About this opportunity

This solicitation seeks design-build services for office space alterations on the 20th floor of the Social Security Administration building located in Atlanta, Georgia. The General Services Administration Southeast Sunbelt Region 4 is procuring design and construction services including demolition and installation of new partitions, office renovations, conference/meeting rooms, break rooms, and associated areas along with finishes, electrical, HVAC, sprinkler and fire alarm modifications. Proposals will be evaluated based on experience with similar projects, past performance, and key personnel, with price being the determining factor for selection among technically acceptable offers. Proposals are due by April 20, 2021.

The contract is set aside for HUBZone small businesses. The work involves NAICS codes 237910 for design services and 236220 for general commercial and institutional building construction. The place of performance is 100 Alabama Street in Atlanta. The selected contractor will be responsible for design services to be completed within 30 days followed by construction services to be finished within 150 days of award. The budget for the project is unspecified.

Notice text

3 versions

Update #3 · Latest ·

4-19-2021

The Correct Due Date for this Solicitation is 4-26-2021.  As the project documents state until 4/26/2021 and not 4/20/2021.  This will allow for all potential proposals to be submitted at the same time without conflict.

RFI Questions & Answers uploaded in attachments/Links 21 04 05

*

The General Services Administration (GSA) Southeast Sunbelt Region 4 announces the opportunity for a Design Build General Construction Alterations for the Social Security Administration 20th Floor at the Sam Nunn AFC located at 100 Alabama Street, Atlanta, Georgia.

The Design/Build on the 20th Floor at the Sam Nunn AFC. Objectives will be accomplished by a HUBZone, small business concerns who is capable of making the upgrades as detailed in the Scope of Work. The project includes space alterations, consisting of demolition and installation of; new partitions, renovation of offices, conference/meeting rooms, break rooms, DCR rooms, and associated areas. Work shall include new finishes, electrical modifications supplemental HVAC, and sprinkler and fire alarm systems modifications as needed. This project will follow a design build method using a design build contractor (DB Contractor or Contractor) who shall carry sole responsibility for the fulfillment of the terms and conditions of the entire design build contract. The Design/Build Contractor will be responsible for all Architect-Engineer services and construction services. This project is to provide design and construction services for the Social Security Administration. The work includes design services (Full set of construction documents) and construction services for office space on the 20th Floor. The project shall consist of two phases, Design and Construction.

Phase I – 1-30- Design Phase

Phase II – 31-150- Construction

The factors below in descending order of importance will be used to evaluate all proposals. All information requested is required. Failure to provide any information requested by the Factors will result in an unsuccessful proposal submission. The contractor will provide information on “similar” projects. “Similar” is defined as projects comparable in terms of scope, magnitude, and complexity. The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conformed to the solicitation and will be most advantageous to the Government in accordance with Lowest Price Technically Acceptable (FAR15.101-2). Price is a factor in selecting and awarding the contract to a responsible contractor who exhibited and demonstrated performance with other similar requirements of same or equal dollar value of this award.

The Technical Factors:

 Factor 1- Experience on Similar Projects

 Factor 2- Past Performance of Offeror

 Factor 3- Key Personnel

Evaluation Process:

The evaluation process will be conducted by the CO and the technical evaluation board in accordance with Lowest Price Technically Acceptable Evaluation Process.  As outline in the solicitation this procurement The Government intends to award a contract resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value from the selection of the technically acceptable proposal with the lowest evaluated price Evaluation Procedures: Proposals shall be evaluated as set forth in the RFP. Upon receipt of proposals the CO will rank proposals in order of price from lowest total evaluated price to highest total evaluated price. The Technical Evaluation Board will then evaluate the technical acceptability of the lowest priced proposal based on the technical factors and the evaluation standards outlined in the solicitation.  If the lowest priced proposal is determined to be technically acceptable the source selection process will be complete, and an award will be recommended.

Update #2 ·

RFI Questions & Answers uploaded in attachments/Links 21 04 05

*

The General Services Administration (GSA) Southeast Sunbelt Region 4 announces the opportunity for a Design Build General Construction Alterations for the Social Security Administration 20th Floor at the Sam Nunn AFC located at 100 Alabama Street, Atlanta, Georgia.

The Design/Build on the 20th Floor at the Sam Nunn AFC. Objectives will be accomplished by a HUBZone, small business concerns who is capable of making the upgrades as detailed in the Scope of Work. The project includes space alterations, consisting of demolition and installation of; new partitions, renovation of offices, conference/meeting rooms, break rooms, DCR rooms, and associated areas. Work shall include new finishes, electrical modifications supplemental HVAC, and sprinkler and fire alarm systems modifications as needed. This project will follow a design build method using a design build contractor (DB Contractor or Contractor) who shall carry sole responsibility for the fulfillment of the terms and conditions of the entire design build contract. The Design/Build Contractor will be responsible for all Architect-Engineer services and construction services. This project is to provide design and construction services for the Social Security Administration. The work includes design services (Full set of construction documents) and construction services for office space on the 20th Floor. The project shall consist of two phases, Design and Construction.

Phase I – 1-30- Design Phase

Phase II – 31-150- Construction

The factors below in descending order of importance will be used to evaluate all proposals. All information requested is required. Failure to provide any information requested by the Factors will result in an unsuccessful proposal submission. The contractor will provide information on “similar” projects. “Similar” is defined as projects comparable in terms of scope, magnitude, and complexity. The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conformed to the solicitation and will be most advantageous to the Government in accordance with Lowest Price Technically Acceptable (FAR15.101-2). Price is a factor in selecting and awarding the contract to a responsible contractor who exhibited and demonstrated performance with other similar requirements of same or equal dollar value of this award.

The Technical Factors:

 Factor 1- Experience on Similar Projects

 Factor 2- Past Performance of Offeror

 Factor 3- Key Personnel

Evaluation Process:

The evaluation process will be conducted by the CO and the technical evaluation board in accordance with Lowest Price Technically Acceptable Evaluation Process.  As outline in the solicitation this procurement The Government intends to award a contract resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value from the selection of the technically acceptable proposal with the lowest evaluated price Evaluation Procedures: Proposals shall be evaluated as set forth in the RFP. Upon receipt of proposals the CO will rank proposals in order of price from lowest total evaluated price to highest total evaluated price. The Technical Evaluation Board will then evaluate the technical acceptability of the lowest priced proposal based on the technical factors and the evaluation standards outlined in the solicitation.  If the lowest priced proposal is determined to be technically acceptable the source selection process will be complete, and an award will be recommended.

Update #1 ·

The General Services Administration (GSA) Southeast Sunbelt Region 4 announces the opportunity for a Design Build General Construction Alterations for the Social Security Administration 20th Floor at the Sam Nunn AFC located at 100 Alabama Street, Atlanta, Georgia.

The Design/Build on the 20th Floor at the Sam Nunn AFC. Objectives will be accomplished by a HUBZone, small business concerns who is capable of making the upgrades as detailed in the Scope of Work. The project includes space alterations, consisting of demolition and installation of; new partitions, renovation of offices, conference/meeting rooms, break rooms, DCR rooms, and associated areas. Work shall include new finishes, electrical modifications supplemental HVAC, and sprinkler and fire alarm systems modifications as needed. This project will follow a design build method using a design build contractor (DB Contractor or Contractor) who shall carry sole responsibility for the fulfillment of the terms and conditions of the entire design build contract. The Design/Build Contractor will be responsible for all Architect-Engineer services and construction services. This project is to provide design and construction services for the Social Security Administration. The work includes design services (Full set of construction documents) and construction services for office space on the 20th Floor. The project shall consist of two phases, Design and Construction.

Phase I – 1-30- Design Phase

Phase II – 31-150- Construction

The factors below in descending order of importance will be used to evaluate all proposals. All information requested is required. Failure to provide any information requested by the Factors will result in an unsuccessful proposal submission. The contractor will provide information on “similar” projects. “Similar” is defined as projects comparable in terms of scope, magnitude, and complexity. The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conformed to the solicitation and will be most advantageous to the Government in accordance with Lowest Price Technically Acceptable (FAR15.101-2). Price is a factor in selecting and awarding the contract to a responsible contractor who exhibited and demonstrated performance with other similar requirements of same or equal dollar value of this award.

The Technical Factors:

 Factor 1- Experience on Similar Projects

 Factor 2- Past Performance of Offeror

 Factor 3- Key Personnel

Evaluation Process:

The evaluation process will be conducted by the CO and the technical evaluation board in accordance with Lowest Price Technically Acceptable Evaluation Process.  As outline in the solicitation this procurement The Government intends to award a contract resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value from the selection of the technically acceptable proposal with the lowest evaluated price Evaluation Procedures: Proposals shall be evaluated as set forth in the RFP. Upon receipt of proposals the CO will rank proposals in order of price from lowest total evaluated price to highest total evaluated price. The Technical Evaluation Board will then evaluate the technical acceptability of the lowest priced proposal based on the technical factors and the evaluation standards outlined in the solicitation.  If the lowest priced proposal is determined to be technically acceptable the source selection process will be complete, and an award will be recommended.

Files

Show all 14

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
SSA 20th Floor Alterations- Design & Construction Services Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity