CO OMAD 300(71) Minuteman Missile Access
Closed Pre-Solicitation Posted
- Solicitation number
- 6982AF26SS0026
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Cheyenne, Wyoming, United States
- Points of contact
-
- Laura Slauter cflcontracts@dot.gov (202) 366-4000
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Highway Administration is determining whether sufficient interest exists among qualified small-business contractors to support a set-aside for the CO OMAD 300(71) Minuteman Missile Access highway construction project, with expressions of interest due by August 13, 2026. This is a sources-sought vehicle, not a solicitation; no plans or specifications are available.
Interested firms must submit by email to cflacquisitions@dot.gov (Attn: Eric Grosskreuz) no later than close of business (2 p.m. Denver local time) on August 13, 2026, a positive statement of intent to bid as prime contractor, certification of all applicable socioeconomic statuses (8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB), a bonding agent letter confirming capability to bond a single project of $10 million and the firm's aggregate bonding capacity, and a list of completed road construction projects of equal or greater value and scope involving roadway reconditioning and aggregate surface course placement. Contractors must demonstrate experience in construction phasing, temporary traffic control, and timely completion and must state whether they performed as prime or subcontractor. Construction phasing, temporary traffic control, and timely completion experience is required. Eligible small-business categories include 8(a) firms, HUBZone small businesses, women-owned small business concerns, service-disabled veteran-owned small businesses, and other qualifying socioeconomic designations. All firms must be registered in SAM.gov. The work falls under NAICS 237310 (Highway, Street, and Bridge Construction) and PSC Y1LB (Construction of Highways, Roads, Streets, Bridges, and Railways).
Notice text
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs must submit the following by e-mail to cflacquisitions@dot.gov (Attn: Eric Grosskreuz) for receipt by close of business (2 p.m. local Denver time) on August 13, 2026:
(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;
(2) A list of all confirmed socioeconomic categories (i.e., 8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business;
(3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $10 million, and your firm’s aggregate bonding capacity; and
(4) Provide a list of road construction projects of equal or greater value and scope to the CO OMAD 300(71) project in which contractor performed work in roadway reconditioning and placing aggregate surface course on roadways. Experience in construction phasing, temporary traffic control, and timely completion of construction is required. State whether the firm was the prime contractor or subcontractor on the project.
DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.
The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/
Project Details:
CO OMAD 300(71) Minuteman Missile Access
The Office of Missile Air Defense Program (OMAD) is a Defense Access Road (DAR) program used by the Department of Defense (DoD) to fund the annual maintenance and improvements on certified gravel roads. FHWA works with the Military Surface Deployment and Distribution Command (SDDC) to support the Air Force Intercontinental Ballistic Missile Program (Minuteman). These Minuteman Missile Access Roads are located in southwestern Wyoming, southeastern Nebraska, and northeastern Colorado.
In cooperation with the F.E. Warren Air Force Base and Central Federal Lands Highway Division, this project includes re-graveling up to 85.75 miles of existing gravel Minuteman Missile Access Roads consisting entirely of unawarded roads from CO OMAD 300(71) in various counties within Colorado, Nebraska, and Wyoming. The intent of this project is to provide necessary aggregate road maintenance for select routes utilized by the United States Air Force.
The work includes roadway reconditioning and adding four inches of aggregate surface course as well as the replacement of up to 73 culverts. All proposed work is to stay on the existing roadway bench. The proposed typical section consists of reconditioning the existing gravel roadway per Section 303 and adding an additional 4-inches of Aggregate Surface Course with a maximum width of 24-feet. A 4% crown is proposed or as approved by the CO. The Contractor will need to taper down the proposed aggregate surface, per the typical section, at applicable locations.
The project will be procured under the FPVS (Fixed-Price Variable Scope) contracting method and includes up to 85.75 miles of variable scope roadway reconditioning and re-graveling, and up to 73 culverts of variable scope in length. The project PS&E will provide a prioritized schedule of roadways to be improved that includes roadway reconditioning and re-graveling of existing aggregate surface roads within the existing roadway bench; as well as the replacement of up to 73 culverts.
PRINCIPAL WORK ITEMS:
67001-0000 Project Lump Sum (Section 152 – Survey and Staking Drainage Structure)
67001-0000 Project Lump Sum (Section 153 – Contractor Quality Control)
67001-0000 Project Lump Sum (Section 602 – Pipe Culvert)
67001-0000 Project Lump Sum (Section 301 – Aggregate Surface Course)
ANTICIPATED SCHEDULE:
It is anticipated that this project will be advertised in September 2026 and be under construction in April 2027. The project has an estimated completion date of September 2027.
The estimated price range of the project work is between $5,000,000 and $10,000,000.
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| WY BR WYAO US20(1) US 20 and Hayden Arch Bridge Repairs | Federal Highway Administration | No set-aside | |
| Paving Acquisition Vehicle - Rockies (PAV-R) IDIQ Sources Sought | Air Force Space Command | Total Small Business | |
| Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY24(1) | Federal Highway Administration | Total Small Business | |
| ND NP THRO 204(1) Buck Hill Road | Federal Highway Administration | No set-aside | |
| Instrument Landing Structure (ILS) | ENDIST Fort Worth | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity