Y25-113-KS_EXHIBIT_C-LIQUIDATED_DAMAGES.pdf

PDF 83 KB Posted

Attached to
Security Guard Services for Utilities
Solicitation number
Y25-113-KS
Issued by
Orange County, Orlando City, Florida

About this file

Exhibit C is a Liquidated Damages document for a Security Guard Services contract for Orange County, Florida, specifically for utility facilities. The document outlines specific performance standard violations and their corresponding financial penalties for the contracted security provider. The first violation involves unstaffed posts, with escalating fees ranging from $250 for up to three hours to $750 for absences exceeding eight hours. Additional violations include $250 penalties for failing to submit required documentation or complete mandatory retraining within prescribed timeframes.

The fee structure is designed to incentivize consistent performance and compliance with contract requirements. Each violation type carries a flat $250 fee, with the unmanned post violation having a tiered penalty structure that increases based on the duration of the security post being left unattended. The document indicates that performance standard violations are not limited solely to the referenced sections, suggesting potential flexibility in assessing damages beyond the explicitly listed scenarios.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT C

IDENTIFICATION AND ASSESSMENT OF LIQUIDATED DAMAGE

Performance Standard Violation (Note references provided below are for informational purposes only, Performance Standard Violations are not limited solely to referenced sections)

Fee Assessed

1 Should OCCD staff an unmanned post in the absence of the Contractor’s guard.

$250 per occurrence for three (3) hours or less;

$500 per occurrence exceeding three (3) hours but less than eight (8) hours. $750 per occurrence greater than eight (8) hours

2 Failure to submit any report, log, or documentation, with the proper content and format, in the timeframe required.

$250 per occurrence

3 Failure to have retraining reviewed and completed in accordance with the prescribed time (annually or every two years are most common).

$250 per occurrence

EXHIBIT C
IDENTIFICATION AND ASSESSMENT OF LIQUIDATED DAMAGE
Performance Standard Violation (Note references provided below are for informational purposes only, Performance Standard Violations are not limited solely to referenced sections)

File details come from the government source that posted it. Updated .