Amendment A001 increases the Stipend to 80 000.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site_Visit_Sign_In_Sheet.pdf | ||
| 2016_0420_trinity_Meeting_minutes.pdf | ||
| CA_HBP_TRI_CR104(1)_RFQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
D. OTHER (Specify type of modification and authority)
E. IMPORTANT:
Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force a nd effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
PREVIOUS EDITION UNUSABLE STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
( ) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.)
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
1 3
A001 5/5/2016 CA HBP TRI 104
6905001
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENU, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: Jeremiah Rogers
DTFH6816R00005
4/14/2016
0*
* See Below
RFQ
Remove page 6 and replace with new page 6. The stipend has been increased to $80,000.
DRAFT RFP
Remove page A-13 of the RFP and replace with new page A-13. The stipend has been increased to $80,000.
NOTE: When printing revised sheets, turn on 'Document and Markups' in the Print Properties menu to illustrate changes on hard copy print.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO SF-1442, PAGE A-2, OF THE SOLICITATION)
Phase 2 – Request for Proposals
The short-listed D-B firms/teams will be sent an RFP, which will outline the remainder of the selection process requirements. The RFP will contain the requirements necessary for the short-listed D-B firms/teams to submit both a Technical Proposal and a Price Proposal.
To promote innovation by the Offerors and to maintain flexibility of design and construction, CFLHD will allow submission of Alternate Technical Concepts (ATCs) in Phase 2.
After receipt of the Phase 2 Technical Proposal and Price Proposal, an Evaluation Board will conduct a "best value" analysis. Attachment 5 contains the criteria to be used in the Phase 2 evaluation process. The Evaluation Board will submit their recommendation to the Source Selection Authority. Award of one firm fixed price contract is anticipated.
Each Offeror that submits a technically acceptable, but unsuccessful, Proposal will be entitled to receive payment for work products submitted with its Proposal. A proposal is deemed technically acceptable if it complies with all RFP requirements and contains no deficiencies as defined by FAR 15.001. The amount of the stipend payment will be $50,000 $80,000.00.
Amendment A001 5/5/2016
A-13 flexibility in the procurement process. ATCs are evaluated for approval or denial by CFLHD within the deadline set forth in the Procurement Schedule. In order to be approved, an ATC must be deemed, in CFLHD’s sole discretion, to provide a Project that is “equal or better” on an overall basis than the Project would be without the proposed ATC. Concepts that simply delete scope, lower performance requirements, lower standards, conflict with environmental commitments, or reduce contract requirements are not acceptable as ATCs. CFLHD reserves the right in its sole discretion to reject any ATC. No ATC shall be included in the proposal unless approved by CFLHD in writing prior to the proposal submission deadline.
Proposal Discussions (if deemed necessary) By issuing this RFP, it is the intent of the Government to award this contract without discussions.
Based upon Initial Technical Ratings and Initial Price Proposals, CFLHD will make a decision whether to enter into a contract award or begin discussions with all Offerors within the competitive range. In the event it is not feasible for CFLHD to make award on the basis of the Initial Price and Technical Proposals, discussions with Offerors will be conducted in accordance with FAR 15.306 (d).
Offerors would be provided a reasonable opportunity to submit any price, technical or other revisions to their Proposal that may result from discussions, if they occur. Discussions shall not be used to provide details of other proposals to the Offerors.
Final Proposal Submittal (if deemed necessary) If discussions are held, at the conclusion of discussions, each offeror will be allowed to submit a final proposal at a date to be specified during discussions. All other submittal requirements will be the same as the initial proposal requirements.
Award The Proposal offering the Best Value Project to the Government will be forwarded by the Evaluation Board to the Source Selection Authority (Contracting Officer) for consideration and action. All Offerors submitting Proposals will be notified in writing of the results of the evaluation process.
Offerors not selected for award may request a debriefing as described below.
Stipend Each Offeror that submits a technically acceptable, but unsuccessful, Proposal will be entitled to receive payment for work products submitted with its Proposal. A proposal is deemed technically acceptable if it complies with all RFP requirements and contains no deficiencies as defined by FAR 15.001. CFLHD will provide payment on the terms and conditions described herein. The amount of the stipend payment will be $50,000 $80,000.00.
If award of the design/build contract is made, payment of the stipend will be made within 30 days of receipt of a written invoice for the stipend amount from the unsuccessful Offeror. No stipend will be paid if (i) no technically acceptable Proposals are received, (ii) Proposals are received, but no award is made, or (iii) the procurement is cancelled prior to the Proposal Due Date.
Each Offeror that elects to receive the stipend grants to the Government, and others acting on its behalf, a paid-up, non-exclusive, irrevocable, worldwide license in its proposal to reproduce, prepare derivative works, distribute copies to the public, and perform publicly and display publicly by or on behalf of the Government.
Amendment A001 5/5/2016