FY20 Base +4 Year Document Destruction
Solicitation number
36C25620Q0181
Issued by

About this file

36C25620Q0181 S02 Attachment QASP Document Shredding.docx

View the file

Other files

File Type Posted
36C25620Q0181-0003003.docx DOCX document
36C25620Q0181-0002000.docx DOCX document
36C25620Q0181-0001000.docx DOCX document
36C25620Q0181-000.docx DOCX document
36C25620Q0181-001.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C256-20-Q-0181

TECHNICAL EXHIBIT 3

QUALITY ASSURANCE SURVEILLANCE PLAN

For: Document Destruction

Contract Number: ________________

Contract Description: Network Contracting Office (NCO) 16 in support of G.V. (Sonny) Montgomery VA Medical Center has a need for Document Destruction. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform on-site interim shredding services of confidential and sensitive documents in accordance with the National Institute of Standards and Technology (NIST) and the National Association for Information Destruction (NAID). The NAID certified contractor will provide service for document destruction to include but is not limited to non-paper data media, (such as CDs and floppy disks) as defined in this Performance Work Statement. The NAID certified contractor shall provide attestation of final document destruction for each shipment of records for the G.V. (Sonny) Montgomery VA Medical Center, 1500 East Woodrow Wilson Drive, Jackson, Mississippi, 39216, in accordance with all local, state, and/or federal requirements and the terms and conditions stated herein.

Contractor’s name: ____________________________________

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

· What will be monitored.

· How monitoring will take place.

· Who will conduct the monitoring.

· How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned CO:

b. Contracting Officer’s Technical Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned COR: _________________

Alternate COR: _________________

c. Other Key Government Personnel: __________________

3. CONTRACTOR REPRESENTATIVES

The following employees of the contractor serve as the contractor’s program manager for this contract.

a. Program Manager: ______________

b. Other Contractor Personnel: ___________________ Title: _________________

4. PERFORMANCE STANDARDS

Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.

Performance Objective
Standard
Performance Threshold Acceptable Quality Level
Method of Surveillance
Incentives

PRS # 1.

Interim On-site Document Destruction shall consist of pierce, tear shred so that information cannot be read or reconstructed without a considerable amount of effort.

PWS paragraph 5.1.

VHA Directives 6371.

Zero Deviations
100% Inspection
Exercise of Options Performance Reporting

PRS # 2

A certificate of interim document destruction shall be provided to the facility generating the records for interim destruction at the close of each service day.

PWS paragraph 5.2.

VHA Directives 6371.

Zero Deviations
100% Inspection
Exercise of Options Performance Reporting

PRS # 3

The contractor shall provide a pdf Certificate of Final Destruction to the Contract Officer, COR and facility generating the records for final destruction for each shipment.

PWS paragraph 5.3.

VHA Directives 6371.
Zero Deviations
100% Inspection
Exercise of Options Performance Reporting

PRS # 4

The contractor shall provide chain of custody documentation for each shipment at each facility.

PWS paragraph 5.4.

VHA Directives 6371.
Zero Deviations
100% Inspection
Exercise of Options Performance Reporting

5. INCENTIVES

The Government shall use exercise of option period and past performance as incentives. Incentives shall be based on exceeding, meeting, or not meeting performance standards.

6. METHODS OF QA SURVEILLANCE

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

PERIODIC INSPECTION: Inspections may be scheduled at each pickup date.

Performance Standard ID – 1, 2, 3 and 4

7. RATINGS

Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:

Excellent = Exceeds Standards Satisfactory = Meets Standards Unsatisfactory = Fails to Meet Standards

8. DOCUMENTING PERFORMANCE

a. ACCEPTABLE PERFORMANCE

The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.

b. UNACCEPTABLE PERFORMANCE

When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.

When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR) and present it to the contractor's program manager with a copy to the Contracting Officer.

The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.

Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.

9. FREQUENCY OF MEASUREMENT

a. Frequency of Measurement.

During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.

b. Frequency of Performance Assessment Meetings.

The COR shall meet with the contractor monthly to assess performance and shall provide a written assessment.

<After award, both the contractor’s Program Manager and the COR shall sign this document.>

Signature – Contractor Program Manager

Signature – Contracting Officer’s Technical Representative