, and telephone number of the protester;
(2) Identify the solicitation and/or contract number;
(3) Include an original signed by the protester or the protester's representative and at least one copy;
(4) Set forth a detailed statement of the legal and factual grounds of the protest, including a description of resulting prejudice to the protester, and provide copies of relevant documents;
(5) Specifically request a ruling of the individual upon whom the protest is served;
(6) State the form of relief requested; and
(7) Provide all information establishing the timeliness of the protest.
(b) Failure to comply with the above may result in dismissal of the protest without further consideration.
(c) Bidders/offerors and Contracting Officers are encouraged to use alternative dispute resolution (ADR) procedures to resolve protests at any stage in the protest process. If ADR is used, the Department of Veterans Affairs will not furnish any documentation in an ADR proceeding beyond what is allowed by the Federal Acquisition Regulation.
(End of provision)
VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)As prescribed in 833.106-70(b), insert the following provision:
ALTERNATE PROTEST PROCEDURE (OCT 2018)
(a) As an alternative to filing a protest with the Contracting Officer, an interested party may file a protest by mail or electronically with: Executive Director, Office of Acquisition and Logistics, Risk Management and Compliance Service (003A2C), Department of Veterans Affairs, 810 Vermont Avenue, NW, Washington, DC 20420 or Email: EDProtests@va.gov.
(b) The protest will not be considered if the interested party has a protest on the same or similar issue(s) pending with the Contracting Officer.
(End of provision)
VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED BY REFERENCE (JAN 2008)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
The following contract clauses apply to this acquisition:
FAR 52.212-4, CONTRACT TERMS AND CONDITIONS COMMERCIAL ITEMS (OCT 2018)
Clauses that are incorporated by reference (by Citation Number, Title, and Date), have the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
The following clauses are incorporated into 52.212-4 as an addendum to this contract: Insert a statement regarding any addenda to FAR 52.212-4]
FAR 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (APR 2014)
FAR 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY 2011)
FAR 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)
FAR 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
FAR 52.228-5 SUPPLEMENTAL INSURANCE REQUIREMENTS (JAN 1997)
FAR 52.232-18 AVAILABILITY OF FUNDS APR 1984
FAR 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013)
FAR 52.246-4 INSPECTION OF SERVICES FIXED-PRICE AUG 1996
VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)
VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE OR (JUL 2019) (DEVIATION)
VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING MONITORING AND COMPLIANCE (JUL 2018)
VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)
VAAR 852.237-70 CONTRACTOR RESPONSIBILITIES (APR 1984)
VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008)
CL-120 SUPPLEMENTAL INSURANCE REQUIREMENTS
In accordance with FAR 28.307-2 and FAR 52.228-5, the following minimum coverage shall apply to this contract:
(a) Workers' compensation and employer s liability: Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 is required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.
(b) General Liability: $500,000.00 per occurrences.
(c) Automobile liability: $200,000.00 per person; $500,000.00 per occurrence and $20,000.00 property damage.
(d) The successful bidder must present to the Contracting Officer, prior to award, evidence of general liability insurance without any exclusionary clauses for asbestos that would void the general liability coverage.
(END-OF-CLAUSE)
(End of Addendum to 52.212-4)
FAR 52.212-3, OFFERORS REPRESENTATIONS AND CERTIFICATIONS COMMERCIAL ITEMS OCT 2018
Offerors must complete annual representations and certifications on-line at http://orca.bpn.gov in accordance with FAR 52.212-3, Offerors Representations and Certifications Commercial Items. If paragraph (j) of the provision is applicable, a written submission is required.
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far/index.html
http://www.va.gov/oal/library/vaar/
(End of Clause)
FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders (MAY 2019)
The following subparagraphs of FAR 52.212-5 are applicable:
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
FAR 52.203-19, PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)
FAR 52.204 23, PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (JUL 2018)
FAR 52.209-10, PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV 2015).
FAR 52.233-3, PROTEST AFTER AWARD (AUG 1996)
FAR 52.233-4, APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
FAR 52.203-19, PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)
FAR 52.204 23, PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (JUL 2018)
FAR 52.209-10, PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV 2015).
FAR 52.233-3, PROTEST AFTER AWARD (AUG 1996)
FAR 52.233-4, APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
FAR 52.203-6 , RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEPT 2006)
FAR 52.204 10, REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (OCT 2018)
FAR 52.209-6, PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT. (OCT 2015)
FAR 52.219-4, NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS CONCERNS (OCT 2014)
FAR 52.219-28, POST AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)
FAR 52.222-3, CONVICT LABOR (JUNE 2003)
FAR 52.222-17, NONDISPLACEMENT OF QUALIFIED WORKERS (MAY 2014) (E.O. 13495)
FAR 52.222-21, PROHIBITION OF SEGREGATED FACILITIES (APR 2015).
FAR 52.222 26, EQUAL OPPORTUNITY (SEP 2016)
FAR 52.222-36, EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)
FAR 52.222-40, NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010) (E.O. 13496)
FAR 52.222-41, SERVICE CONTRACT LABOR STANDARDS (AUG 2018)
FAR.52.222-42, STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)
FAR 52.222-43, FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT LABOR STANDARDS--PRICE ADJUSTMENT (MULTIPLE YEAR AND OPTION CONTRACTS) (AUG 2018)
FAR 52.222-50, COMBATING TRAFFICKING IN PERSONS (JAN 2019)
FAR 52.222-53, EXEMPTION FROM APPLICATION OF THE SERVICE CONTRACT LABOR STANDARDS TO CONTRACTS FOR CERTAIN SERVICES REQUIREMENTS (MAY 2014)
FAR 52.222-55, MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC 2015)
FAR 52.222-62, PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2017) (E.O. 13706)
FAR 52.223-18, ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (AUG 2011)
FAR 52.225-13, RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)
FAR 52.232-33, PAYMENT BY ELECTRONIC FUNDS TRANSFER SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
(End of Clause)
All quoters shall submit the following: one (1) electronic copy of all documents required by this Combined Synopsis.
All quotations shall be sent to the email address Anthony.Mitchell4@va.gov.
This is an open-market combined synopsis/solicitation for Document Shredding Service, as defined herein. The government intends to award a contract as a result of this combined synopsis/solicitation that will include the terms and conditions set forth herein.
Submission shall be received not later than Thursday 11:59 PM January 16, 2020 to email address anthony.mitchell4@va.gov. Late submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f). Only e-mailed quotes will be accepted].
Any questions or concerns regarding this solicitation should be forwarded in writing via e-mail to the Contracting Officer, Anthony R. Mitchell at anthony.mitchell4@va.gov not later than close of business 4:30 PM, Monday, January 13, 2020. Requests for Information will not be accepted after this date.
Point of Contact
Contracting Officer, (318) 990-4068. Fax number (405) 456-7653, anthony.mitchell4@va.gov.
Files
| File | Type | Posted |
|---|---|---|
| 36C25620Q0181-0003003.docx | DOCX document | |
| 36C25620Q0181-0002000.docx | DOCX document | |
| 36C25620Q0181-0001000.docx | DOCX document | |
| 36C25620Q0181-000.docx | DOCX document | |
| 36C25620Q0181-001.docx | DOCX document | |
| 36C25620Q0181-002.docx | DOCX document |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity