DB Services for Underground Storage Tank (UST) Replacement at Sam Nunn AFC, ATL, GA

Closed Solicitation Posted

Solicitation number
47PE0220R0035
Agency
Responses due
Set-aside
Woman-Owned Small Business

Opportunity facts

PSC
5430 Storage Tanks
Place of performance
Atlanta GA 30303 USA

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Amendment to Solicitation #2

Questions and Response & supporting documents attached as of (8/21/20) .  To request structural drawings you will need to contact Project Manager at 404-431-0121 Shonda D. Piper=Cameron.

links to O&M information along with Notice of Violation. - Attachments

36110, 3616, 6700,9176,8764,1202,5847

Amendment to RFP-#1

Site visit scheduled for this Thursday  8/13/20 at 10:30 by appointment only.  Limited Attendance due to COVID-19. Everyone in attendance must wear a mask.  

The contact person to call: Shonda D. Piper-Cameron, Project Manager @ 404-431-0121.

______________                                                                                                            

To design the project to be most cost efficient. This design shall include, but not limited to all surveys, research, presentations, contract drawings, specifications, calculations and cost estimates necessary to complete this project.

The Contractor shall fulfill the requirements necessary for the removal and disposal of the existing 10,000 gallon UST and the installation of a new double-walled, fiberglass tank(s) with overfill prevention, spill protection and fuel delivery system. Contractor will also install an appropriate fire protection system surrounding the tank(s) to ensure NFPA standards are met. Contractor shall provide all materials, equipment, tools, transportation, permits, disposal, construction documents and shop drawings (as required) to successfully complete the project.  Also, the contractor shall provide the coordination, labor, and qualified licensed supervision and insurance necessary to successfully complete the project.
The work shall be designed and constructed in full compliance with the Georgia Environmental Protection Division (EPD) requirements, contract documents, scope of work document, specifications, and drawings, as well as, current national codes, regulations, and applicable trade standards, and GSA.
 

Update #2 ·

Amendment to RFP-

Site visit scheduled for this Thursday  8/13/20 at 10:30 by appointment only.  Limited Attendance due to COVID-19. Everyone in attendance must wear a mask.  

The contact person to call: Shonda D. Piper-Cameron, Project Manager @ 404-431-0121.

______________                                                                                                            

To design the project to be most cost efficient. This design shall include, but not limited to all surveys, research, presentations, contract drawings, specifications, calculations and cost estimates necessary to complete this project.

The Contractor shall fulfill the requirements necessary for the removal and disposal of the existing 10,000 gallon UST and the installation of a new double-walled, fiberglass tank(s) with overfill prevention, spill protection and fuel delivery system. Contractor will also install an appropriate fire protection system surrounding the tank(s) to ensure NFPA standards are met. Contractor shall provide all materials, equipment, tools, transportation, permits, disposal, construction documents and shop drawings (as required) to successfully complete the project.  Also, the contractor shall provide the coordination, labor, and qualified licensed supervision and insurance necessary to successfully complete the project.
The work shall be designed and constructed in full compliance with the Georgia Environmental Protection Division (EPD) requirements, contract documents, scope of work document, specifications, and drawings, as well as, current national codes, regulations, and applicable trade standards, and GSA.
 

Update #1 ·

To design the project to be most cost efficient. This design shall include, but not limited to all surveys, research, presentations, contract drawings, specifications, calculations and cost estimates necessary to complete this project.

The Contractor shall fulfill the requirements necessary for the removal and disposal of the existing 10,000 gallon UST and the installation of a new double-walled, fiberglass tank(s) with overfill prevention, spill protection and fuel delivery system. Contractor will also install an appropriate fire protection system surrounding the tank(s) to ensure NFPA standards are met. Contractor shall provide all materials, equipment, tools, transportation, permits, disposal, construction documents and shop drawings (as required) to successfully complete the project.  Also, the contractor shall provide the coordination, labor, and qualified licensed supervision and insurance necessary to successfully complete the project.
The work shall be designed and constructed in full compliance with the Georgia Environmental Protection Division (EPD) requirements, contract documents, scope of work document, specifications, and drawings, as well as, current national codes, regulations, and applicable trade standards, and GSA.
 

Files

Show all 19

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Replace Underground Storage Tank (UST) at Sam Nunn, ATL, GA Original Pre-Solicitation