Bldg. 8027 Electrical 800 amp Upgrade to the Multi-Purpose Chamber
Award Notice Posted
- Solicitation number
- 17-233-SOL-00793
- Agency
-
Program Support Center
Department of Health and Human Services
- Awarded
- to Maden TECH Consulting, Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- HHSP233201750137A Federal contract award
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- PSC
- Not on record
- Place of performance
- Dugway Proving Ground Dugway, Utah 84022, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Added: Aug 29, 2017 9:33 am
Amendment Three:
Questions and Answers:
Statement of Objectives, Paragraph 2.14.2.2: "How will the reimbursement for periodic Warranty Walks, which are conducted during the 1-year warranty period reimbursed? Should be in included in the pricing and please identify as such. The Contract is firm-fixed price.
Warranty walks, at least one, should be included as part of the fixed price along with a proposed reimbursement schedule.
Should the cost be included in the fixed price? Yes.
Also, just a clarification question:
"Is the Contractor's Statement of Work called for in the Solicitation Instructions to Volume I Technical Volume the same as the Description of our Technical Approach and Capability to Satisfy the Statement of Objectives listed under c.
Please treat the CSOW as a separate entity but a part of your technical volume. The CSOW is a part of theVolume I. The Technical approach and Capabilities is separate but a part of Volume one also.
THE CSOW will be encompassed into the contract.
Evaluation Criteria (2) Factor 1 For Technical Key Factors 2 ? All technical is encompassing to include the CSOW.
Update #2 ·
Added: Aug 24, 2017 8:25 pm
ANSWERS AND QUESTION AS OF AUGUST 24 2017
Answers below:
1. SOO 3.2.2 lists the quantity and amperage of the new breakers to be add. Are these breakers all 3 pole or are some of the 2 pole or 1 pole?
Ans: 5-20 Amp (1 P), 2- 100 Amp (3P), 2- 60 Amp (3P), 2-30 Amp (3P)
2. The new receptacles and plugs to be added are to be Hubbell weather tight type. The Hubbell weather tight receptacles are nylon material or a PBT thermoplastic depending on the model No. Are these materials acceptable and compatible with the area?
Ans: Plastic or PBT should be as long as they are Weather Tight
3. Are the existing 400A breakers to be used for the 150kva transformers a 400A circuit breaker or are they MCPs (Motor Circuit Protectors) with a 400A frame with an adjustable trip setting that has the proper adjustable range to protect the feeder cable and 150kva transformer?
General Electric 3P 250A, Mag adj 750-2500 A, 400A Max-600VAC Cat Frame TJK436F000.
Update #1 ·
Added: Aug 02, 2017 6:50 pm
Solicitation
Bldg. 8027 Electrical 800 amp Upgrade to the Multi-Purpose Chamber.
This is a solicitation for prepared with the format in as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested.
THIS ACQUISITION IS A 100% SMALL BUSINESS SET-ASIDE.
1.1 Project Title
Re-configure MPC electrical service and wall plugs.
1.2 Background
The West Desert Test Center (WDTC) has procured a new set of secondary test chambers that require 800 amp over exiting power. This project shall provide the necessary construction activities to re-route 400 AMP/408V from the facility electrical room to the MPC and configure a distribution system providing 400 Amps/208 V service to each side of the chamber.
1.3 Summary of Work
The Contractor, under this contract, shall use professional standards and practices when layout and installing upgraded electrical capability in the MPC.
SITE VISIT: A facility site visit will be held on 15 August 2017 09:00 a.m. Mountain Standard Time (MST). To participate, email the Contract Specialist no later than (NLT) 08 August 2017 / 12:00 p.m. MST and provide the names of the individuals (no more than two per contractor) that will be attending. Contact information is listed below under "Proposal Submission Information." Additional information for base access will be provided by the Contract Specialist when names are provided. All questions regarding this requirement are required to be submitted via email NLT 17 August 2017 / 4:00 p.m. MST to the Contract Specialist. Questions submitted after this date/time may not be considered by the Government.
The terms and conditions are standard for Government and Commercial customers:
- One year warranty for materials and installation services.
- The work performed by the contractor will not be accepted by the Government until SOW and contractual requirements have been met.
- Work shall begin within 10 working days of contract award and completed no later than TBA days after work commences.
Classification Data:
NAICS Code - 238210
Classification Code - 6110
SBA Size Standard - $15,000,000
Contractor is required to: (1) Sign page Standard Form 1442 page one of this document; (2) handwrite and/or type the offered dollar ($) amount next to CLIN 0001; all required documents to the address listed below under "Proposal Submission Information."
Proposal Submission Information:
Proposals are due by 22 August 2018, 12:00 p.m. (MST). The following individual is the Point of Contact (POC) for information regarding this solicitation:
Patricia Natividad
Contracts Specialist
Patricia.Natividad
Phone: (801)-524-3413
Files
| File | Type | Posted |
|---|---|---|
| MPC_Plugs-junction.jpg | JPG image | |
| MPC_Junction_piping.jpg | JPG image | |
| MPC_100-60-480_Amp_plugs.jpg | JPG image | |
| MTF_MPC_panel_mountg_plates.jpg | JPG image | |
| 17-233-SOL-00793_Amemdment_two_SOLICITATION_ELECTRICAL_UPGRADE.docx | DOCX document | |
| MPC_20_-30_AMP_right_plugs.jpg | JPG image | |
| MPC_20_Amp_plugs.jpg | JPG image | |
| Pictures_Electrical_Upgrade.pdf | ||
| MPC_30_Amp_plugs.jpg | JPG image | |
| MTF_Outside_pad_area.jpg | JPG image | |
| 17-233-SOL-00793_Amemdment_One_SOLICITATION_ELECTRICAL_UPGRADE.docx | DOCX document | |
| Version_2_SOO_MPC_Electrical_170614.docx | DOCX document | |
| 1442_Solicitation_17-233-SOL-00793.pdf | ||
| Past_Performance_Questionnaire_.doc | DOC document | |
| 2_of_2_17-233-SOL-00793_Statement_of__Objectives.docx | DOCX document | |
| IJO_Bldg_8027_MPC_800amps_upgrade.pdf | ||
| 17-233-SOL-00793_SOLICITATION_ELECTRICAL_UPGRADE.docx | DOCX document | |
| BLDG_MAP_E-0_E-1_E-2-BLDG_8027.pdf | ||
| Appendix_A_and_B_OO_B8027_MPC_Electrical_Upgrade.docx | DOCX document |
Show all 19
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity