B5_-_Antenna_Maintenance_Questions_and_Answers.pdf
PDF 54 KB Posted
- Attached to
- Antenna Maintenance and Repair
- Solicitation number
- WX03723Y2018T
About this file
Antenna Maintenance Questions and Answers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B5_-_Antenna_Repair-Install_Scenario_sheet.pdf | ||
| A2_-_SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Antenna Maintenance Questions/Answers:
Q1.) Could you provide address for the six location?
A1.) Region 1 FRC:
63 Old Marlboro Rd, Building A, Maynard, MA 01754 Region IV FRC:
404 S. Pinetree Blvd. Thomasville, GA 31792 Region VI FRC:
800 North Loop 288, Denton, TX. 76201 Region VIII FRC:
Denver Federal Center, Building 710, Box 25267 Denver, CO 80225-0267
Region X FRC:
130 228th ST. SW, Bothell, WA. 98021
MWEOC:
19844 Blueridge Mt Road, Bluemont, VA. 20135
Q2.) Per the statement of work under section 1.0 Purpose: Other than the annual inspection, and preventative maintenance (PM). Is installing new antennas, moving antennas and repairs preform on a Time & Material (T&M) or is a fix cost proposal submitted per event?
A2.) Fixed Cost Proposal
Q3.) Can you provide OEM information on the existing antenna rotator systems?
A3.) United States Antenna Products, 5263 Agro Dr, Frederick, MD 21703
Q4.) Could you verify the number of towers for Inspection/PM is 8 each?
A4.) Yes 8ea
For Scenario 1
Q5.) Are just looking for step and procedure and not a price?
A5.) For all Scenarios we are looking for the technical approach and the price
For Scenario 2
Q6.) This section reference DRC-3 (Digital Rotator Controller) to be repair or replacement.
Further into the scope of work it speak of replacing motor, chain, and shear pins. Can you provide more detail if the scope of work include the rotator. If so how many rotators should we include into the proposal
A6.) The motor, chain, and shear pins are the rotator components. For the scenario we are only referring to 1. For the contract each antenna has a rotator (8)
Q7.) Can you provide the model of the existing DRC?
A7.) DRC-3
Q8.) How many Rotators will be connected to the new DRC-3?
A8.) 1ea
Q9.) Who will supply the new material?
A9.) Contractor
For Scenario 3
Q10.) Can you provide which FEMA location requires this work?
A10.) For the Scenario the location is Mount Weather
Q11.) Is the tower location crane accessible?
A11.) Yes
Q12.) Is there enough ground space at the tower location to perform the work on the antenna?
A12.) Yes
Q13.) Who supply the materials for the repair?
A13.) Contractor