SpecPackage.Falls.Final.2009.06.26.doc
DOC document 1 MB Posted
- Attached to
- Falls Campground Water System Replacement
- Solicitation number
- AG-02NV-S-09-0038
About this file
Falls Campground Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 01.doc | DOC document | |
| DrawingPackage.Falls.Final.2009.07.01.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Important Information (this text is hidden):
1- Tracking changes – Microsoft Word has problems merging document in which track changes is turned on or where it has been on and the changes have not all been accepted. Before merging any documents make sure track changes is off and all changes have been accepted.
a. Ctrl+shift+E toggles “Track Changes” also you can toggle them through the menu pulldown “Tools – Track Changes”. When you toggle them the “Reviewing” toolbar is activated and which allows you to see and accept or reject changes.
2- When creating or editing specs, do not type notes or comments in or before the “PART-1 GENERAL” line. These may cause problems in specs reading in correctly.
a. Do not worry about those written by Masterspec. We know how to ignore them.
b. You can write all you want throughout the rest of the Spec, including loading up the end of the spec if you would like.
3- Contracting:
a. We try to save this first sheet for whatever contracting would like to add.
b. The header is also left blank for contracting. Edit the header anywhere and it will affect the header throughout this document. The footer is ours.
4- Section C and other non-specs must be added manually (see 3.a above).
5- Adding specs requires updating the list of specs, this may be done automatically through the “Specs” toolbar “TableOfContents” and “Update TOC” Buttons.
6- Be consistent when creating specs. Using different formatting within a single spec causes confusion for Microsoft Word and it will mess up your formatting.
7- This is created using 12 point font. Reading in specs of other font sizes will create minor font inconsistencies. You can change the font size upon completion of the spec package manually to whatever size you want for consistency sake.
8- Other Regions can use this; it is a minor programming change to correct R4 to something else. Send a request and a faxed picture of a large Hawaiian pizza to me and I will get right on it.
Section C - Description/Specifications/Statement of Work
GENERAL SPECIFICATIONS
FALLS CAMPGROUND WATER SYSTEM
(6/26/2009)
1.1 SCOPE OF CONTRACT
A. This project includes constructing a new water system for Falls Campground.
B. The work includes:
1. Drilling and equipping a new well.
2. Constructing a new utility building.
3. Installing a new water storage tank.
4. Constructing a new water distribution system.
5. Constructing a new solar-electrical system to power the well pump.
6. Improving an existing access road and installing a new gate.
7. Installing a new fence.
8. Abandoning an existing well.
9. Removing and disposing of existing structures (as designated).
1.2 PROJECT LOCATION
A. The project is located in the Palisades Ranger District of the Caribou-Targhee National Forest, Bonneville County, Idaho, in the north end of SEC11 T1N R43E. The latitude is 43° 26’ 03” North and the longitude 111° 21’ 45” West. The elevation is approximately 5,273 feet above sea level. It is located approximately 1.6 miles southwest of Swan Valley, Idaho. The project may be accessed from State Highway 26 and County Road 058.
1.3 SITE INFORMATION AND LIMITATIONS
A. The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:
1. Construction sites will be closed to the public during construction. The Forest Service will issue a closure order to the public. The Contractor will be responsible for signing and limiting public access.
2. Contractor will provide all materials and labor necessary to protect streams, wet or dry, during construction activities. The Contractor will be required to submit a stream protection plan and receive approval from the COR, in writing, prior to the beginning of construction.
3. All construction equipment shall be pressure washed before entering National Forest System lands. The removal of mud and debris from treds, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brushguard assemblies will be required. The purpose is to reduce or eliminate the transportation of noxious weeds, which is required by Federal and State regulations.
Pick and edit the following items to fit the project.
4. Utilities are not available at the site for construction purposes.
5. Toilet facilities are available at the site.
1.4 TRAFFIC CONTROL AND CONSTRUCTION SIGNING
A. No work that endangers, interferes, or conflicts with traffic or access to work sites shall be performed until a plan for satisfactory warning and handling of traffic has been submitted by the contractor and approved by the COR and Utah Department of Transportation. Construction signing for traffic control shall conform to the Manual of Uniform Traffic Control Devices (MUTCD). All traffic control signs will be placed in areas adequate for a truck pulling a fifth wheel trailer to be turned around. Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Schedule of Items.
1.5 WORK CAMPS, STAGING AND STORAGE AREAS
A. Areas for staging operations and storage of materials shall be approved by the CO. The Contractor must request in writing for approval from the CO to stage trailers (work or housing) on site.
B. Overnight camping will be allowed in designated camping sites only.
1.6 INSPECTION OF WORKSITE
A. The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work, and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.
1.7 START DATE
A. August 1, 2009.
1.8 CONTRACT TIME
A. 90 Calendar Days
1.9 SPECIFICATIONS
A. The following specifications are attached. Some sections in the schedule of items refer to other sections not listed and are subsidiary to, or are included in payment for other pay items in this contract. These items are considered incidental and no additional compensation will be made.
Section 011250 - Measurement And Payment Section 011900 - Mobilization Section 013300 - Submittal Procedures Section 014100 - Quality Control Section 024100 - Waste Material Disposal Section 024102 - Removal And Disposal Of Structures And Obstructions Section 033000 - Cast-In-Place Concrete Section 033020 - Concrete From Packaged Dry Mix For Minor Structures Section 042200 - Concrete Unit Masonry Section 061000 - Carpentry Section 061753 - Shop-Fabricated Wood Trusses Section 074113 - Metal Roof Panels Section 074600 - Soffit & Fascia Section 079200 - Joint Sealants Section 081113 - Hollow Metal Doors And Frames Section 087100 - Door Hardware Section 099000 - Painting Section 133401 - Utility Building Section 133402 - Utility Boxes Section 221100 - Water Distribution Systems Section 221102 - Curb Valves And Boxes Section 221103 - Plumbing Appurtenances Section 221105 - Water Hydrants Section 221120 - Submersible Well Pumps Section 221200 - Underground Water Storage Tank Section 260500 - Common Work Results For Electrical Section 260519 - Low-Voltage Electrical Power Conductors And Cables Section 260526 - Grounding And Bonding For Electrical Systems Section 260533 - Raceway And Boxes For Electrical Systems Section 260553 - Identification For Electrical Systems Section 269999 - Other Electrical Tests And Calibrations Section 311000 - Clearing And Grubbing Section 312000 - Earthwork Section 312225 - Excavation & Embankment Section 321204 - Crushed Aggregate Base Or Surface Course Section 322717 - Stock Gate Section 323116 - Gates For Roads Section 323150 - Post And Pole Fence Section 329206 - Seeding Section 332100 - Water Supply Wells
END OF SECTION C
MAY 2009
USDA FOREST SERVICE, R-4
FALLS CAMPGROUND WATER SYSTEM
SECTION 011250 - MEASUREMENT AND PAYMENT
PART 2 - GENERAL
2.1 SUMMARY
A. Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work, labor, materials, equipment, and incidentals necessary to successfully complete the project will be considered as included in the payment for items shown. This section defines the method of measurements and basis of payment for work items listed in the Schedule of Items.
B. When more than one class, size, type, thickness, etc. is specified in the Schedule of Items for any pay item, suffixes will be added to the item number to differentiate between the pay items.
2.2 DETERMINATION OF QUANTITIES
A. The following measurements and calculations shall be used to determine contract quantities for payment.
1. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting and erosion control blankets shall be along slope lines.
2. For excavation or embankment volumes, the average end area method shall be used to compute volumes. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three-dimensional methods.
3. For Structures, they shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions.
4. For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, piping, utilities, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed.
5. For aggregates weighed for payment, the tonnage shall not be adjusted for moisture content, unless otherwise provided for.
6. For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.
B. Earthwork Tolerances - Adjustments of horizontal or vertical alignment, within the tolerances specified in this contract, or shifts of balance points up to 100 feet shall be made by the contractor as necessary to produce the designed sections and to balance earthwork. Such adjustments shall not be considered as "Changes."
2.3 UNITS OF MEASUREMENT
A. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:
1. Acre: Make longitudinal and transverse measurements for area computations horizontally.
2. 50lb Bag: Measurement will be for the actual number of 50lb bags of standard bentonite grout.
3. 94lb Bag: Measurement will be for the actual number of 94lb bags of standard cement or grout.
4. Cubic Yard (CY): A measurement computed by one of the following methods:
a. Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.
b. Material in Place or Stockpile. The measurement computed using the dimensions of the in-place material.
c. Material in the Delivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery. Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.
5. Each (EA): One complete unit, which may consist of one or more parts.
6. Gallons (GAL): The quantity shall be measured by any of the following methods:
a. Measured volume in container.
b. Metered volume by approved metering system.
c. Commercially package volume.
7. Hour (HR): Measurement will be for the actual number of hours (or fraction thereof) ordered by the Contracting Officer and performed by the contractor.
8. Linear Foot (LF): Measurement of work along its length from point-to-point; parallel to the base or foundation. Do not measure overlaps.
9. Lump Sum (LS): One complete unit.
10. Mile: Measured horizontally along the centerline of each roadway, approach, or ramp.
11. Pound (LB): For sacked or packaged material, measurement will be the net weight as packed by the manufacturer.
12. Square Foot (SF): Measured on a plane parallel to the surface being measured.
13. Square Yard (SY): Measured on a plane parallel to the surface being measured.
14. Ton: Measured as a short ton consisting of 2,000 pounds.
2.4 METHOD OF MEASUREMENT
A. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:
1. ACTUAL QUANTITIES (AQ) - These quantities are determined from actual measurements of completed work.
2. DESIGNED QUANTITIES (DQ) - These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units shown in the Schedule of Items may be authorized under any of the following conditions:
a. As a result of changes in the work authorized by the CO.
b. As a result of the CO determining that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.
c. As a result of the Contractor submitting to the CO a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.
3. LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.
4. STAKED QUANTITIES (SQ) - These quantities are determined from staked measurements prior to construction.
5. VEHICLE QUANTITIES (VQ) - These quantities are measured or weighed in hauling vehicles.
PART 3 - PRODUCTS (NOT APPLICABLE)
PART 4 - EXECUTION (NOT APPLICABLE)
REVISION HISTORY:
PRIMARY AUTHOR: ???
5/11/2006 D. WEWER – Added 50# Bags to list of units.
END OF SECTION 011250
MAY 2006
USDA FOREST SERVICE, R-4
FALLS CAMPGROUND WATER SYSTEM
SECTION 011900 - MOBILIZATION
PART 5 - GENERAL
5.1 SUMMARY
A. This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.
B. The measurement shall be lump sum for mobilization.
C. Payment:
1. Bond premiums will be reimbursed after receipt of the evidence of payment.
2. 50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums.
3. Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums.
4. Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.
5. Progress payments for mobilization and preparatory work shall be subject to retainage.
PART 6 - PRODUCTS (NOT USED)
PART 7 - EXECUTION (NOT USED)
END OF SECTION 011900
July 2005
USDA FOREST SERVICE, R-4
FALLS CAMPGROUND WATER SYSTEM
SECTION 013300 - SUBMITTAL PROCEDURES
PART 8 - GENERAL
8.1 SUMMARY
A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. See Table 013300-1 for a summary of required submittals.
B. See other specification section within this package for additional requirements on submittal.
8.2 SUBMITTAL PROCEDURES
A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
1. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.
a. The Contracting Officer (CO) reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
B. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.
1. Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.
2. If intermediate submittal is necessary, process it in same manner as initial submittal.
3. Allow 14 days for processing each re-submittal.
4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.
C. Identification: Place a permanent label or title block on each submittal for identification.
1. Indicate name of firm or entity that prepared each submittal on label or title block.
2. Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO.
3. Include the following information on label for processing and recording action taken:
a. Project name.
b. Date.
c. Name and address of Contractor.
d. Name of manufacturer.
e. Unique identifier, including revision number.
f. Number and title of appropriate Specification Section.
g. Drawing number and detail references, as appropriate.
h. If more than one item is shown on submittal sheet, identify item.
D. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.
E. Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.
F. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.
8.3 MEASUREMENT AND PAYMENT
A. No separate measurement and/or payment will be made for this section. Payment shall be included with work shown in the schedule of items.
PART 9 - PRODUCTS
9.1 ACTION SUBMITTALS – (Submittals requiring CO approval)
A. General: Prepare and submit Action Submittals required by individual Specification Sections.
1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document.
B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.
2. Mark each copy of each submittal to show which products and options are applicable.
3. Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
c. Manufacturer's installation instructions.
d. Manufacturer's catalog cuts.
e. Wiring diagrams showing factory-installed wiring.
f. Compliance with recognized trade association standards.
g. Compliance with recognized testing agency standards.
C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.
1. Preparation: Include the following information, as applicable:
a. Dimensions.
b. Identification of products.
c. Fabrication and installation drawings.
d. Roughing-in and setting diagrams.
e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.
f. Notation of dimensions established by field measurement.
2. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.
D. Contractor's Construction Schedule: The contractor shall submit a Construction Schedule, for approval by CO, in accordance with the contract provisions within 5 day of commencement of work.
E. Samples: Prepare physical units of materials or products, including the following:
1. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.
9.2 INFORMATIONAL SUBMITTALS – (Submittals NOT requiring CO approval)
A. General: Prepare and submit Informational Submittals required by other Specification Sections.
1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will not return copies.
2. Certificates and Certifications: Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.
3. Test and Inspection Reports: Comply with requirements in Section 014100 "Quality Control."
B. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.
C. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.
D. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment.
E. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.
PART 10 - EXECUTION
10.1 GENERAL
A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.
B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.
C. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.
D. Submittals not required by the Contract Documents will not be reviewed and may be discarded.
E. Substitutions – Whenever materials, products, and equipment are listed by name or brand in the specifications and/or on the drawings, it is used as a measure of quality, utility, or standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance and utility to that specified, he shall request substitution as provided below, not less than 30 days before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution.
F. Requests for substitutions will only be considered if contractor submits the following:
1. Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution. Submit additional information if required by Contracting Officer. All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.
2. Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.
3. A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws.
4. The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.
EDIT table below for each project. COORDINATE table references with edited specification sections.
10.2 SUBMITTAL SCHEDULE – Submittals shall be made as required by and called for in the drawings and specifications. The following table is a summary of the required submittals for the project - the table is to assist the Contractor and may not be all inclusive – additional submittals may be required by specific specifications:
TABLE 013000-1
| Spec. Section |
| Section Title |
| Subsection |
| Required Submittal |
| 014100 |
| Quality Control |
| 1.3A |
| Contractor quality control plan |
| 014100 |
| Quality Control |
| 1.3B |
| Permits, Licenses, and Certificates |
| 014100 |
| Quality Control |
| 1.3C |
| Test and inspection reports |
| 014100 |
| Quality Control |
| 1.3D |
| As-Built drawings |
| 033000 |
| Cast-In-Place Concrete |
| 1.3A |
| Product Data |
| 033000 |
| Cast-In-Place Concrete |
| 1.3B |
| Design Mixture |
| 033000 |
| Cast-In-Place Concrete |
| 1.3C |
| Shop Drawings |
| 033000 |
| Cast-In-Place Concrete |
| 1.3D |
| Test Reports |
| 033000 |
| Cast-In-Place Concrete |
| 1.3E |
| Joint Layout |
| 042200 |
| Concrete Unit Masonry |
| 1.2A |
| Product Data |
| 042200 |
| Concrete Unit Masonry |
| 1.2B |
| Samples |
| 042200 |
| Concrete Unit Masonry |
| 1.2C |
| Material Certificates |
| 042200 |
| Concrete Unit Masonry |
| 1.2D |
| Mix Design |
| 061753 |
| Shop-Fabricated Wood Trusses |
| 1.4A |
| Shop Drawings |
| 061753 |
| Shop-Fabricated Wood Trusses |
| 1.4B |
| Product Certificates |
| 061753 |
| Shop-Fabricated Wood Trusses |
| 1.4C |
| Qualifications Data |
| 061753 |
| Shop-Fabricated Wood Trusses |
| 1.4D |
| Materials Certificates |
| 074113 |
| Metal Panel Roofing |
| 1.4A |
| Product Data |
| 074113 |
| Metal Panel Roofing |
| 1.4B |
| Samples |
| 074113 |
| Metal Panel Roofing |
| 1.4C |
| Maintenance Data |
| 074113 |
| Metal Panel Roofing |
| 1.4D |
| Warranties |
| 074600 |
| Soffit & Fascia |
| 1.2A |
| Product Data |
| 081113 |
| Hollow Metal Doors and Frames |
| 1.2A |
| Product Data |
| 081113 |
| Hollow Metal Doors and Frames |
| 1.2B |
| Shop Drawings |
| 081113 |
| Hollow Metal Doors and Frames |
| 1.2C |
| Schedule |
| 087100 |
| Door Hardware |
| 1.2A |
| Product Data |
| 087100 |
| Door Hardware |
| 1.2B |
| Warranty |
| 099000 |
| Painting |
| 1.2A |
| Product Data |
| 099000 |
| Painting |
| 1.2B |
| Samples |
| 133402 |
| Utility Boxes |
| 1.3A |
| Product Data |
| 133402 |
| Utility Boxes |
| 1.3B |
| Product Certificates |
| 221100 |
| Water Distribution Systems |
| 1.3A |
| Product Data |
| 221100 |
| Water Distribution Systems |
| 1.3B |
| Water Disposal Plan |
| 221103 |
| Plumbing Appurtenances |
| 1.2A |
| Product Data |
| 221103 |
| Plumbing Appurtenances |
| 1.2B |
| Operation and Maintenance Data |
| 221105 |
| Water Hydrants |
| 1.3A |
| Manufacturer’s Literature and Maintenance Data |
| 221105 |
| Water Hydrants |
| 1.3B |
| Washed Rock Certification |
| 221105 |
| Water Hydrants |
| 1.3C |
| Maintenance Data |
| 221120 |
| Submersible Well Pumps |
| 1.2A |
| Product Data |
| 221200 |
| Underground Water Storage Tank |
| 1.3A |
| Product Data and Shop Drawings |
| 221200 |
| Underground Water Storage Tank |
| 1.3B |
| Product Certificate |
| 221200 |
| Underground Water Storage Tank |
| 1.3C |
| Operation and Maintenance Data |
| 260500 |
| Common Work Results for Electrical |
| 1.2A |
| Product Data |
| 312000 |
| Earthwork |
| 1.3A |
| Sieve Analysis |
| 312000 |
| Earthwork |
| 1.3B |
| Product Data |
| 312225 |
| Excavation and Embankment |
| 1.3A |
| Material Properties |
| 312225 |
| Excavation and Embankment |
| 1.3B |
| Density Test Results |
| 321204 |
| Crushed Aggregate Base or Surface Course |
| 1.3A |
| Material Properties |
| 321204 |
| Crushed Aggregate Base or Surface Course |
| 1.3B |
| Density Test Results |
| 322717 |
| Stock Gate |
| 1.3A |
| Product Data |
| 322717 |
| Stock Gate |
| 1.3B |
| Manufacturer’s Instructions |
| 329206 |
| Seeding |
| 2.1A |
| Seed Certifications |
| 332100 |
| Water Supply Wells |
| 1.4A |
| Product Data |
| 332100 |
| Water Supply Wells |
| 1.4B |
| Project Record Documents |
| 332100 |
| Water Supply Wells |
| 1.4C |
| Field Quality-Control Reports |
| 332100 |
| Water Supply Wells |
| 1.4D |
| Operation and Maintenance Data |
| 332100 |
| Water Supply Wells |
| 1.4E |
| Water Disposal Plan |
END OF SECTION 013300
JUNE 2009
USDA FOREST SERVICE, R-4
FALLS CAMPGROUND WATER SYSTEM
SECTION 014100 - QUALITY CONTROL
PART 11 - GENERAL
11.1 This work shall consist of providing quality control in conformance with the inspection, testing, and product certification requirements of this contract to ensure compliance with the drawings and specifications. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of the contract.
11.2 QUALITY CONTROL
A. The Contractor shall provide and maintain a quality control system that will ensure all services, supplies, and construction work required under this contract conforms to the contract requirements. The Contractor shall perform, or cause to be performed, the sampling, inspection, and testing required to substantiate that all services, supplies, and construction conform to the contract requirements.
B. Special Tests and Inspections: Contractor will engage a testing agency to conduct required special tests and inspections. The Contractor shall authorize the testing agency to perform the required testing and inspections on the work completed. The authority shall include:
1. Testing agency will interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from the Contract Documents.
2. Testing agency will re-test and re-inspect corrected work.
C. Retesting/Reinspecting: Contractor shall provide quality-control services for retesting and reinspection for replaced construction work or for work that failed to comply with the requirements under the contract.
11.3 SUBMITTALS
A. Contractor Quality Control Plan
B. Permits, Licenses, and Certificates
C. Test and Inspection Reports
D. As-Built Drawings
11.4 MEASUREMENT AND PAYMENT
A. No separate payment will be made for the work included under this section; rather payment shall be considered to be included in the items of work listed in the Schedule of Items.
PART 12 - PRODUCTS (Not Applicable)
PART 13 - EXECUTION
13.1 QUALITY CONTROL SYSTEM
A. General: Perform required testing, inspections, sampling, and similar services per direction specified in the contract drawings and specifications and in accordance with established industry standards.
13.2 CONTRACTOR QUALITY CONTROL PLAN
A. At the time of the preconstruction conference, the Contractor shall submit for approval a written Contractor Quality Control Plan.
1. If the plan requires any revisions or corrections, the Contractor shall resubmit the plan within 10 days.
2. The Government reserves the right to require changes in the plan during the contract period as necessary.
3. No change in the approved plan may be made without written concurrence by the Contracting Officer.
4. At a minimum, the plan shall include the following:
a. A list of personnel responsible for quality control and assigned duties. Include each person's qualifications.
b. A copy of a letter of direction to the Contractor's Quality Control Supervisor outlining assigned duties.
c. Names, qualifications, and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms.
d. Methods of performing, documenting, and enforcing quality control of all work.
e. Methods of monitoring and controlling environmental pollution and contamination as required by all applicable regulations and laws.
13.3 TEST AND INSPECTION REPORTS
A. Submit three copies of complete test results no later than three calendar days after the test was performed.
B. Submit failing test results and proposed remedial actions within four hours of noted deficiency.
C. Testing and Inspection Reports shall include the following:
SPEC WRITER: REVISE LIST BELOW TO SUIT PROJECT.
1. Date of issue.
2. Project title and number.
3. Name, address, and telephone number of testing agency.
4. Dates and locations of samples, tests, or inspections.
5. Names of individuals performing tests and inspections.
6. Reference Specification Section(s).
7. Complete test or inspection data.
8. Test and inspection results and an interpretation of test results.
9. Ambient conditions at time sample was taken, tested, or inspected.
10. Comments or professional opinion on whether tested or inspected work complies with the Contract Document requirements.
11. Name and signature of laboratory inspector.
12. Recommendations on retesting and reinspecting.
13.4 PERMITS, LICENSES, AND CERTIFICATES
A. For Contracting Officer’s records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations relevant to the on performance of the work.
13.5 AS-BUILT DRAWINGS
A. The Contractor shall maintain a set of the contract drawings depicting as-built conditions. These drawings shall be maintained in a current condition and shall be available for review. All variations from the original contract drawings shall be indicated in red on the drawings. Upon completion of the contract work, as-built drawings shall be submitted to the Contracting Officer.
13.6 SAMPLING, TESTING, AND CERTIFICATION REQUIREMENTS
EDIT table below for each project. COORDINATE table references with edited specification sections.
A. Sampling, testing, and Certification requirements and frequency for specific items shall be as specified in the drawings and specification. The following table is a summary of the required sampling, testing, and certification for the project - the table is to assist the Contractor, but may not be all inclusive – additional submittals may be required by specific specification section:
TABLE 014100-1
| Item |
| Subsection |
| Certification or Test Required |
| Frequency |
| 033000 |
| 2.12 |
| Mixing and Delivery |
| Each Truck |
| 033000 |
| 3.11 |
| Concrete – three cylinders, slump, air, temperature |
| 1 composite per truck load delivered |
| 042200 |
| 3.7A |
| Concrete Masonry Unit Test |
| 1 per type |
| 042200 |
| 3.7B |
| Mortar Aggregate Ratio Test |
| 1 per mix |
| 042200 |
| 3.7C |
| Grout Test |
| 1 per mix |
| 221100 |
| 3.2N |
| HDPE Pipe - Bent Strap Test |
| Once Daily |
| 221100 |
| 3.7A |
| Hydrostatic Testing of Water System |
| See Spec. |
| 221100 |
| 3.7B |
| Pressure and Leakage Test – Water Line |
| See Spec. |
| 221100 |
| 3.8 |
| Bacteriological Examination |
| After disinfection, before use |
| 221120 |
| 3.4 |
| Mechanical and Electrical Testing (Pump System) |
| See Spec. |
| 221200 |
| 3.12 |
| Leak Test |
| Until Passing |
| 221200 |
| 3.12 |
| Air Test |
| See Spec. |
| 221200 |
| 3.12 |
| Pressure Test |
| Until Passing |
| 260500 |
| 1.4C |
| Electrical Testing |
| See Spec. |
| 269999 |
| 3.1 |
| Storage Tank Water Level Controls |
| See Spec. |
| 312000 |
| 3.13C |
| Compaction Test – at Pipe Zone |
| One per 600 Feet of Trench |
| 312000 |
| 3.13D |
| Compaction Test – above Pipe Zone |
| One per 600 Feet of Trench |
| 312000 |
| 3.13I |
| Tracer Wire Conductivity Test |
| Until Passing |
| 312000 |
| 3.16A |
| Compaction Test – Backfill/Fills |
| One per Tank or Utility Box |
| 312000 |
| 3.18B |
| Compaction Test - Subsurface Drainage Material |
| One per Tank |
| 312000 |
| 3.18C |
| Compaction Test – Drainage Backfill |
| One per Tank |
| 312000 |
| 3.20D |
| Compaction Test – Backfill/Fills under Buildings |
| One test every 600 S.F. area per lift, minimum of one test per building |
| 312225 |
| 3.12B |
| Moisture-Density Relationship |
| One Test for Each Soil Type Encountered |
| 312225 |
| 3.12B |
| Compaction – Road Embankment (method 4) |
| One test every 750 sq. yd. of embankment per lift |
| 312225 |
| 3.12B |
| Compaction – Subgrade |
| One test every 1000 sq. yd. of subgrade |
| 321204 |
| 3.4 |
| Compaction Tests – Aggregate |
| One test for every 150 sq. yd. of aggregate |
| 321204 |
| 3.4 |
| Compaction Tests – Road Base |
| One test for every 150 sq. yd. of aggregate |
| 332100 |
| 3.5 |
| Performance Tests (Multiple) |
| See Spec. |
| 332100 |
| 3.7 |
| Water Analysis Test |
| See Spec. |
END OF SECTION 014100
JUNE 2009
USDA FOREST SERVICE, R-4
FALLS CAMPGROUND WATER SYSTEM
SECTION 024100 - WASTE MATERIAL DISPOSAL
PART 14 - GENERAL
14.1 SUMMARY
A. This Section includes the loading, handling, hauling, and placing of excess excavation material, unsuitable excavation material, clearing and grubbing debris, and construction debris.
14.2 MEASUREMENT AND PAYMENT
A. There will be no separate measurement or payment for work in this Section. Waste material disposal is considered incidental to other items of work shown in the Schedule of Items.
PART 15 - PRODUCTS – NOT APPLICABLE
PART 16 - EXECUTION
16.1 Waste material to be removed:
A. All excavated material not used in the construction of embankments or backfilling of trenches, or other excess material resulting from the excavation and embankment operation shall be hauled to a disposal area.
B. All unsuitable excavated material, oversize boulders, stumps, and other clearing and grubbing debris shall be hauled to a disposal area.
C. All demolition materials, garbage, and other refuse generated shall be hauled to a disposal area.
16.2 Disposal Site:
A. All waste material shall be removed from the project site and legally disposed off of Government property in an approved landfill.
1. The contractor is responsible for all costs and permits associated with landfill disposal.
2. The Government is not responsible for waste material upon its departure from the project site.
REVISION HISTORY:
Adapted for R4 during the Water/Wastewater spec-writing session in January, 2004. Primary author: Ronald Lange.
REPLACES: R4 CSI Section 02135 (Landfill and Forest disposal).
12/2004: REVIEWED AND EDITED BY D. WEWER
3/20/2006: D. Wewer - Updated Section to new numbering system.
END OF SECTION 024100
MARCH 2008
USDA FOREST SERVICE, R-4
FALLS CAMPGROUND WATER SYSTEM
SECTION 024102 - REMOVAL AND DISPOSAL OF STRUCTURES AND OBSTRUCTIONS
PART 17 - GENERAL
17.1 SUMMARY
A. Includes removal disposal, and backfilling of existing tanks, hydrants, valves and utilities to the extent shown on the drawings.
B. Related Sections Include the Following:
1. Section 024100 “Waste Material Disposal.”
2. Section 329206 “Seeding.”
Choose one below:
C. MEASUREMENT AND PAYMENT
1. There will be no separate measurement or payment for this item.
2. Payment will be lump sum for removal of septic tanks and other utilities shown on the Drawings.
PART 18 - PRODUCTS – not applicable
PART 19 - EXECUTION
19.1 GENERAL
A. Topsoil stripping and storage, if required, shall comply with the applicable specification.
B. The Contractor may use any means he may elect to remove the structure or items shown on the drawings to be removed, as long as he provides for the safety of the public and preservation of the surrounding site and structures. All of a substructure shall be demolished to a depth of 1 foot below the present ground level. All wood, concrete, and metal materials to be removed shall be broken into sufficiently small pieces to enable handling and disposal. All other structures shall be backfilled and the surrounding ground restored to as near normal conditions as practicable in accordance with these specifications.
C. Backfill for removed items may be excess material from other excavation or borrow from an approved source.
1. Backfill shall be brought up in 12-inch compacted layers.
2. Compaction shall be by mechanical tampers, with at least three passes over the entire surface.
3. Maximum size of rock in backfill shall be 8 inches.
4. Backfill shall be compacted and rounded 6 inches above the natural ground.
remove 2 paragraphs below if not in roadway or parking area:
5. If the backfill is in an existing unsurfaced roadway or parking area, backfill shall be as specified above, except backfill shall be graded to blend with the natural ground and each layer compacted to 85 percent of the optimum dry density determined by AASHTO T-99, Method C.
6. In areas where backfill is in graveled surface or paved surface roadways, backfill shall be as specified above, except it shall be terminated at the grade shown on the drawings and each layer compacted to 85 percent of the optimum dry density determined by AASHTO T-99, Method C. Completion of backfill shall be in accordance with the applicable surfacing specifications.
7. When topsoil replacement is required, backfill and compaction shall be as specified above, except the backfill shall terminate 6 inches below the natural ground. Placement of topsoil, when required, shall comply with the applicable specification.
D. Excessive settlement or other evidence of improper backfill shall be corrected by reopening the excavation to the depth required for proper refilling and compaction.
19.2 DISPOSAL
A. Disposal of debris shall comply with Section 024100 “Waste Material Disposal.”
19.3 SEEDING
A. Seeding shall comply with Section 329206 “Seeding.”
REVISION HISTORY:
Primary Author: Ronald Lange. Written during the water/wastewater spec-writing session in January, 2004.
REPLACES: CSI Section 02119
12/2004: REVIEWED AND EDITED BY D. WEWER
4/26/05 D. WEWER – CHANGED “DIVISION XX” DESIGNATION TO SECTION “XXXXX.” ALSO REMOVED REFERENCE TO “SITE CLEARING” SPEC SINCE IT WAS REPLACED BY 02230 “CLEARING AND GRUBBING.”
3/20/2006: D. Wewer - Updated Section to new numbering system.
END OF SECTION 024102
MAY 2009
USDA FOREST SERVICE, R-4
FALLS CAMPGROUND WATER SYSTEM
SECTION 033000 - CAST-IN-PLACE CONCRETE
PART 20 - GENERAL
20.1 SUMMARY
A. This Section specifies cast-in place concrete, including formwork, reinforcement, concrete materials, mixture design, placement procedures, and finishes.
20.2 DEFINITIONS
A. Cementitious Materials: Portland cement alone or in combination with one or more of the following: blended hydraulic cement, fly ash and other pozzolans, ground granulated blast-furnace slag, and silica fume; subject to compliance with requirements.
20.3 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Design Mixtures: For each concrete mixture. Indicate amounts of mixing water to be withheld for later addition at Project site.
C. Steel Reinforcement Shop Drawings when project design requires special consideration.
D. Field quality-control test reports.
E. Contraction and Expansion Joint Layout.
20.4 MEASUREMENT AND PAYMENT
A. There will be no separate measurement or payment for work in this section. Payment will be included at the contract unit price for items shown on the Schedule of Items.
PART 21 - PRODUCTS
21.1 FORM-FACING MATERIALS
A. Smooth-Formed Finished Concrete: Form-facing panels that will provide continuous, true, and smooth concrete surfaces. Furnish in largest practicable sizes to minimize number of joints.
1. Plywood, metal, or other approved panel materials.
2. Exterior-grade plywood panels, suitable for concrete forms, complying with DOC PS 1, and as follows:
a. Structural 1, B-B or better; mill oiled and edge sealed.
b. B-B (Concrete Form), Class 1 or better; mill oiled and edge sealed.
B. Rough-Formed Finished Concrete: Plywood, lumber, metal, or another approved material. Provide lumber dressed on at least two edges and one side for tight fit.
C. Forms for Cylindrical Columns, Pedestals, and Supports: Metal, glass-fiber-reinforced plastic, paper, or fiber tubes that will produce surfaces with gradual or abrupt irregularities not exceeding specified formwork surface class. Provide units with sufficient wall thickness to resist plastic concrete loads without detrimental deformation.
D. Form-Release Agent: Commercially formulated form-release agent that will not bond with, stain, or adversely affect concrete surfaces and will not impair subsequent treatments of concrete surfaces.
E. Form Ties: Factory-fabricated, removable or snap-off metal or glass-fiber-reinforced plastic form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spalling of concrete on removal.
21.2 STEEL REINFORCEMENT
A. Reinforcing Bars: ASTM A 615/A 615M, Grade 60, deformed.
B. Plain-Steel Wire: ASTM A 82, as drawn.
C. Deformed-Steel Wire: ASTM A 496.
21.3 REINFORCEMENT ACCESSORIES
A. Joint Dowel Bars: ASTM A 615/A 615M, Grade 60, plain-steel bars, cut bars true to length with ends square and free of burrs.
B. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded wire reinforcement in place. Manufacture bar supports from steel wire, plastic, or precast concrete according to CRSI's "Manual of Standard Practice," of greater compressive strength than concrete and as follows:
1. For concrete surfaces exposed to view where legs of wire bar supports contact forms, use CRSI Class 1 plastic-protected steel wire or CRSI Class 2 stainless-steel bar supports.
21.4 CONCRETE MATERIALS
A. Cementitious Material: Use the following cementitious materials, of the same type, brand, and source, throughout Project:
1. Portland Cement: ASTM C 150, Type II.
B. Normal-Weight Aggregates: ASTM C 33, graded, from a single source.
1. Maximum Coarse-Aggregate Size: 1 inch nominal.
2. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.
C. Water: ASTM C 94/C 94M and potable.
D. Fly ash, ground iron blast-furnace slag, or silica fume may partially replace cement in any mix as follows:
1. Fly Ash:
a. Class F – Not more than 20 percent of the minimum mass of portland cement may be replaced with class F fly ash.
b. Class C – Not more than 25 percent of the minimum mass of portland cement may be replaced with class C fly ash.
2. Ground Iron Blast-Furnace Slag: Not more than 25 percent of the minimum mass of portland cement may be replaced with ground iron blast-furnace slag.
3. Silica Fume (microsilica): Not more than 10 percent of the minimum mass of portland cement may be replaced with silica fume.
4. Additionally, fly ash, slag, and silica fume will constitute no more than 50 percent of the total replacement weight.
21.5 ADMIXTURES
A. Air-Entraining Admixture: ASTM C 260.
B. Chemical Admixtures: Provide admixtures certified by manufacturer to be compatible with other admixtures and that will not contribute water-soluble chloride ions exceeding those permitted in hardened concrete. Do not use calcium chloride or admixtures containing calcium chloride.
1. Retarding Admixture: ASTM C 494/C 494M, Type B.
C. Synthetic Fiber: Monofilament or fibrillated polypropylene fibers engineered and designed for use in concrete pavement, complying with ASTM C 1116, Type III, 1/2 to 1-1/2 inches long.
21.6 CURING MATERIALS
A. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. when dry.
B. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet.
C. Water: Potable.
D. Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class B, dissipating or nondissipating. Liquid Membrane-Forming Compounds. Material shall be certified by curing compound manufacturer to not interfere with bonding of floor covering.
21.7 RELATED MATERIALS
A. Expansion- and Isolation-Joint-Filler Strips: ASTM D 1751, asphalt-saturated cellulosic fiber or ASTM D 1752, cork or self-expanding cork.
B. Semirigid Joint Filler: Two-component, semirigid, 100 percent solids, epoxy resin with a Type A shore durometer hardness of 80 per ASTM D 2240.
C. Bonding Agent: ASTM C 1059, Type II, non-redispersible, acrylic emulsion or styrene butadiene.
21.8 REPAIR MATERIALS
A. Repair Underlayment: Cement-based, polymer-modified, self-leveling product that can be applied in thicknesses from 1/8 inch and that can be feathered at edges to match adjacent floor elevations.
1. Cement Binder: ASTM C 150, portland cement or hydraulic or blended hydraulic cement as defined in ASTM C 219.
2. Primer: Product of underlayment manufacturer recommended for substrate, conditions, and application.
3. Aggregate: Well-graded, washed gravel, 1/8 to 1/4 inch or coarse sand as recommended by underlayment manufacturer.
4. Compressive Strength: Not less than 4100 psi at 28 days when tested according to ASTM C 109/C 109M.
B. Repair Overlayment: Cement-based, polymer-modified, self-leveling product that can be applied in thicknesses from 1/8 inch and that can be feathered at edges to match adjacent floor elevations.
1. Cement Binder: ASTM C 150, portland cement or hydraulic or blended hydraulic cement as defined in ASTM C 219.
2. Primer: Product of topping manufacturer recommended for substrate, conditions, and application.
3. Aggregate: Well-graded, washed gravel, 1/8 to 1/4 inch or coarse sand as recommended by topping manufacturer.
4. Compressive Strength: Not less than 5000 psi at 28 days when tested according to ASTM C 109/C 109M.
21.9 CONCRETE MIXTURES, GENERAL
A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, according to ACI 301.
1. Use a qualified independent testing agency for preparing and reporting proposed mixture designs based on laboratory trial mixtures.
B. Limit water-soluble, chloride-ion content in hardened concrete to 0.06 percent by weight of cement.
C. Admixtures: Use admixtures according to manufacturer's written instructions.
21.10 CONCRETE MIXTURES FOR BUILDING ELEMENTS
A. Footings: Proportion normal-weight concrete mixture as follows:
1. Minimum Compressive Strength: 3500 psi at 28 days.
2. Maximum Water-Cementitious Materials Ratio: 0.50.
3. Slump Limit: 4 plus or minus 1 inch.
4. Air Content: 4 percent, plus or minus 1 percent at point of delivery for 1-inch nominal maximum aggregate size.
B. Slabs-on-Grade: Proportion normal-weight concrete mixture as follows:
1. Minimum Compressive Strength: 3500 psi at 28 days.
2. Minimum Cementitious Materials Content: 540 lb/cu. yd.
3. Slump Limit: 4 inches, plus or minus 1 inch.
4. Air Content: 5 percent, plus or minus 1 percent at point of delivery for 1-inch nominal maximum aggregate size.
5. Synthetic Fiber: Uniformly disperse in concrete mixture at manufacturer's recommended rate, but not less than 1.5 lb/cu. yd.
21.11 FABRICATING REINFORCEMENT
A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."
21.12 CONCRETE MIXING
A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to ASTM C 94/C 94M and ASTM C 1116, and furnish batch ticket information.
1. When air temperature is between 85 and 90 deg F, reduce mixing and delivery time from 1-1/2 hours to 75 minutes; when air temperature is above 90 deg F, reduce mixing and delivery time to 60 minutes.
B.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .