C-5 main landing gear trunninon bearings
Closed Pre-Solicitation Posted
- Solicitation number
- FA8538-19-R-0013
- Agency
-
AFLCMC Robins AFB
Lifecycle Management Center, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
EXTENDED RESPONSE DATE TO JULY 2, 2019
This requirement is for a competitive Firm-Fixed Price/Indefinite Delivery Indefinite Quantity (IDIQ) for a 2 year contract with the already qualified source and a 3 year contract with the proven qualified source.
The projected period of performance for this requirement will be a basic year with four one year option periods for a total of five (5) years. The best estimated quantities range from forty-eight (48) per year to fifty-six (56) per year for a planned five-year contract period of performance starting 24 Sept. 2019 (for FY20-FY24). A Mission Essential Quantity (MEQ) will be awarded to the already qualified source for the first 2 years of the contract.
The Government will utilize Delivery Protection Program (DPP) competitive procedures. This requirement will be a competitive effort with DPP terms. The proven source is the successful overall best offeror and the Government will award on ID/IQ type contract with the Mission Essential Quantity (MEQ) for the first 2 years to the proven source. If an unproven source is the lowest offeror, the Government will award one ID/IQ type contract with the first article requirements and out-year option years to the unproven source.
Option 1 (MEQ)-proven source 48
Option 2 (MEQ)-proven source 48
Pre-Production-unproven source2/2
Production Option (BEQ) 48
Out Year Option1 (BEQ) 56
Out Year Option2 (BEQ) 48
This is a requirement for depot-level remanufacturing effort for the item listed below. This item is the main pivot bearing used during the retraction and extension of the C-5 Main Landing Gear (MLG). This is a safety critical item, failure of which could cause the loss of aircraft and crew. The anticipated remanufacturing service will provide serviceable assets to meet quarterly demand for Air Force Field Level requirements and C-5 Programmed Depot Maintenance (PDM). The C-5 MLG Trunnion bearings will support C-5 aircraft until 2040.
The purpose of this requirement is to provide for the remanufacture and assembling of the C-5 Main Landing Gear Trunnion Bearings. Main Landing Gear Trunnion Bearings part number 4F23832-103A is for the installation onto the C-5 aircraft. The best estimated quantities range from forty-eight (48) per year to fifty-six (56) per year for a planned five-year contract period of performance starting 24 Sept. 2019 (for FY20-FY24)
.
Update #1 ·
This requirement is for a competitive Firm-Fixed Price/Indefinite Delivery Indefinite Quantity (IDIQ) for a 2 year contract with the already qualified source and a 3 year contract with the proven qualified source.
The projected period of performance for this requirement will be a basic year with four one year option periods for a total of five (5) years. The best estimated quantities range from forty-eight (48) per year to fifty-six (56) per year for a planned five-year contract period of performance starting 24 Sept. 2019 (for FY20-FY24). A Mission Essential Quantity (MEQ) will be awarded to the already qualified source for the first 2 years of the contract.
The Government will utilize Delivery Protection Program (DPP) competitive procedures. This requirement will be a competitive effort with DPP terms. The proven source is the successful overall best offeror and the Government will award on ID/IQ type contract with the Mission Essential Quantity (MEQ) for the first 2 years to the proven source. If an unproven source is the lowest offeror, the Government will award one ID/IQ type contract with the first article requirements and out-year option years to the unproven source.
Option 1 (MEQ)-proven source 48
Option 2 (MEQ)-proven source 48
Pre-Production-unproven source2/2
Production Option (BEQ) 48
Out Year Option1 (BEQ) 56
Out Year Option2 (BEQ) 48
This is a requirement for depot-level remanufacturing effort for the item listed below. This item is the main pivot bearing used during the retraction and extension of the C-5 Main Landing Gear (MLG). This is a safety critical item, failure of which could cause the loss of aircraft and crew. The anticipated remanufacturing service will provide serviceable assets to meet quarterly demand for Air Force Field Level requirements and C-5 Programmed Depot Maintenance (PDM). The C-5 MLG Trunnion bearings will support C-5 aircraft until 2040.
The purpose of this requirement is to provide for the remanufacture and assembling of the C-5 Main Landing Gear Trunnion Bearings. Main Landing Gear Trunnion Bearings part number 4F23832-103A is for the installation onto the C-5 aircraft. The best estimated quantities range from forty-eight (48) per year to fifty-six (56) per year for a planned five-year contract period of performance starting 24 Sept. 2019 (for FY20-FY24)
.
Files
| File | Type | Posted |
|---|---|---|
| FA853819R0013.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity