Falls Campground Water System Replacement

Award Notice Posted

Solicitation number
AG-02NV-S-09-0038
Agency
Awarded
to Walton, Inc.
Set-aside
HUBZone

Opportunity facts

Contract number
AG-02NV-C-09-0020 Federal contract award
NAICS code
237110 Water and Sewer Line and Related Structures Construction
PSC
Not on record
Place of performance
Falls Campground Palisades Ranger District Idaho Falls, Idaho 83401, United States

Notice details come from SAM.gov. Updated .

Notice text

Added: Jul 01, 2009 5:00 pm The contractor will be required to provide all materials and labor to construct the Falls Campground Water System on the Palisades Ranger District for the U.S. Forest Service.

The project consists of the following:

1. Abandoning existing Falls CG water system, including abandoning existing well, removing and disposing of existing hydrants and piping where encountered.

2. Drill new solar powered well

3. Install Solar Panels, Electrical, and Electrical Line to Tank Float

4. Install 3000 gal storage tank

5. Install water distribution system

6. Install new hydrants



The Falls campground is located on the Palisades District, on the South Fork of the Snake River, Forest Service Road 058 approximately 2 miles west of Swan Valley, Idaho.



The magnitude of this project is estimated to range between $250,000 and $500,000.



A site visit will be held on July 28, 2009 at 10:00 a.m. The location of the site visit will be at the Falls Group Site. This will be addressed in the Drawings which along with the Request for Proposals (RFP) will be uploaded on or about July 15, 2009.



Work is anticipated to begin about August 24, 2009 to be completed by November 30, 2009.

Files

File Type Posted
Amendment 01.doc DOC document
SpecPackage.Falls.Final.2009.06.26.doc DOC document
DrawingPackage.Falls.Final.2009.07.01.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity