Cedar Creek Driveway Trail Bridge Replacement
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 1095068
- Agency
- Forest Service Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Sheridan, Wyoming 82801, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice seeks statements of capability for a firm fixed price contract to replace two trail bridges on the Bighorn National Forest in Wyoming. The work includes removing existing bridge structures, installing glulam stringer bridges with timber sills on geocell pads, placing aggregate surfacing and riprap, and completing all other work per the plans and specifications. The solicitation will be issued by the USDA Forest Service under NAICS code 237310 and will be a total small business set-aside conducted in accordance with FAR Part 15.
The anticipated value is between $250,000 and $500,000. The work involves replacing a 61-foot driveway trail bridge and a 40-foot Cedar Creek trail bridge. Responses to the forthcoming solicitation must be submitted within 15 days of posting to the contracting officer. Questions regarding Amendment 0002 are due by June 12, 2023. The pre-solicitation notice serves to notify potential offerors of the upcoming solicitation to replace the two trail bridges on the Bighorn National Forest in Wyoming.
Notice text
2 versions
Update #2 · Latest ·
Project Title: Cedar Creek and Driveway Trail Bridge Replacements, Bighorn National Forest (NF), Region 2, Wyoming.
Driveway Trail Bridge Description of Work-
The work for the Driveway trail bridge includes but is not limited to the removal of the existing bridge structure, the installation of a 61’ glulam stringer trail bridge with timber sill on geocell pad, aggregate surfacing, riprap placement and all other incidental items necessary to complete the project in accordance with plans and specifications.
Cedar Creek Trail Bridge Description of Work-
The work for the Cedar Creek trail bridge includes but is not limited to the removal of the existing bridge structure, the installation of a 40’ glulam stringer trail bridge with timber sill on geocell pad, an optional item for existing trail restoration and all other incidental items necessary to complete the project in accordance with plans and specifications.
Project Location -
Driveway Trail Bridge Location-
From Sheridan, Wyoming, head south on interstate 90 for approximately 31 miles to exit 56A towards Buffalo, Wyoming. Continue on this road for approximately 2 miles, then turn right onto US-16 West. In approximately 46 miles, turn right at the junction of NFSR #27. Travel on NFSR #27 for approximately 2 miles. From here, there is a native surface unimproved road for 0.3 miles to within approximately 100’ of the bridge site.
Trail Bridge coordinates: 44° 11' 40.20" N, -107° 14' 35.16" W
Cedar Creek Trail Bridge Location -
From Sheridan, Wyoming, head north on interstate 90 for approximately 11 miles to exit 9. Head westbound on US-14 for approximately 52 miles to the junction of NFSR #264 (Cedar Creek Rd.). NFSR #264’s approach is a narrow, steep, four-wheel drive road for the first 1.3 miles. At the location of Trail 055, the four-wheel drive road ends and the road becomes a trail for the next mile to the bridge site. For the remaining 1 mile, currently the trail conditions would not allow access for an ATV. There is an optional work item for the reconstruction of the 1 mile of trail to provide access to the bridge site with an ATV. It is anticipated that the bridge stringers and other materials will need to be delivered to the site using a helicopter.
Trail bridge coordinates: 44° 36' 16.88" N, -107° 39' 17.43" W.
Update #1 ·
Proposals are NOT being requested at this time. This is ONLY a pre-solicitation notice. The Solicitation will be posted at a later date.
The work consists of replacing of two trail bridges on the Bighorn National Forest located in the State of Wyoming. Work includes but is not limited to the removal of the existing bridge structure, the installation of a glulam stringers trail bridge with timber sill on geocell pad, aggregate surfacing, riprap placement and all other incidental items necessary to complete the project in accordance with plans and specifications.
Attachments
| File | Type | Posted |
|---|---|---|
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| Attachment 1 - Cedar Creek Bridge Plans.pdf | ||
| Attachment 5 - Wage Determination .pdf | ||
| Attachment 4 - Schedule of Items.pdf | ||
| Attachment 3 - Trail_Specifications.pdf | ||
| Attachment 2- Driveway Bridge Plans .pdf | ||
| Solicitation 1282B123R0045.pdf | ||
| Synopsis.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Cedar Creek Driveway Trail Bridge Replacement R2 WY | Award Notice | |
| Cedar Creek Driveway Trail Bridge Replacement R2 WY | Solicitation | |
| Cedar Creek Driveway Trail Bridge Replacement | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity