Foster Dam Fish Ladder Crane Demolition

Award Notice Posted

Solicitation number
W9127N17Q0045
Agency
Awarded
to Northbank Civil And Marine, LLC
Set-aside
Total Small Business

Opportunity facts

Contract number
W9127N17P0136 Federal contract award
NAICS code
238910 Site Preparation Contractors
PSC
Not on record
Place of performance
http://www.nwp.usace.army.mil/Locations/Willamette-Valley/Foster/ Sweet Home, Oregon 97386, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

A question was posed, from a potential offeror, "Will the government be providing all traffic control measures?" In response to this question, Foster Dam will provide cones and signage for the closure, any additional items would need to be provided by the contractor.

 

Update #2 ·

The pre-solicitation notice is canceled, and the solicitation will be posted to FBO later today.

Update #1 ·

Foster Dam Fish Ladder Crane Demolition

The fish ladder gantry Crane at Foster Dam was built in 1964 as part of the original Adult Fish Facility. The crane was used to transport fish upstream to the crest of the dam and into the reservoir or trucks. The hopper is currently out of service for maintenance and associated safety concerns. The crane is a concrete structure crossing the entire roadway 35 feet above the deck and is permanently fixed in five places to the dam structure adjacent to the spillway. The crane has various electrical fixtures and mechanical equipment that hang down over the roadway and limit access to the spillway deck. Demolition and removal of the existing crane will allow ease and access Foster Project Operations. The removal of the existing crane will ease the installation of Foster's fish weir and stoplogs, provide access and egress for trucks delivering the Project's fish weir and stoplogs, and eliminate height restrictions for hauling materials to the weir worksite. The demolition involves removing all equipment from the crane including all electrical fixtures, hoists, gearboxes, drums, and electrical conduit. The concrete structure shall be removed down to the deck elevation on both the upstream and downstream sides of the roadway. The gearbox for the hoisting equipment has been drained, but there is residual oil in the gearbox and grease on various components.


The Contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to demolish the fish ladder gantry crane at Foster Dam and fabricate and install supports for the existing crane way stairs (this can be found in Attachment III labeled DWG FSD-2-40). This firm fixed priced service contract has a Period of Performance from the Date of Award, to Close of Business, 2 February 2018. There are no option years or optional items associated with this contract.