Cedar Creek Driveway Trail Bridge Replacement Federal contract opportunity
Solicitation number
1095068
Issued by
Department of Agriculture Forest Service

About this file

This document contains a schedule of items for a federal construction contract to replace two trail bridges on the Bighorn National Forest in Wyoming. The contract involves replacing a 61-foot driveway trail bridge and a 40-foot Cedar Creek trail bridge. Work includes removing existing structures, installing glulam stringer bridges with timber sill substructures, aggregate surfacing, riprap placement, and restoring an existing trail. Optional items include restoring 5280 linear feet of an existing trail. Pricing is provided for various contract line items such as mobilization, aggregate surfacing, riprap installation, bridge construction, substructure work, and removal of existing structures. The total base price for the driveway trail bridge is listed as $XX,XXX and for the Cedar Creek trail bridge as $XX,XXX, with an additional optional item for trail restoration priced at $XX,XXX. The solicitation number is 1095068 and is being issued by the USDA Forest Service.

View the file

Other files for this federal contract opportunity

Other files attached to Cedar Creek Driveway Trail Bridge Replacement, newest first.
File Type Posted
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Attachment 2- Driveway Bridge Plans .pdf PDF
Solicitation 1282B123R0045.pdf PDF
Attachment 3 - Trail_Specifications.pdf PDF
Attachment 1 - Cedar Creek Bridge Plans.pdf PDF
Attachment 5 - Wage Determination .pdf PDF
Synopsis.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I - SCHEDULE OF ITEMS

SECTION B – SERVICES AND PRICES

BIGHORN TRAIL BRIDGE REPLACEMENTS

DRIVEWAY AND CEDAR CREEK TRAIL BRIDGE

WYOMING

BIG HORN COUNTY

BIGHORN NATIONAL FOREST

POWDER RIVER RANGER DISTRICT

B- 1 - SCHEDULE OF ITEMS – DRIVEWAY TRAIL BRIDGE

BASE ITEMS

Trail Bridge Improvements (Driveway)

Item No Description

Method of Meas. Unit Qty.

Unit Price Total

907(01) Mobilization L.S.Q. L.S. 1 $ $

913(02) Aggregate surfacing, Grading 1" minus, Compaction B D.Q. C.Y. 15 $ $

913(22) Riprap D.Q. C.Y. 55 $ $

963(02) Glulam Stringer Trail Bridge, Length 61' L.S.Q. L.S. 1 $ $

965(02) Trail Bridge Substructure, Type Timber Sill on Geocell Pad L.S.Q. L.S. 1 $ $

963(01) Removal of Structures and Obstructions L.S.Q. L.S. 1 $ $ Total: $

B- 1 - SCHEDULE OF ITEMS – CEDAR CREEK TRAIL BRIDGE

BASE ITEMS

GAOA - Trail Bridge Improvements (Cedar Creek)

Item No Description

Meth of

Meas Unit Qty. Unit Price Total

907(01) Mobilization L.S.Q. L.S. 1 $ $

963(02) Glulam Stringer Trail Bridge, Length 40' L.S.Q. L.S. 1 $ $

965(02) Trail Bridge Substructure, Type Timber Sill on Geocell Pad L.S.Q. L.S. 1 $ $

983(01) Removal of Structures and Obstructions L.S.Q. L.S. 1 $ $

Total: $ $

Attachment 4

OPTIONAL ITEMS – CEDAR CREEK TRAIL BRIDGE

Item No

Description

Meth of

Meas

Unit

Qty.

Unit Price

Total

911(06) Existing Trail Restoration (Trail 056) D.Q. L.F. 5280

Total: $ $

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.

Payment will be made on actual work performed as described in the Project Notes.