Brush Creek Hayden Sewer/Water Line Project
Award Notice Posted
- Solicitation number
- 12850818R0003
- Agency
-
Region 2 - Rocky Mountain Region
Forest Service, Department of Agriculture
- Awarded
- to Trinity Of Utah Incorporated
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- 12850818C0008 Federal contract award
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- PSC
- Not on record
- Place of performance
- 2171 Highway 130 Saratoga, Wyoming 82331, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
The Forest Service intends to post the solicitation on or after April 6, 2018 from the previously stated March 30, 2018. The Forest Service is currently reviewing questions and project details to provide answers. The solicitation will be posted once those questions have been answered.
A proper close date and time will be posted with the solicitation. At this time no bids will be accepted for this project under pre-solicitation.
SOLICITATION DOCUMENTATION WILL BE POSTED ON OR AFTER APRIL 6, 2018.
Update #2 ·
**PLEASE READ: THIS IS A PRE-SOLICITATION NOTICE. NO OTHER INFORMATION IS AVAILABLE UNTIL THE SOLICITATION IS ISSUED ON THE DATE IDENTIFIED BELOW**
This is a new project for construction services for the Brush Creek/Hayden Ranger District located on the Medicine Bow-Routt National Forest and Thunder Basin National Grassland (MBRTB). The purpose of this contract is to perform sewer and water line construction work at the Brush Creek/Hayden Ranger District compound located in Saratoga, Wyoming. The work shall consist of all necessary labor, supervision, equipment, tools, and materials to connect the District compound to the Town of Saratoga's municipal utilities.
The sanitary sewer construction will require the installation of a duplex grinder pump lift station, and the construction of approximately 160 lineal feet of 1 ¼" sanitary sewer force main, 210 lineal feet of 4" gravity sanitary sewer, and 980 lineal feet of 6" gravity sanitary sewer from the existing Town of Saratoga 8" gravity sanitary sewer. The existing onsite wastewater disposal system will be abandoned in accordance with WYDEQ regulations once the new sanitary sewer is connected to the Town of Saratoga.
In addition, the project includes construction of approximately 630 lineal feet of 12" water main, 710 lineal feet of 8" water main, 760 lineal feet of 4" fire service line, and 760 lineal feet of 1-1/2" domestic services to three buildings onsite, three fire hydrants, and all taps, valves, meters, fittings, thrust blocks, and other appurtenances to connect the Forest Service site to the Town of Saratoga's water distribution system.
All work shall adhere to industry standards, local building code requirements, and manufacturer installation recommendations.
General specifications for all End Result type work listed in the Schedule of Items are included in this original solicitation as attachment Project Manual Construction Documentation version 06/12/2017 and Municipal Water & Sewer Construction Plan.
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
Location of Project:
2171 Highway 130
PO Box 249
Saratoga, WY 82331
Latitude 41.437808° Longitude -106.803759°
Contract Time: 180 calendars days, starting on or about June 1, 2018
Contract magnitude of this contract is between $250,000 to $500,000.
Pre Bid Conference is not mandatory for prime contractor or contract representative but is recommended as there will be site walk through.
Conference is currently scheduled for 21 March 2018 @ 10:00 am Mountain Time at the following location:
Brush Creek Hayden Ranger District
2171 S Wyoming 130
Saratoga, WY 82331
Please RSVP with Jacob Brown at jacobwbrown@fs.fed.us
Bonds: A Bid guarantee is NOT required with the offer.
Offers must be able to bond for estimated amount of $500,000. Offeror shall submit proof of bonding capabilities (signed and stamped letter from bonding agent). Letter shall state contractor's bonding levels. Contractors unable to bond for $500,000 amount will be eliminated from competition. If awarded, the performance and payment bonds are to be 100% of the award amount.
Refer to FAR 28.102-2. This guidance is in accordance with FAR 52.228-1.
North American Industrial Classification (NAICS) Code applicable to this acquisition is 237110, Water and Sewer Line and Related Structure Construction.
Small Business Size Standard for this acquisition is $36.50 million
THIS IS A TOTAL SMALL BUSINESS SET ASIDE
SOLICITATION DOCUMENTATION WILL BE POSTED ON OR ABOUT March 26, 2018.
Update #1 ·
**PLEASE READ: THIS IS A PRE-SOLICITATION NOTICE. NO OTHER INFORMATION IS AVAILABLE UNTIL THE SOLICITATION IS ISSUED ON THE DATE IDENTIFIED BELOW**
This is a new project for construction services for the Brush Creek/Hayden Ranger District located on the Medicine Bow-Routt National Forest and Thunder Basin National Grassland (MBRTB). The purpose of this contract is to perform sewer and water line construction work at the Brush Creek/Hayden Ranger District compound located in Saratoga, Wyoming. The work shall consist of all necessary labor, supervision, equipment, tools, and materials to connect the District compound to the Town of Saratoga's municipal utilities.
The sanitary sewer construction will require the installation of a duplex grinder pump lift station, and the construction of approximately 160 lineal feet of 1 ¼" sanitary sewer force main, 210 lineal feet of 4" gravity sanitary sewer, and 980 lineal feet of 6" gravity sanitary sewer from the existing Town of Saratoga 8" gravity sanitary sewer. The existing onsite wastewater disposal system will be abandoned in accordance with WYDEQ regulations once the new sanitary sewer is connected to the Town of Saratoga.
In addition, the project includes construction of approximately 630 lineal feet of 12" water main, 710 lineal feet of 8" water main, 760 lineal feet of 4" fire service line, and 760 lineal feet of 1-1/2" domestic services to three buildings onsite, three fire hydrants, and all taps, valves, meters, fittings, thrust blocks, and other appurtenances to connect the Forest Service site to the Town of Saratoga's water distribution system.
All work shall adhere to industry standards, local building code requirements, and manufacturer installation recommendations.
General specifications for all End Result type work listed in the Schedule of Items are included in this original solicitation as attachment Project Manual Construction Documentation version 06/12/2017 and Municipal Water & Sewer Construction Plan.
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
Location of Project:
2171 Highway 130
PO Box 249
Saratoga, WY 82331
Latitude 41.437808° Longitude -106.803759°
Contract Time: 180 calendars days, starting on or about June 1, 2018
Contract magnitude of this contract is between $250,000 to $500,000.
Pre Bid Conference is not mandatory for prime contractor or contract representative but is recommended as there will be site walk through.
Conference is currently scheduled for 21 March 2018 @ 10:00 am Mountain Time at the following location:
Brush Creek Hayden Ranger District
2171 S Wyoming 130
Saratoga, WY 82331
Please RSVP with Jacob Brown at jacobwbrown@fs.fed.us
Bonds: A Bid guarantee is NOT required with the offer.
Offers must be able to bond for estimated amount of $500,000. Offeror shall submit proof of bonding capabilities (signed and stamped letter from bonding agent). Letter shall state contractor's bonding levels. Contractors unable to bond for $500,000 amount will be eliminated from competition. If awarded, the performance and payment bonds are to be 100% of the award amount.
Refer to FAR 28.102-2. This guidance is in accordance with FAR 52.228-1.
North American Industrial Classification (NAICS) Code applicable to this acquisition is 237110, Water and Sewer Line and Related Structure Construction.
Small Business Size Standard for this acquisition is $36.50 million
THIS IS A TOTAL SMALL BUSINESS SET ASIDE
SOLICITATION DOCUMENTATION WILL BE POSTED ON OR ABOUT FEBRUARY 26, 2018.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Brush Creek Hayden Sewer/Water Line Project | Award Notice | |
| This notice | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity