Price Breakdown Sheet 21 02 11 .xlsx
XLSX spreadsheet 25 KB Posted
- Solicitation number
- 47PE0221R0004
About this file
This document contains a price breakdown sheet and related federal contract opportunity notice. The price breakdown sheet is a template for contractors to provide cost estimates for the Social Security Administration's 20th floor alterations project in Atlanta, Georgia. The federal contract opportunity is a solicitation notice from the General Services Administration for design-build services on the same project. Key details include that the project involves space alterations including new partitions, office and meeting room renovations, finishes, electrical, HVAC, fire protection and security system modifications. The solicitation will use lowest price technically acceptable evaluation criteria. Factors for evaluation include experience on similar projects, past performance, and key personnel. The contracting agency is GSA Region 4 and the opportunity closing date is not provided. Proposals will be evaluated for technical acceptability and price, with award going to the lowest priced technically acceptable offeror.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Sumary Sheet
| 2/11/21 | Contractor Proposal Summary Worksheet | |||||
| Design Stage: | Agency: GSA, PBS Region 4 | Project: SSA 20th Floor Alterations | Fill In Gray Areas | Draft | ||
| Agency | GSA, PBS Region 4 | Based on my professional judgement this cost estimate should be considered as the Independent Government Estimate (IGE) for the identified work. | ||||
| Project | SSA 20th FL Alterations | |||||
| Description | Cost | Location | Atlanta, GA | |||
| Division 1 | General Requirements | $0.00 | ||||
| Division 2 | Site Work | $0.00 | ||||
| Division 3 | Concrete | $0.00 | Contractor Information | |||
| Division 4 | Masonry | $0.00 | Estimate Date | |||
| Division 5 | Metals | $0.00 | GC Overhead | 0% | ||
| Division 6 | Woods & Plastics | $0.00 | GC Profit | 0% | ||
| Division 7 | Thermal & Moisture | $0.00 | Insurance | 0% | ||
| Division 8 | Doors & Windows | $0.00 | Bond | 0% | ||
| Division 9 | Finishes: | $0.00 | AE Fees | 0% | ||
| Division 10 | Specialties | $0.00 | Design Stage | |||
| Division 11 | Equipment | $0.00 | Building Number/Address | 75 Ted Turner Dr SW, Atlanta, GA 30303 | ||
| Division 12 | Furnishings | $0.00 | Total SF | - 0 | ||
| Division 13 | Special Construction | $0.00 | ||||
| Division 14 | Conveying | $0.00 | ||||
| Division 21 | Fire Suppression | $0.00 | ||||
| Division 22 | Plumbing | $0.00 | ||||
| Division 23 | HVAC | $0.00 | ||||
| Division 26.1 | Electrical | $0.00 | ECC | Estimated Cost of Construction | ||
| Division 26.2 | Lighting | $0.00 | ECCA | Estimated Cost of Construction at Award | ||
| Division 27 | Communication | $0.00 | ETPC | Estimated Total Project Cost | ||
| Division 28.1 | Fire Alarm | $0.00 | ||||
| Division 28.2 | Security | $0.00 | ||||
| Division 32 | Exterior | $0.00 | ||||
| CSI Subtotal | $0.00 | |||||
| GC Markups | GC Overhead- .00% | $0.00 | ||||
| GC Profit- .00% | $0.00 | |||||
| Insurance- .00% | $0.00 | |||||
| Bond- .00% | $0.00 | |||||
| ECC | $0.00 | |||||
| A&E Fees- .00% | $0.00 | |||||
| ECCA | $0.00 | |||||
| Contractor Information |
Division Detail Sheet
| DIVISION | MATERIAL | LABOR | |||||
| Description | Quantity | Unit | Cost | Total | Hours | Labor Rate | Total |
| 0 | EA | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | EA | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | EA | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | EA | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | EA | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | EA | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | EA | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | EA | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | EA | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | EA | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | EA | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | EA | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | EA | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | EA | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | EA | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | EA | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | EA | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | EA | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | EA | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | EA | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | EA | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | EA | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | EA | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| Material Total | $0.00 | Labor Total | $0.00 |
DIVISION TOTAL $0.00
ESRI_MAPINFO_SHEET
DO NOT EDIT
For Esri use only
File details come from the government source that posted it. Updated .