CA HBP TRI CR104(1), Trinity County Bridges Design Build

Award Notice Posted

Solicitation number
DTFH6816R00005
Agency
Awarded
to D N B Infrastructure, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
DTFH6817C00003 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Trinity County near Weaverville, CA Weaverville, California 96093, United States

Notice details come from SAM.gov. Updated .

Notice text

 THIS IS NOT A ADVERTISEMENT.  THIS PRESOLICITATION SERVES AS NOTICE THAT A ADVERTISEMENT IS IMMINENT IN THE NEXT FEW WEEKS.   

This project is for Design-Build services for the design, demolition, and construction of five bridges in Trinity County, CA. The existing structures are single span, with lengths ranging from approximately 37 feet to 60 feet and widths ranging from approximately 13 feet to 17 feet. The bridges are separated geographically from each other with nearly 100-miles between the most southern site to the most northern sites. All five locations are on rural, mountainous roads.


 


 



Bridge ID



Road Name



Waterway



Approximate Latitude/Longitude



5C-048



Coffee Creek Road



Coffee Creek



41d07'06"N 122d53'40"W



5C-061



Ramshorn Road



Mumbo Creek



41d08'16"N 122d34'11"W



5C-157



East Fork Hayfork Road



North Fork East Fork Hayfork Creek



40d30'35"N 122d59'58"W



5C-187



Jordan Road



Little Creek



40d37'33"N 122d57'38"W



5C-196



Coffee Creek Road



Adams Creek



41d07'19"N 122d55'25"W



 


The Design-Build contract would be for professional engineering, right-of-way acquisition, utility relocation, permitting (Clean Water Act Sections 401, 402, and 404; Encroachment Permits; etc), and construction services.


 


The proposed structures are to:


•·         Be open bottom; and


•·         Span the waterways and convey the design-year storm event;


 


Four structures are to be single lane. One is to be double lane (one lane in each direction).


 


Up to 400 feet of roadway approach work is anticipated on either side of each structure. This work may include excavation, embankment, placing aggregate surface, and some minor asphalt pavement.


 


ENGINEER'S ESTIMATE: 


The design, construction, and Right-of-Way/access costs for the Project is estimated to be between $4,000,000 and $6,000,000.


 


SCHEDULE: 


The Design-Build solicitation will be done in two phases. A Request for Qualifications is anticipated to be available in April 2016.


 


An optional site visit will be held during Phase 1 to allow proposers to view all accessible bridge sites. Based on current snow pack, only the Mumbo Creek bridge is inaccessible, however conditions may change. Interested parties will meet at the Little Creek Bridge at 8 A.M. on April 20, 2016.  Each Proposer will provide their own transportation to review the sites, which is anticipated to take nearly 10 hours to complete, and include nearly 230 miles of driving in potentially inclement weather. Four-wheel drive capable vehicles required. Due to limited space at the project sites, each proposer team should consolidate into one vehicle. Questions will be addressed at each of the bridge sites, however there will be no summary of the site visit for those who do not participate.


 


At least three firms will be short-listed. A Request-for-Proposals will be sent to the short-listed firms in or around June 2016. Award of contract is anticipated to be in or around August to October 2016. Completion of the Design-Build contract (engineering, right-of-way acquisition, permitting, and construction) is anticipated to be in 2017.


 

Files

File Type Posted
A001.pdf PDF
Site_Visit_Sign_In_Sheet.pdf PDF
2016_0420_trinity_Meeting_minutes.pdf PDF
CA_HBP_TRI_CR104(1)_RFQ.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity