ITEMS TO DEMOLISH

NOTES:

1. REMOVE CRANE, CRANEWAY CATWALK, AND RAILING.

2. REMOVE TROLLEY AND ALL ASSOCIATED EQUIPMENT.

OIL HAS BEEN DRAINED BUT RESIDUAL OIL MAY REMAIN.

3. DEMOLISH THE DOWNSTREAM LEGS OF THE CONCRETE

GANTRY CRANE FRAME TO EL. 654.83 (TOP OF HOPPER

SHAFT BARRIER). REFERENCE FSD-2-89, ALUMINUM

HANDRAILS ROADWAY DECK.

4. DEMOLISH THE UPSTREAM LEGS OF THE CONCRETE

GANTRY CRANE FRAME TO THE TOP OF ROADWAY

RAILING.

5. GUARD RAILS TO BE REMOVED.

6. CONTRACTOR TO DESIGN, FABRICATE, AND INSTALL

NEW GUARD RAIL FOR THE EXISTING ALUMINUM ACCESS

PLATFORM ATTACEHD TO THE ELEVATOR BUILDING. NEW

GUARD RAIL MUST MEET THE REQUIREMENTS OF

EM385-1-1, SUBMIT ALL RELATED SHOP DRAWINGS TO

THE GOVERNMENT FOR APPROVAL PRIOR TO

FABRICATION. REFERENCE DWG FSD-2-88.

6. ANY MICELLANEOUS ATTACHMENTS TO THE EXISTING

STRUCTURE WHICH ARE NOT SHOWN ON THESE

DRAWINGS SHALL BE NOTED BY THE CONTRACTOR IN AN

RFI THAT WILL REQUIRE GOVERNMENT APPROVAL.

7. ALL EXISTING EMBEDED CONDUITS TO THE EXISTING

GANTRY CRANE SHALL BE DEMOLISHED.

G2ECDJTH

Polygonal Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Polygonal Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Rectangle

G2ECDJTH

Line

G2ECDJTH

Group

G2ECDJTH

Line

1. REMOVE CRANE, CRANEWAY CATWALK, AND RAILING.

2. REMOVE TROLLEY AND ALL ASSOCIATED EQUIPMENT. OIL HAS BEEN DRAINED

BUT RESIDUAL OIL MAY REMAIN.

3. DEMOLISH THE DOWNSTREAM LEGS OF THE CONCRETE GANTRY CRANE FRAME

TO EL. 654.83 (TOP OF HOPPER SHAFT BARRIER). REFERENCE FSD-2-89, ALUMINUM

HANDRAILS ROADWAY DECK.

4. DEMOLISH THE UPSTREAM LEGS OF THE CONCRETE GANTRY CRANE FRAME TO

THE TOP OF ROADWAY RAILING.

5. GUARD RAILS TO BE REMOVED. CONTRACTOR TO DESIGN, FABRICATE, AND

INSTALL NEW GUARD RAIL FOR THE EXISTING ALUMINUM ACCESS PLATFORM

ATTACEHD TO THE ELEVATOR BUILDING. NEW GUARD RAIL MUST MEET THE

REQUIREMENTS OF EM385-1-1, SUBMIT ALL RELATED SHOP DRAWINGS TO

THE GOVERNMENT FOR APPROVAL PRIOR TO FABRICATION. REFERENCE DWG

FSD-2-88.

6. ANY MICELLANEOUS ATTACHMENTS TO THE EXISTING STRUCTURE WHICH ARE

NOT SHOWN ON THESE DRAWINGS SHALL BE NOTED BY THE CONTRACTOR IN AN

RFI THAT WILL REQUIRE GOVERNMENT APPROVAL.

7. ALL EXISTING EMBEDED CONDUITS TO THE EXISTING GANTRY CRANE SHALL BE

DEMOLISHED.

ITEMS TO DEMOLISH

G2ECDJTH

Polygon

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Polygonal Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Polygonal Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Rectangle

G2ECDJTH

Line

G2ECDJTH

Line

ITEMS TO DEMOLISH

1. REMOVE CRANE, CRANEWAY CATWALK, AND

RAILING.

2. REMOVE TROLLEY AND ALL ASSOCIATED

EQUIPMENT. OIL HAS BEEN DRAINED BUT

RESIDUAL OIL MAY REMAIN.

3. DEMOLISH THE DOWNSTREAM LEGS OF THE

CONCRETE GANTRY CRANE FRAME TO EL. 654.83

(TOP OF HOPPER SHAFT BARRIER). REFERENCE

FSD-2-89, ALUMINUM

HANDRAILS ROADWAY DECK.

4. DEMOLISH THE UPSTREAM LEGS OF THE

CONCRETE GANTRY CRANE FRAME TO THE TOP

OF ROADWAY RAILING.

5. GUARD RAILS TO BE REMOVED.

6. ANY MICELLANEOUS ATTACHMENTS TO THE

EXISTING STRUCTURE WHICH ARE NOT SHOWN

ON THESE DRAWINGS SHALL BE NOTED BY THE

CONTRACTOR IN AN

RFI THAT WILL REQUIRE GOVERNMENT

APPROVAL.

7. ALL EXISTING EMBEDED CONDUITS TO THE

EXISTING GANTRY CRANE SHALL BE

DEMOLISHED.

8. AS-BUILT ELECTRICAL DRAWINGS HAVE

BEEN PROVIDED IN THE INFORMATL

DRAWINGS. REFERENCE FSD-4-5 AND FSD-4-16.

G2ECDJTH

Polygonal Line

G2ECDJTH

Rectangle

G2ECDJTH

Rectangle

G2ECDJTH

Rectangle

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Rectangle

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

1. EXISTING GUARD RAILS TO BE REMOVED.

2. CONTRACTOR TO DESIGN, FABRICATE, AND INSTALL NEW GUARD RAIL FOR THE

EXISTING ALUMINUM ACCESS PLATFORM ATTACEHD TO THE ELEVATOR BUILDING.

3. NEW GUARD RAIL MUST BE INSTALLED AROUND THE PERIMETER OF THE CONCRETE

LANDING, STAIRS, AND ALUMINUM LANDING. GUARD RAIL MUST MEET THE

REQUIREMENTS OF EM385-1-1, SUBMIT ALL RELATED SHOP DRAWINGS TO THE

GOVERNMENT FOR APPROVAL PRIOR TO FABRICATION.

3. ANY MICELLANEOUS ATTACHMENTS TO THE EXISTING STRUCTURE WHICH ARE NOT

SHOWN ON THESE DRAWINGS SHALL BE NOTED BY THE CONTRACTOR IN AN RFI THAT

WILL REQUIRE GOVERNMENT APPROVAL.

ITEMS TO DEMOLISH

G2ECDJTH

Polygonal Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Polygonal Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Rectangle

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Polygonal Line

G2ECDJTH

Polygonal Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

G2ECDJTH

Line

FSD-2-40 CD-ELEVATOR BLDG EXTERIOR ELEVTS 60
FSD-2-57 CD-FF FISHLADR-CRANEWAY PLAN&SEC 77
FSD-10.0-3-18 2 FISHLADDER-CRANEWAY TROLLEY 158
FSD-2-88 2 CD-MM-CRANEWAY STAIR&RAILING DET 108

File details come from the government source that posted it. Updated .