Phase 1Final Specs.pdf

PDF 286 KB Posted

Attached to
Clear Lake Camp Rehabilitation
Solicitation number
AG-54B0-S-10-0015
Issued by

About this file

Phase I Specifications

View the file

Other files

File Type Posted
hubzone_brochure.pdf PDF
Phase 2 CONTRACT_SPECS2.pdf PDF
wages.pdf PDF
drawings_cl_lk.pdf PDF
RFP.pdf PDF
kr_keep.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-54B0-S-10-0015 Clear Lake Camp Rehab

Water and Septic System Rehab Project Phase 1

CLEAR LAKE CAMP REHABILITATION – PHASE 1

WATER SYSTEM AND SEPTIC SYSTEM REHABILITATION

SECTION 011000 - SUMMARY

SECTION 011400 - WORK RESTRICTIONS

SECTION 012700 - UNIT PRICES

SECTION 014000 - QUALITY CONTROL

SECTION 014200 - REFERENCES

SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS

SECTION 017000 - EXECUTION REQUIREMENTS

SECTION 017700 - CLOSEOUT PROCEDURES

SECTION 024116 - STRUCTURE DEMOLITION

SECTION 061600 - SHEATHING

SECTION 072100 - THERMAL INSULATION

SECTION 221115 – WATER SYSTEM CLEANING, TESTING & DISINFECTION 25

SECTION 221223 - POTABLE-WATER STORAGE TANKS

SECTION 260500- BASIC ELECTRICAL MATERIALS AND METHODS

SECTION 311000 - SITE CLEARING

SECTION 312000 – EARTH MOVING

SECTION 312334 - UTILITY LINE MARKING………………………………………35

SECTION 321313 - CAST-IN-PLACE CONCRETE

SECTION 329200 – SEEDING AND MULCHING

SECTION 331100 - WATER DISTRIBUTION

SECTION 332100 - WATER SUPPLY WELLS

SECTION 025300 - SANITARY SEWERAGE

Prepared by John Janson 9/2/2009

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 PROJECT IDENTIFICATION

A. Project Name and Location: Replace the existing septic system drain field and rehabilitate the existing water system, at Clear Lake Camp located off State Highway

94 on Forest Road 2246 approximately 15 miles southeast of Munising, Michigan in T-

45-N, R-17-W, Section 34.

B. Project Summary Description: The project includes but is not limited to the following

Work:

1. Replace existing septic drain field, septic tanks and dosing tank.

2. Replace existing water tower with a hydro-pneumatic tank water system.

3. Rehabilitate existing pump house.

4. Replace one submersible well pump and test two existing wells.

C. Government or Owner refers to the USDA Forest Service. Contracting Officer (CO) refers to the person assigned by the USDA Forest Service to administer the Contract.

The Contracting Officer will designate a Contracting Officers Representative (COR) to administer the Contract on-site.

1.2 CONTRACTOR USE OF SITE AND PREMISES

A. Contractor may use on-site power, water, and toilet facilities, free of charge.

PART 2 - PRODUCTS & PART 3 – EXECUTION (Not Applicable)

END OF SECTION 011000

SECTION 011400 - WORK RESTRICTIONS

1.2 CONTRACTOR USE OF PREMISES

A. The Government will conduct a pre-construction survey with the Contractor to review and document the existing project conditions prior to construction.

B. The Contractor shall have full use of the work area during a 3 week construction period that is scheduled jointly, 45 days prior to the construction effort, with the

Camp and the COR. No work shall be performed on weekends or Government

Holidays, unless authorized, in writing, by the Government.

C. The Contractor shall limit use of the premises to the work in areas indicated.

1. Confine operations at the site to areas indicated.

2. Schedule deliveries to minimize on-site storage of material and equipment.

3. Repair damage caused by construction operations. Take precautions to protect the public.

4. Space on the premises is available for the Contractor's storage and related activities.

5. Existing materials and equipment that are removed as part of the construction operations, and that are not reused or salvaged as Government property, shall become the property of the Contractor and shall be promptly removed from the site.

1.3 GOVERNMENT OCCUPANCY

A. The Government will occupy the site during the construction. Cooperate with the

Government's representatives during construction operations to minimize conflicts and facilitate Government usage. Perform the Work in a manner that does not interfere with the Government's operations.

PART 2 - PRODUCTS (Not Applicable) & PART 3 - EXECUTION (Not Applicable)

END OF SECTION 011400

SECTION 012700 - UNIT PRICES

1.1 SUMMARY

A. A unit price provides an amount proposed by the Contractor and stated on the Schedule of Items as a price per unit of measurement for materials or services.

B. Unit prices include all necessary material and labor costs, overhead, profit, taxes, shipping and other related expenses for the added or deducted work.

1.2 PROCEDURES

A. Measurement: Method of measurement for each unit price is specified in the specification section applicable to the work.

B. Verification: The Government reserves the right to reject the Contractor's measurement of work in place that involves use of an established unit price, and to have this work measured, at the Government's expense, by an independent surveyor acceptable to the

Contractor.

C. Methods of Measurement:

1. Lump Sum Quantities (LSQ): These quantities denote one complete unit of work as required by or described in the Contract, including all necessary materials, equipment, and labor to complete the job. They will not be measured.

2. Actual Quantities (AQ): These quantities denote completed units of work, as described in the Contract, including all necessary materials, equipment, and labor, to complete the job. They will be measured in the field.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION (Not Applicable)

END OF SECTION 012700

SECTION 014000 - QUALITY CONTROL

1.1 SUMMARY

A. This section, FAR 52.246-1 and FAR 52.246-12 include requirements for quality control services to verify quality assurance requirements specified elsewhere in the

Contract.

B. The Government reserves the right to conduct independent tests.

C. This section includes requirements for quality control services: water and sewer line pressure tests, septic tank leak checks, concrete tests, and drain rock gradation tests.

D. The quality control services include tests and related actions, including reports, performed by the Contractor, independent agencies or governing authorities.

1.2 RESPONSIBILITIES

A. Contractor Responsibilities: The Contractor shall provide for tests, inspections and other quality control services where specified in the Contract or when required by authorities having jurisdiction. Costs for these services are included in the Contract price. The Contractor shall maintain complete inspection records and make them available to the government.

B. The Contractor shall employ and pay for a qualified independent testing agency

(Agency) to perform quality control services.

C. Retesting: The Contractor is responsible for retesting, including repeated inspections and other services, where results of the initial tests, inspections or other quality control services indicate noncompliance with the requirements of the Contract.

D. Associated Services: The Contractor shall cooperate with others performing required tests, inspections and other quality control services, shall provide access to the work, and shall furnish incidental labor and facilities necessary to facilitate inspections and tests.

E. Take adequate quantities of representative samples of materials that require testing or assist the agency in taking samples.

1. Deliver samples to testing laboratories.

2. Provide security and protection of samples and test equipment at the Project site.

F. The Agency shall provide qualified personnel to perform required inspections and tests.

G. The Agency shall notify the Government and the Contractor of irregularities or deficiencies observed in the Work during performance of their services.

H. The Agency is not authorized to change requirements of the Contract or approve or accept any portion of the Work. The Agency shall not perform any duties of the

Contractor.

1.3 QUALIFICATIONS OF INDEPENDENT TESTING AGENCIES

A. A qualified independent testing Agency shall be an accredited entity engaged to perform tests or inspections, and to report on and, if required, to interpret results of those tests or inspections.

1.4 SUBMITTALS

A. Reports: The Contractor shall submit a certified written report, in duplicate, of each test, inspection or other quality control service to the Government.

B. Written reports shall include but not be limited to the following:

1. Date of issue.

2. Project title and number.

3. Name, address, and telephone number of testing agency.

4. Dates and locations of samples and tests or inspections.

5. Names of individuals making the test or inspection.

6. Designation of the work and test method.

7. Identifications of product and specification section.

8. Complete test or inspection data.

9. Test results and an interpretation of test results.

10. Ambient conditions at the time of sample taking and testing.

11. Comments or professional opinion on whether tested or inspected Work complies with Contract Document requirements.

12. Name and signature of laboratory inspector.

13. Recommendations on retesting.

C. Permits, Licenses, and Certificates: For the Government's records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on performance of the Work.

PART 2 - PRODUCTS (Not applicable)

PART 3 - EXECUTION (Not applicable)

END OF SECTION 014000

SECTION 014200 - REFERENCES

1.1 DEFINITIONS

A. General Explanation: Specification language often includes terms that are defined elsewhere in the Contract including the Construction Clauses. Certain terms are defined in this section. These definitions or explanations are not necessarily complete or exclusive, but are general for the Work and may be explained more explicitly in other sections.

B. "General Conditions" refer collectively to the Construction Contract Clauses, Labor

Standards and the U.S. Department of Labor Wage Decision bound into the specifications.

C. "Indicated" refers to graphic representations, notes or schedules on the Drawings, or to requirements elsewhere in the Specifications or other Contract Documents. Terms such as "shown", "noted", "scheduled" and "specified" have the same meaning as "indicated" and are used to further help locate the reference, but no limitation on location is intended except as specifically stated.

D. Where "directed", "authorized", "selected", "approved", or a similar term is used in conjunction with the Contractor's submittals, applications, requests and other activities, and the specifications state that an individual other than the Contracting Officer (CO) shall provide this action, it is understood that only the CO has this authority unless the individual stated is so authorized in writing by the CO.

1. When the individual is so authorized by the CO, the Contractor may still appeal the action to the CO.

2. The CO’s decision will be final.

3. In no case shall the CO action be interpreted as releasing the Contractor from responsibility to fulfill the requirements of the Contract.

E. "Regulations" include laws, ordinances, statutes and lawful orders issued by authorities having jurisdiction, as well as rules, conventions and agreements within the construction industry that control performance of the Work.

F. "Project site" refers to the space available to the Contractor for performance of the

Work, either exclusively or in conjunction with others performing other work.

G. "Furnish" means to supply and deliver to the Project site, ready for unloading, unpacking, assembling, installation and similar operations.

H. "Install" describes operations at the Project site, including unloading, temporary storage, unpacking, assembling, erecting, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning and similar operations.

I. "Provide" means to furnish and install, complete in place and ready for full use.

J. "Cutting" refers to removal of material by cutting, sawing, drilling, breaking, chipping, grinding, excavating and similar operations.

K. "Patching" refers to restoration of a surface to its original completed condition by filling, repairing, refinishing, closing and similar operations.

L. "Installer" is the Contractor or another entity engaged by the Contractor, either directly or indirectly through subcontracting, to perform a particular construction operation at the Project site, including installation, erection, application and similar operations.

Installers shall be skilled in the operations they perform.

M. "Testing agency" or "testing laboratory" is an independent entity engaged to perform specific inspections or tests, either at the Project site or elsewhere, and to report the results of those inspections and tests.

N. "Notice to Proceed" is the CO’s notification by letter to the Contractor to proceed with the Contract, activating the time period for construction and establishing the completion date.

1.2 CODES AND STANDARDS

A. Applicability of Standards: Unless the Contract includes more stringent requirements, applicable construction industry standards have the same force and effect, to the extent referenced, as if bound or copied directly into the Contract. Such standards are made a part of the Contract by reference.

B. Codes: The Work shall be performed in compliance with the latest editions of the following codes: NEC, IBC, IPC and IMC.

C. Conflicting Requirements. Where compliance with two or more standards is specified, comply with the most stringent requirement. Refer uncertainties, and requirements that are different but apparently equal, to the CO in writing for a decision before proceeding.

D. Abbreviations: Names and titles of standards are frequently abbreviated.

Abbreviations and acronyms used in the Contract mean the recognized name of a trade association, standards-producing organization, authority having jurisdiction or other entity applicable to the context of the particular provision. Except as otherwise indicated, refer to the current editions of the following publications for abbreviations:

1. "Encyclopedia of Associations: National Organizations of the U.S.", published by Gale Research.

2. "National Trade and Professional Associations of the United States", published by Columbia Books.

3. "Means Illustrated Construction Dictionary - New Unabridged Edition" published by R.S. Means Company, Inc.

E. Abbreviations: Names and titles of standards are frequently abbreviated.

Abbreviations and acronyms used in the Contract mean the associated names. The following names may be referenced in the Contract:

1. AASHTO - American Association of State Highway and Transportation

2. ACI - American Concrete Institute

3. ADA – American’s with Disabilities Act

4. ADAAG – Americans with Disabilities Act Accessiblity Guidelines

5. AI - Asphalt Institute

6. AISC - American Institute of Steel Construction

7. AITC - American Institute of Timber Construction

8. ALSC – American Lumber Standard Committee

9. ANSI - American National Standards Institute

10. ASME – American Society of Mechanical Engineers International

11. ASTM - American Society for Testing and Materials

12. AWPA - American Wood-Preservers' Association

13. AWS - American Welding Society

14. AWWA - American Water Works Association

15. CABO - Council of American Building Officials

16. CFR - Code of Federal Regulations

17. CRSI - Concrete Reinforcing Steel Institute

18. CS - Commercial Standard (U.S. Dept. of Commerce)

19. CSI - Construction Specifications Institute

20. DOT – Department of Transportation

21. EIA - Electronic Industries Association

22. EPA - Environmental Protection Agency

23. FS - Federal Specification (Publications available from GSA)

24. GSA - General Services Administration

25. IBC – International Building Code

26. IFC – International Fire Code

27. IPC – International Plumbing Code

28. ICBO – International Conference of Building Officials

29. MCAA – Mechanical Contractors Association of America

30. MSS-Manufacturers Standardization Society of the Valve & Fitting Industry Inc.

31. NECA – National Electrical Contractors Association

32. NEMA - National Electrical Manufacturers Association

33. NEC – National Electrical Code

34. NFPA - National Fire Protection Association

35. OSHA - Occupational Safety and Health Administration (U.S. Dept. of Labor)

36. PCA - Portland Cement Association

37. SSPC - Steel Structures Painting Council - The Society for Protective Coatings

38. UFAS – Uniform Federal Accessibility Standards

39. UL - Underwriters Laboratories Inc.

40. IMC – International Mechanical Code

41. USDA - U.S. Department of Agriculture

PART 2 - PRODUCTS (Not applicable) and PART 3 - EXECUTION (Not applicable)

END OF SECTION 014200

SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS

1.1 SUMMARY

A. Provide temporary utilities, support facilities, protection, and controls required for construction. Provide project work signs and secured areas to direct safe construction operations.

1.2 QUALITY ASSURANCE

A. Standards and Regulations: Comply with industry standards, codes, and with applicable laws and regulations of authorities having jurisdiction.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION

3.1 TEMPORARY UTILITIES

A. Temporary Utility Service: Provide as needed to keep normal operations uninterrupted.

3.2 TEMPORARY SUPPORT FACILITIES

A. Provide temporary enclosures for protection of construction as needed. Collect waste from construction areas and elsewhere daily.

3.3 TEMPORARY PROTECTION FACILITIES

A. Barricades, Warning Signs, and Lights: Comply with standards and code requirements for erecting structurally adequate barricades. Paint with appropriate colors, graphics, and warning signs to inform personnel and the public of the hazard involved.

3.4 OPERATION, TERMINATION, AND REMOVAL

A. Maintain facilities in good operating condition until removal. Each temporary facility shall be removed when need for has ended.

END OF SECTION 015000

SECTION 017000 - EXECUTION REQUIREMENTS

1.1 SUMMARY

A. This section, FAR 52.236-5, FAR 52.236-12 and FAR 52.236.17 include certain general procedural requirements governing the Contractor's execution of the Work, including, but not limited to laying out the Work, general installation of products, correction of defective Work, and cleaning.

1.2 QUALITY ASSURANCE

A. Workmanship Standards: Initiate and maintain procedures to ensure personnel performing the Work are skilled and knowledgeable in the methods and craftsmanship needed to produce the required levels of workmanship. Remove and replace Work that does not comply with workmanship specified and standards recognized in the construction industry for the applications indicated. Remove and replace Work damaged or deteriorated by faulty workmanship or replacement of other Work.

1. Manufacturer's Instructions: Where installations include manufactured products, comply with manufacturer's applicable installation instructions and recommendations to the extent that those instructions and recommendations are more explicit or stringent than requirements contained in the Contract. The

Contracting Officer’s Representative shall be immediately notified of conflicts between manufacturer’s instructions and the Contract.

2. Minimum Quality and Quantity: The quality level or quantity shown or specified shall be the minimum required for the Work. Except as otherwise indicated, the

Work shall comply exactly with that minimum or may be superior to that minimum. Specified numeric values are either minimums or maximums as indicated or as appropriate for the context of the requirements.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION

3.1 LAYING OUT THE WORK

A. Before proceeding to lay out the Work, verify layout information shown on the

Drawings, in relation to the property survey and existing benchmarks. If discrepancies are discovered notify the Contracting Officer's Representative promptly.

B. Maintain existing benchmarks at the sites as indicated on the Drawings or replace at new locations.

C. Existing Utilities and Equipment: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning sitework, investigate and verify the existence and location of underground utilities and other construction.

3.2 PREPARATION

A. Site Improvements: The Contractor is responsible for all staking, maintaining and replacing of staking, except: The Government will mark existing benchmarks locations on the ground. The Government will establish (one time only) the corners of all buildings and the clearing limits of the on-site septic system drain fields.

B. Existing Utilities: Furnish information necessary to adjust, move, or relocate existing structures, utility poles, lines, services, or other appurtenances located in or affected by construction. Coordinate with local authorities having jurisdiction.

C. Take field measurements as required to fit the Work properly.

3.3 INSTALLATION

A. Locate the Work and components of the Work accurately. Make vertical work plumb and horizontal work level.

B. Install products at the time and under conditions that will produce satisfactory results.

C. Conduct construction operations so that no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.

D. Anchors and Fasteners: Provide anchors and fasteners as required to withstand stresses, vibration and physical distortion. Anchor each component securely in place, accurately located and aligned with other Work.

E. Adjust operating components for proper operation without binding.

3.4 CORRECTION OF DEFECTIVE WORK

A. Repair or remove and replace defective construction. Restore damaged substrates and finishes.

B. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and proper adjustment of operating equipment.

C. Remove and replace damaged surfaces that are exposed to view if the surfaces cannot be repaired without visible evidence of repair.

D. Repair components that do not operate properly. Remove and replace operating components that cannot be repaired to operate properly.

E. Remove and replace chipped, scratched or broken surfaces.

3.5 CLEANING

A. Maintain the project site and work areas free of waste material and debris.

B. Clean areas where Work is in progress to the level of cleanliness necessary for proper execution of the work.

1. Remove liquid spills promptly.

C. Remove debris from concealed spaces prior to enclosing the space.

D. Clean exposed surfaces and protect as necessary to ensure freedom from damage and deterioration at the time of project completion.

3.6 PROTECTION

A. Protect installed work from soiling and damage.

B. Protective Coverings: Provide appropriate protective coverings for work that might be damaged by subsequent operations. Maintain protective coverings in place until project completion.

END OF SECTION 017000

SECTION 017700 - CLOSEOUT PROCEDURES

1.1 SUMMARY

A. This Section includes requirements for Contract close out.

B. Substantial Completion is defined as that state when the Contractor has complied with the Contract, except for minor deviations, and the project is sufficiently complete and capable of being occupied and used by the Government for the intended purpose.

1.2 SUBSTANTIAL COMPLETION

A. Preliminary Procedures: Before requesting inspection for Substantial Completion, complete the following.

1. Submit a list to the Contracting Officer, of incomplete items, the value of incomplete construction, and reasons the Work is not complete.

2. Submit operation and maintenance manuals, and As-Built Drawings.

3. Make final change over of valve keys to the Government.

4. Complete startup testing of systems and instruction of the Government operation and maintenance personnel. Discontinue and remove temporary facilities from the site, along with mockups, construction tools, and similar elements.

B. Inspection Procedures: The Contracting Officer will notify the Contractor of

Substantial Completion following an inspection or advise the Contractor of construction that must be completed or corrected before Substantial Completion.

1. The Government will repeat the inspection when requested and when assured that the Work is substantially complete.

2. Results of the completed inspection will form the basis of the requirements for

Final Acceptance.

1.3 FINAL ACCEPTANCE

A. Preliminary Procedures: Before requesting inspection for Final Acceptance, complete the following:

1. Submit final payment request with releases and supporting documentation not previously submitted and accepted.

2. Submit an updated final statement accounting for final additional changes to the

Contract price.

3. Submit a certified copy of the previous Substantial Completion inspection list of items.

4. Submit specific warranties, workmanship bonds, maintenance agreements, final certifications and similar documents.

5. Submit record documents and similar final record information.

6. Deliver tools, spare parts, extra stock and similar items.

7. Complete final clean-up requirements including touch-up painting of marred surfaces.

B. Final Inspection Procedure: The Government will inspect the Work upon receipt of notice from the Contractor that the Work, including inspection list items from earlier inspections, has been completed, except for items whose completion is delayed under circumstances acceptable to the CO.

1. Upon completion of inspection, the CO will notify the Contractor of Final

Acceptance or will advise the Contractor of Work that it is incomplete or of obligations that have not been fulfilled and are required for Final Acceptance.

1.4 RECORD DOCUMENT SUBMITTALS

A. Record Drawings: Maintain a clean, undamaged set of blue or black line prints of

Contract Drawings and Shop Drawings. Mark the set to show the actual installation where the installation varies substantially from the Work as originally shown. Mark the drawing that is most capable of showing conditions fully and accurately. Where Shop

Drawings are used, record a cross-reference at the corresponding location on the

Contract Drawings. Give particular attention to concealed elements that would be difficult to measure and record at a later date.

B. Record Product Data: Maintain one copy of each Product Data submittal. Note related

Change Orders and markup of Record Drawings and Specifications.

1. Mark these documents to show significant variations in actual Work performed in comparison with information submitted. Include variations in products delivered to the site and from the manufacturer’s installation instructions and recommendations.

2. Give particular attention to concealed products and portions of the Work that cannot otherwise be readily determined later by direct observation.

1.5 OPERATION AND MAINTENANCE MANUALS

A. Organize operation and maintenance data in suitable sets of manageable size (2 copies).

Bind properly indexed data in individual, heavy-duty, 2-inch (51 mm), 3-ring, vinyl-covered binders, with pocket folders for folded sheet information. Mark appropriate identification on front and spine of each binder. Include the following types of information.

1. Emergency instructions.

2. Spare parts lists.

3. Copies of warranties.

4. Inspection procedures.

5. Shop Drawings and Product Data.

1.6 UTILITY LINES SITE PLAN

A. Provide an accurately dimensioned site plan showing survey location and elevation of all utility lines, including valves, connections and changes in direction, as installed under the Contract within property lines and outside of building walls. Points where utility lines leave buildings shall be dimensioned from building corners.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION

3.1 CLOSEOUT PROCEDURES

A. Operation and Maintenance Instructions: Arrange for each Installer of equipment that requires regular maintenance to meet with the Government’s personnel to provide instruction in proper operation and maintenance. Provide instruction by manufacturer’s representatives or installers. Include the following:

1. Maintenance manuals and Record documents.

2. Spare parts and materials.

3. Tools and lubricants.

4. Identification systems.

5. Control sequences.

6. Hazards and Cleaning.

7. Warranties and bonds.

8. Maintenance agreements and similar continuing commitments.

B. As part of instruction for operating equipment, demonstrate the following procedures to site maintenance personnel:

1. Startup and Shutdown.

2. Emergency operations.

3. Noise and vibration adjustments.

4. Safety procedures.

5. Economy and efficiency adjustments.

6. Effective energy utilization.

3.2 FINAL CLEANING

A. Employ experienced workers or professional cleaners for final cleaning. Clean each surface or unit to the condition expected in a normal, commercial cleaning and maintenance program. Comply with manufacturer’s instructions.

1. Complete the following cleaning operations before requesting inspection for

Final Acceptance.

a. Clean the site, including landscape development areas, of rubbish, litter and other foreign substances. Sweep paved areas broom clean, and remove stains, spills, and other foreign deposits.

B. Compliance: Do not burn waste materials. Do not bury debris or excess materials on

Government property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from the site and dispose of it lawfully.

END OF SECTION 017700

SECTION 024116 - STRUCTURE DEMOLITION

1.1 SUMMARY

A. This Section includes the following:

1. Demolition of an existing elevated water tank, including tower, pipe and appurtenances.

2. Abandoning in place below-grade water lines.

3. Removing and recycling existing water hydrants, manhole, and valves.

1.2 DEFINITIONS

A. Demolish: Demolish, in place, and bury concrete meter manhole on site. Remove all other items including the elevated water tank, pipe, hydrants, valves, etc from site and recycle.

B. Recycle: Recovery of demolition waste for subsequent processing for reuse.

1.3 MATERIALS OWNERSHIP

A. Unless otherwise indicated, removed waste becomes property of Contractor.

B. On-site storage or sale of removed items or materials is not permitted.

PART 2 - PRODUCTS

2.1 SOIL MATERIALS

A. Satisfactory Soils: Comply with requirements in Division 31 Section "Earth Moving."

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped before starting demolition operations.

B. Review Project Record Documents of existing construction provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project

Record Documents.

3.2 PROTECTION

A. Existing Facilities: Protect adjacent walkways, loading docks, building entries, and other building facilities during demolition operations. Maintain exits from existing buildings.

B. Existing Utilities: Maintain utility services to remain and protect from damage during demolition operations.

3.3 DEMOLITION, GENERAL

A. General: Demolish indicated existing water tank as indicated. Use methods required to complete the Work within limitations of governing regulations.

B. Mercury float valves in the water tank shall be legally disposed of as hazardous materials.

C. Explosives: Use of explosives is not permitted.

3.4 DEMOLITION BY MECHANICAL MEANS

A. Remove water valves and hydrants that protrude above ground level. Remove to at least

2’ below ground surface.

B. Break up and bury in place concrete meter manhole after removing and disposing of the existing piping, valves, and water meter in the manhole and after plumbing the new water system.

C. Demolish existing water lines and below-grade water structures that are within new construction trenches. Abandon buried water line outside this area.

3.5 SITE RESTORATION

A. Site Grading: Uniformly rough grade area of demolished construction to a smooth surface, free from irregular surface changes. Provide a smooth transition between adjacent existing grades and new grades.

3.6 DISPOSAL OF DEMOLISHED MATERIALS

A. Remove demolition waste materials from Project site, except as indicated.

B. Remove demolition waste materials from Project site and legally dispose of them in an

EPA-approved landfill acceptable to authorities having jurisdiction.

C. Do not burn demolished materials.

END OF SECTION 024116

SECTION 061600 - SHEATHING

1.1 SUMMARY

A. Section Includes:

1. Interior wall sheathing.

2. Ceiling sheathing.

PART 2 - PRODUCTS

2.1 WALL AND CEILING SHEATHING

A. Oriented-Strand-Board Wall Sheathing: Exposure 1, Structural I sheathing.

1. Type and Thickness: Regular, 1/2 inch.

2.2 FASTENERS

A. General: Provide fasteners of size and type indicated that comply with requirements specified in this article for material and manufacture.

1. For ceiling and wall sheathing, provide fasteners with hot-dip zinc coating complying with ASTM A 153/A 153M.

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Do not use materials with defects that impair quality of sheathing or pieces that are too small to use with minimum number of joints or optimum joint arrangement. Arrange joints so that pieces do not span between fewer than three support members.

B. Cut panels at penetrations, edges, and other obstructions of work; fit tightly against abutting construction unless otherwise indicated.

C. Securely attach to substrate by fastening as indicated, complying with the following:

1. NES NER-272 for power-driven fasteners.

2. Table 2304.9.1, "Fastening Schedule," in ICC's "International Building Code."

3. Table R602.3(1), "Fastener Schedule for Structural Members," and

Table R602.3(2), "Alternate Attachments," in ICC's "International Residential

Code for One- and Two-Family Dwellings."

END OF SECTION 061600

SECTION 072100 - THERMAL INSULATION

1.1 SUMMARY

A. Section Includes:

1. Glass-fiber blanket insulation.

2. Preformed Pipe insulation.

1.2 SUBMITTALS

A. Product Data: For each type of product indicated.

PART 2 - PRODUCTS

2.1 GLASS-FIBER BLANKET INSULATION

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. CertainTeed Corporation.

2. Guardian Building Products, Inc.

3. Johns Manville.

4. Knauf Insulation.

5. Owens Corning.

B. Polypropylene-Scrim-Kraft-Faced, Glass-Fiber Blanket Insulation: ASTM C 665, Type II (non-reflective faced), Class A (faced surface with a flame-spread index of 25 or less); Category 1 (membrane is a vapor barrier).

C. Kraft-Faced, Glass-Fiber Blanket Insulation: ASTM C 665, Type II (non-reflective faced), Class C (faced surface not rated for flame propagation); Category 1 (membrane is a vapor barrier).

2.2 PIPE INSULATION

A. Pipe insulation shall be preformed, made of durable mineral fiber, ½” minimum thickness, and with 2.0 minimum R value for use below grade.

B. Manufacturers: Subject to compliance with requirements, provide preformed properly sized pipe insulation products for use below grade by one of the following:

1. CertainTeed Corporation.

2. Guardian Building Products, Inc.

3. Johns Manville.

4. Knauf Insulation.

5. Owens Corning.

2.3 VAPOR RETARDERS

A. Polyethylene Vapor Retarders: ASTM D 4397, 6 mils thick.

B. Vapor-Retarder Tape: Pressure-sensitive tape of type recommended by vapor-retarder manufacturer for sealing joints and penetrations in vapor retarder.

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Comply with insulation manufacturer's written instructions applicable to products and applications indicated.

B. Install insulation that is undamaged, dry, and unsoiled and that has not been left exposed to ice, rain, or snow at any time.

C. Extend insulation to envelop entire area to be insulated. Cut and fit tightly around obstructions and fill voids with insulation. Remove projections that interfere with placement.

D. Provide sizes to fit applications indicated and selected from manufacturer's standard thicknesses, widths, and lengths. Apply single layer of insulation units to produce thickness indicated unless multiple layers are otherwise shown or required to make up total thickness.

3.2 INSTALLATION OF BELOW-GRADE PIPE INSULATION

A. Install preformed pipe insulation to frost depth of 60” from pump house floor.

3.3 INSTALLATION OF INSULATION FOR FRAMED CONSTRUCTION

A. Apply insulation units to substrates by method indicated, complying with manufacturer's written instructions. If no specific method is indicated, bond units to substrate with adhesive or use mechanical anchorage to provide permanent placement and support of units.

B. Glass-Fiber or Mineral-Wool Blanket Insulation: Install in cavities formed by framing members according to the following requirements:

1. Use insulation widths and lengths that fill the cavities formed by framing members. If more than one length is required to fill the cavities, provide lengths that will produce a snug fit between ends.

2. Place insulation in cavities formed by framing members to produce a friction fit between edges of insulation and adjoining framing members.

3. Maintain 3-inch clearance of insulation around recessed lighting fixtures not rated for or protected from contact with insulation.

4. Install eave ventilation troughs between roof framing members in insulated attic spaces at vented eaves.

5. For metal-framed wall cavities where cavity heights exceed 96 inches, support unfaced blankets mechanically and support faced blankets by taping flanges of insulation to flanges of metal studs.

6. For wood-framed construction, install blankets according to ASTM C 1320 and as follows:

a. With faced blankets having stapling flanges, secure insulation by inset, stapling flanges to sides of framing members.

b. With faced blankets having stapling flanges, lap blanket flange over flange of adjacent blanket to maintain continuity of vapor retarder once finish material is installed over it.

3.4 INSTALLATION OF VAPOR RETARDERS

A. Place vapor retarders inside of all walls and ceiling. Extend vapor retarders to extremities of areas to protect from vapor transmission. Secure vapor retarders in place with adhesives or other anchorage system as indicated. Extend vapor retarders to cover miscellaneous voids in insulated substrates, including those filled with loose-fiber insulation.

B. Seal vertical joints in vapor retarders over framing by lapping no fewer than two studs.

1. Fasten vapor retarders to wood framing at top, end, and bottom edges; at perimeter of wall openings; and at lap joints.

2. Seal overlapping joints in vapor retarders with vapor-retarder tape according to vapor-retarder manufacturer's written instructions. Seal butt joints with vapor-retarder tape. Locate all joints over framing members or other solid substrates.

3. Firmly attach vapor retarders to metal framing and solid substrates with vapor-retarder fasteners as recommended by vapor-retarder manufacturer.

C. Seal joints caused by pipes, conduits, electrical boxes, and similar items penetrating vapor retarders with vapor-retarder tape to create an airtight seal between penetrating objects and vapor retarders.

D. Repair tears or punctures in vapor retarders immediately before concealment by other work. Cover with vapor-retarder tape or another layer of vapor retarders.

END OF SECTION 072100

SECTION 221115 – WATER SYSTEM CLEANING, TESTING AND DISINFECTION

1.1 SECTION REQUIREMENTS

A. System pressure test, water line cleaning, and disinfection.

1.2 REFERENCES

A. AWWA C651 – Disinfection of Water Mains latest edition.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Disinfectant shall be free chlorine, liquid, or powder and shall be State of Michigan or

NFS approved for use in potable water supply systems.

PART 3 - EXECUTION

3.1 SYSTEM PRESSURE TEST

A. Furnish gauges and measuring devices, pump, pipe connections, and all other necessary apparatus for leakage tests.

B. Test from the existing meter location or from another location, as approved by the

COR, existing lines first. Then test with all new lines connected. Verify additional leakage detected is within the limits specified below.

C. Provide for system testing as follows:

1. Fill water lines with water until all air is exhausted.

2. Raise pressure to 1 ½ times the working pressure (at no time will the pressure exceed the rated pressure of the pipe or fittings) by means of pumping from a container.

3. Refill Container and maintain pressure for two hours.

4. Measure water required to refill container to initial level.

D. Leakage in excess of 10 gallons per inch of pipe diameter per mile of pipe per 24 hours shall be repaired.

E. Leakage shall be defined as the quantity of water that must be supplied into the newly laid pipe, or any valved section, to maintain the specified leakage test pressure after the pipe has been filled with water and the air in the water line has been expelled.

3.2 PIPE LINE CLEANING

A. Thoroughly clean all new pipes by flushing with water to remove all dirt, stones, debris, etc, which may have entered during the construction.

B. Flush pipes at a rate of not less than 2.5 feet per second.

3.3 DISINFECTION

A. Sterilize each unit of completed water distribution system before it is placed into operation.

B. Comply with AWWA C651 sterilization procedure.

C. Continuous feed method: Apply a chlorine dosage of not less than 50 milligrams per liter or more than 100 milligrams per liter.

1. Quantity of sodium hypochlorite solution (15-18%) required to make a 1% solution in water is 3 1/3 gallons per 50 gallons.

2. Quantity of HTH granular (65%) required to make a 1% solution in water – 6 ½ lbs per 50 gal.

D. The Contractor shall take representative samples of the water in those lines to be placed in service and have an approved laboratory make the bacteriological examinations of the samples to establish acceptability of that portion of water line to be placed into service.

E. Disinfection water will not be discharge to any surface water and shall be directed to an area that is relatively free from vegetation.

3.4 FLUSHING CHLORINATED WATER OUT AND WATER QUALITY TESTING

A. Completely flush the highly chlorinated water out of the water line. Fill with drinking water and test to ensure chlorine concentrations are in the normal range.

B. Test to verify bacteriological samples are negative.

END OF SECTION 311100

SECTION 221223 - POTABLE-WATER STORAGE TANKS

1.1 SUMMARY

A. This Section includes the following:

1. Steel, precharged, diaphragm, pressure, potable-water storage tanks.

1.2 SUBMITTALS

A. Product Data: For each type of potable-water storage tank indicated.

1.3 QUALITY ASSURANCE

A. Comply with NSF 61, "Drinking Water System Components--Health Effects, Sections 1 to 9," for potable-water storage tanks. Include appropriate NSF marking.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. In other Part 2 articles where titles below introduce lists, the following requirements apply to product selection:

1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, manufacturers specified.

2.2 STEEL, PRECHARGED, DIAPHRAGM, PRESSURE, POTABLE-WATER

STORAGE TANKS

A. Manufacturers:

1. AMTROL, Inc.

2. Armstrong Pumps, Inc.

3. Flexcon Industries; Plumbing & Heating Division.

4. Myers, F. E..

5. Smith, A. O.; Aqua-Air Div.

B. The three hydro-pneumatic tanks shall be each as follows, or equal:

1. “AMTROL Model WX-350-TKP” or equal – 119 gallon.

C. Description: Steel, vertical, pressured-rated tank with cylindrical sidewalls and with air-charging valve and air precharge.

D. Operation: Factory-installed, butyl-rubber diaphragm.

E. Construction: Steel, constructed with nontoxic welded joints, for 150-psig working pressure.

F. Tappings: Factory-fabricated steel, welded to tank.

1. NPS 2 and Smaller: ASME B1.20.1, with female thread.

2. NPS 2-1/2 and Larger: ASME B16.5, flanged.

G. Vertical Tank Supports: Factory-fabricated steel legs or steel skirt, welded to tank.

Provide solid concrete blocking, as necessary to provide positive drainage to drain spigot.

H. Tank Interior Finish: Materials and thicknesses complying with NSF 61 barrier materials for potable-water tank linings. Extend finish into and through tank fittings and outlets.

I. Exterior Coating: Extra tough enamel exterior coating.

2.3 SOURCE QUALITY CONTROL

A. Test and inspect potable-water storage tanks according to the following tests and inspections and prepare test reports:

1. Pressure Testing for Non-ASME-Code, Pressure, Potable-Water Storage Tanks:

Hydrostatically test to ensure structural integrity and freedom from leaks at pressure of 50 psig above system operating pressure, but not less than 100 psig.

Fill tanks with water, vent air, pressurize tanks, disconnect test equipment, hold pressure for two hours with no drop in pressure, and check for leaks. Repair or replace tanks that fail test with new tanks and repeat until test is satisfactory.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install water storage tanks on concrete bases, level and plumb, firmly anchored.

Arrange so devices needing servicing are accessible.

B. Anchor tank supports and tanks to substrate.

3.2 CONNECTIONS

A. Piping installation requirements are specified in other Division 22 Sections. Drawings indicate general arrangement of piping, fittings, and specialties.

B. Install piping adjacent to potable-water storage tanks to allow service and maintenance.

C. Connect water piping to water storage tanks with unions or flanges and with shutoff valves. Connect tank drains with shutoff valves and discharge over closest floor drains.

1. Valves are specified in Specification 221114, Water Distribution.

a. Valves NPS 2 and Smaller: Gate or ball.

2. Water Piping Connections: Make connections to dissimilar metals with dielectric fittings. Dielectric fittings are specified in Division 22 Section "Common Work

Results for Plumbing."

3.3 FIELD QUALITY CONTROL

A. Perform the following final checks before filling:

1. Verify that air precharge in precharged tanks is correct and each tank is within

0.1 psi of the correct pressure.

2. Test operation of tank accessories and devices.

3. Verify that pressure relief valves have correct setting.

a. Manually operate pressure relief valves.

b. Adjust pressure settings.

4. Verify that vacuum relief valves are correct size.

a. Manually operate vacuum relief valves.

b. Adjust vacuum settings.

B. Filling Procedures: Follow manufacturer's written procedures. Fill tanks with water to operating level.

3.4 CLEANING

A. Clean and disinfect potable-water storage tanks.

B. Use purging and disinfecting procedure described in AWWA C652.

END OF SECTION 221223

SECTION 260500- BASIC ELECTRICAL MATERIALS AND METHODS

1.1 Disconnect existing site electrical and reinstall, as may be necessary to rehabilitate the well house and accommodate the required water system and appurtenances.

1.2 Provide electric service to new submersible pump.

1.3 Provide a pump heater.

1.4 All Work shall be done under permit from the State of Michigan.

PART 2 - PRODUCTS

2.1 DEVICES

A. Material: Cold-formed steel, with corrosion-resistant coating acceptable to authorities having jurisdiction.

B. Metal Items for Use Outdoors or in Damp Locations: Hot-dip galvanized steel.

2.2 CONDUCTORS

A. All conductors shall conform to the requirements of the NEC for size, type, and outer covering.

B. All underground conductors shall be USE or UF moisture resistant.

2.3 PUMP HOUSE HEATER

A. Shall be 1,000 watt thermostat controlled, wall hung electric fan forced wall heater.

Unit shall be UL approved. It shall be hard wired to the existing electric panel. On/off shall be controlled by an adjustable thermostat, capable of controls between 40 and 70 degrees Fahrenheit, as a minimum.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Materials and Components: Install level, plumb, and parallel and perpendicular to other building systems and components, unless otherwise indicated.

B. Equipment: Install to facilitate service, maintenance, and repair or replacement of components. Connect for ease of disconnecting, with minimum interference with other installations.

C. Install wall hung heater in conformance with the NEC and manufacturer’s requirements, with separation from flammable materials.

D. A continuous warning tape shall be buried directly above the electric cable at a minimum depth of 6-inches.

END OF SECTION 260500

SECTION 311000 - SITE CLEARING

1.1 SECTION REQUIREMENTS

A. Traffic: Minimize interference with occupied or used facilities during site-clearing operations.

B. The limits of clearing and grubbing shall be held to the minimum required to provide the underground utilities.

C. All routes must be approved by the Government prior to any clearing and grubbing operations.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION

3.1 PREPARATION

A. Protect site improvements to remain from damage. Restore damaged improvements to condition existing before start of site clearing.

3.2 SITE CLEARING

A. Remove obstructions, shrubs, grass, and other vegetation to permit installation of new construction.

B. Disposal of stumps and slash shall be done off Government property. All other debris and merchantable timber shall be disposed of off Government property. Burning waste materials on-site is not permitted.

END OF SECTION 311000

SECTION 312000 – EARTH MOVING

1.1 SECTION REQUIREMENTS

A. This section specifies excavation and backfill for utilities, including; excavation, trenching, , placing of backfill material, and disposal of unsuitable material.

B. Do not interrupt existing utilities serving facilities occupied by the Government.

Provide temporary utility services.

1.2 EXISTING UNDERGROUND UTILITIES

A. The locations of existing underground utilities Shown on the Drawings are approximate. The Contractor shall repair at his own expense any damaged underground utilities Shown on the Drawings, located by the Government, or those identified by the utility companies.

B. The Contractor shall contact local diggers hotline, for buried cable location identification, 48 hours before doing any excavating on site. The Contractor shall locate and mark all buried electric lines prior to excavation.

C. Repair at Government expense underground utilities not Shown on the Drawings or marked/located on the ground by the Contractors locater, and damaged by the

Contractor.

1.3 QUALITY ASSURANCE

A. Quality control is the responsibility of the Contractor. Any testing required to verify materials meet the specifications shall be conducted by an independent Testing Agency hired and paid for by the Contractor.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Backfill and Fill: Backfill material shall contain no frozen or organic material.

B. Select Backfill: Select Backfill shall meet the requirements of MDOT specification.

C. Drain Rock: Drain Rock shall consist of ½” diameter to 2 ½” diameter clean…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .