Clear Lake Camp Rehabilitation

Award Notice Posted

Solicitation number
AG-54B0-S-10-0015
Agency
Awarded
to Oberstar Inc.
Set-aside
HUBZone

Opportunity facts

Contract number
AG54B0C100001 Federal contract award
PSC
Not on record
Place of performance
Alger County Escanaba, Michigan 49829, United States

Notice details come from SAM.gov. Updated .

Notice text

Work entails the following by phase.

Phase 1

1. Replace existing septic drain field, septic tanks and dosing tank.

2. Replace existing water tower with a hydro-pneumatic tank water system.

3. Rehabilitate existing pump house.

4. Replace one submersible well pump and test two existing wells.

Phase 2

1.The project shall include the reconstruction and asphalt paving of the access road and bus turnaround

2.The reshaping and concrete paving of the main walkway

3.The construction of a segmented block retaining wall, a gathering area with concrete paving and a segmented block seat wall constructed around it.

4.Construction of a french drain running the length of the main walkway, drainage piping and 3 storm water catch basins to collect water from the french drain.

5. Construction of concrete curbing in front of the 2 main buildings.

6.Construction of 2 diversion ditches and a center drain for the access road and bus turnaround.



Estimated start date is July 5,2010 with 120 days to complete the project. Project Estimate is $250,000 to $500,000. This is a 100% hubzone setaside project.

Files

File Type Posted
Phase 2 CONTRACT_SPECS2.pdf PDF
hubzone_brochure.pdf PDF
wages.pdf PDF
drawings_cl_lk.pdf PDF
RFP.pdf PDF
Phase 1Final Specs.pdf PDF
kr_keep.pdf PDF

Notice history

Notice Type Posted
Clear Lake Camp Rehabilitation Latest Award Notice
This notice Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity