This is a Construction Manager's Project Manual for the Woodland Elementary Asphalt & Landscaping project issued by Portage Public Schools in Michigan, managed by Owen-Ames-Kimball Co. The project encompasses asphalt paving, landscaping, and related site work at Woodland Elementary School located at 1401 Woodland Drive, Portage, Michigan. A pre-bid conference and site inspection is scheduled for July 15, 2026 at 10:00 AM at the project site. Sealed bids in triplicate are due by 2:00 PM local time on Wednesday, July 29, 2026, with public opening and reading of bids immediately following at the Portage Administration Building, 8107 Mustang Drive. Bids received by mail must arrive by 11:00 AM on July 29, 2026. Bidding documents are available for examination at the Owen-Ames-Kimball Co. website and at Builders Exchange plan rooms in Grand Rapids, Kalamazoo, Lansing, and Traverse City. The project is divided into 39 bid categories, with bid categories 02 (Asphalt Paving) and 03 (Landscaping) actively open for bidding, while the remaining categories have been previously awarded to various contractors.
Bids must be accompanied by a sworn and notarized Familial Disclosure Statement and an Affidavit of Compliance with Michigan's Iran Economic Sanctions Act. Bid security in the form of a certified check, cashier's check, or bid bond is required in an amount equal to five percent of the base bid. Contractors with contracts exceeding $50,000 must furnish separate Performance and Payment Bonds from a surety company rated A- or better for the full contract amount. Bidders must demonstrate at least five years of successful experience on similar work, hold required licenses, and possess adequate financial resources. Commercial General Liability insurance with ISO occurrence form CG 20 10 07 04 and CG 20 37 07 04 are required, naming Owen-Ames-Kimball Co., the Owner, and Architect as additional insureds on a primary and non-contributory basis. Bids are binding for sixty days from opening. Addenda will be issued no later than two days prior to the bid opening. All bidders must comply with Owen-Ames-Kimball Co.'s Safety Policy and Requirements, including provisions for hard hats, contractor safety manuals on-site, fall protection, substance abuse policies, and a prohibition on smoking or tobacco use on school property.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Advertisement to Bid Notice WOD.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Portage Public Schools
Woodland Elementary - Asphalt & Landscaping
CONSTRUCTION MANAGER’S
PROJECT MANUAL
July 8th, 2026
Construction Manager:
Owen-Ames-Kimball Co.
2700 Stadium Dr. Suite 2
Kalamazoo, MI 49008
Send RFIs and Substitution Requests to:
Anastasia Wojcik anastasiaw@oakmi.com
Portage Public Schools, Woodland Elementary– Asphalt & Landscaping www.owen-ames-kimball.com
Construction Management Project Manual Index
Bidding Requirements
Advertisement for Bids
Instruction to Bidders
Statement of Participation
Certificate of Insurance and Endorsement
Bid Form
Familial Disclosure Statement, Affidavit of Compliance
Safety Data Questionnaire
General Conditions
Specifications
Division 1 - General Requirements
01010 Summary of Work
01020 Allowances
01026 Unit Prices
01030 Schedule of Alternates
01040 Project Coordination
01045 Cutting and Patching of New Work
01050 Field Engineering
01095 Reference Standards and Definitions
01200 Project Meetings
01300 Submittals
01400 Quality Control
01500 Temporary Utilities
01600 Material and Equipment
01650 Starting Systems
01700 Contract Close Out
Construction Schedule
Subcontractor Submittal Form
Referenced Documents Available for Online Viewing
AIA A132 – 2019 – Standard Form of Agreement Between Owner and Contractor:
https://tinyurl.com/2p8pnk2b
Owen-Ames-Kimball Co. Safety Manual:
https://tinyurl.com/34zxyj49 https://tinyurl.com/2p8pnk2b
ADVERTISEMENT FOR BIDS
BID PROPOSAL
Sealed bids, in triplicate, for the Portage Public Schools, Woodland Elementary– Asphalt & Landscaping will be received until 2:00 pm local time, 8107 Mustang Drive, Portage, MI 49002 on Wednesday, July 29th, 2026. Bids received after this time will neither be considered nor accepted.
All proposals received by the time and date stated above will be opened and read publicly at 2:00 pm local time, Wednesday, July 29th, 2026 at the Portage Administration Building 8107 Mustang Drive, Portage, MI, 49002.
Bids may be mailed to O-A-K's Kalamazoo office 2700 Stadium Dr, Kalamazoo, MI 49008. Mailed bids must be received by 11:00am July 29th, 2026. FAXED, EMAILED OR UPLOADED TO BUILDING CONNECTED BIDS WILL NOT BE
ACCEPTED.
In accordance with Section 1267 of the Revised School Code each bid must be accompanied by a sworn and notarized Familial Disclosure Statement completed by the bidder disclosing any familial relationship between the
Owner or any employee of the Bidder and any member of the District’s Board of Education or the Superintendent of the District.
SITE INSPECTION
A construction pre-bid meeting will be held at 1401 Woodland Drive, Portage, MI 49024 at 10:00am local time, Wednesday, July 15th at 10:00am. All bidders are encouraged to attend.
BID DOCUMENTS
The Bidding Documents may be examined at the following locations:
• Owen-Ames-Kimball Co. Website: http://www.owen-ames-kimball.com/subcontractors/
• Builders Exchange plan rooms in Grand Rapids, Kalamazoo, Lansing and Traverse City.
BIDDER QUALIFICATIONS
Bidders submitting a Bid for this Project shall have qualifications as follows:
a. Shall be a reputable, recognized organization, with at least five (5) years successful experience on work of this type and scope of this project.
b. Shall have a license where required by public authorities having jurisdiction.
c. Shall have ample financial resources for work of this magnitude.
BID SECURITY - PERFORMANCE BONDS
Each bid shall be accompanied by good and sufficient bid security or bid bond in an amount not less than 5% of the
Bid amount and shall secure the Owner from loss or damage by reason of the withdrawal of the Bid by a Bidder or by failure of the successful Bidder to enter into a Contract with the Owner if his Bid is accepted by the Owner.
Bid securities will not be released or returned until the bid “hold-firm” date or a subcontract has been successfully executed for the specific bid category of work, whichever occurs first.
Bid security may be provided by furnishing a bond from a surety company having a rating of A- or better or certified check. Owen-Ames-Kimball is not responsible for the loss of bid security if provided by certified check.
The successful Bidder will be required to secure Performance, Labor and Material bonds for all contracts exceeding
$50,000, from a surety company having a rating of A- or better, for the full amount of the Contract.
http://www.owen-ames-kimball.com/subcontractors/
Portage Public Schools, Woodland Elementary – Asphalt & Landscaping - Page 1 of 32
SUPPLEMENT TO INSTRUCTIONS TO BIDDERS
STANDARD AIA FORMS
The Instructions to Bidders (AIA Document A701-2018 Edition), Articles 1 through 8, and as herein amended or added to, are a part of the Contract Documents, and shall apply to all Contractors, and/or Subcontractors.
ARTICLE 1 – DEFINITIONS Add Subparagraph 1.10 as follows:
1.10 All references made to Owner shall be implied to refer to the Construction Manager.
ARTICLE 3 – BIDDING DOCUMENTS
3.1 Distribution Add Subparagraph 3.1.6 as follows:
3.1.6 The Bidding Documents, including drawings, specifications, and necessary forms, can be examined at the following locations.
• Owen-Ames-Kimball Co. website: www.owen-ames-kimball.com/subcontractors/
• Builders Exchange plan rooms in Grand Rapids, Kalamazoo, Lansing, and Traverse City.
3.2 MODIFICATION OR INTERPRETATION OF BIDDING DOCUMENTS Revise Subparagraph 3.2.2. as follows:
Line 2 shall read “…ten days…”
ARTICLE 4 – BIDDING PROCEDURES
4.1 PREPARATION OF BIDS Revise Subparagraph 4.1.1. and Add Subparagraph 4.1.6.1, 4.1.9 and 4.1.10 as follows:
Bids shall be submitted, in triplicate, on the Bid Proposal Form included within the bidding Documents.
4.1.6.1 Proposals will be accepted for one (1) Bid Category only, or a combination of two (2) or more Categories. If the Bidders wish to have their combined bid considered for separate categories, they must submit separate proposals for the individual category along with their combined bid proposal.
4.1.9 A Pre-Bid Conference will be held in accordance with the following schedule:
Date: July 15th, 2026
Place: 1401 Woodland Drive, Portage, MI 49024
Time: 10:00 am
4.1.10 In accordance with Section 1267 of the Revised School Code each bid must be accompanied by a sworn and notarized Familial Disclosure Statement completed by the bidder disclosing any familial relationship between the Owner or any employee of the Bidder and any member of the District’s Board of Education or the
Superintendent of the District.
4.2 BID SECURITY Add Subparagraphs 4.2.1.1, 4.2.1.2 and Revise Subparagraph 4.2.3 as follows:
4.2.1.1 Bid security shall be required for each bid tendered.
4.2.1.2 Bid security shall be in the form of either a CERTIFIED or CASHIER’S CHECK on an open and solvent bank or bid bond issued by surety company payable to the Owner in an amount equal to five percent (5%) of the base bid.
4.2.3 Revise Lines 1 and 2 to read “If a surety bond is provided the attorney-in-fact who …”.
4.3 ADDENDA Revise Subparagraph 4.3.3 as follows:
Portage Public Schools, Woodland Elementary – Asphalt & Landscaping - Page 2 of 32
4.3.3 Addenda will be issued no later than two days prior to the date for receipt of Bids except an Addendum withdrawing the request for Bids or one which includes postponement of the date for receipt of Bids.
4.4 MODIFICATION OR WITHDRAWAL OF BIDS Revise Subparagraph 4.4.3 as follows:
4.4.3 After the time and date of receipt of Bids, a bid may not be modified, withdrawn or cancelled by the Bidder for sixty (60) days.
ARTICLE 5 – CONSIDERATION OF BIDS
5.3 ACCEPTANCE OF BID (AWARD) Revise Subparagraph 5.3.2 and add Subparagraph 5.3.4 as follows:
5.3.2 Revise Line 1 to read “…right to accept Mandatory and Voluntary Alternates in any order…”
5.3.3 Owner reserves the right determine which bidders are considered the lowest qualified bidder and to award to said bidder.
5.3.4 After the Owner has awarded the Bid Categories the Construction Manager will prepare and send a Notice of
Pending Award to the successful Bidders.
ARTICLE 6 – POST-BID INFORMATION
6.1 CONTRACTOR’S QUALIFICATION STATEMENT Revise Subparagraph 6.1 as follows:
The Owner, Architect and Construction Manager may make such investigations as they deem necessary to determine the ability of the Bidder to perform the work. The Bidder shall furnish all such information and data for this purpose as the Construction Manager may request within twenty-four (24) hours, including, but not limited to, lists of projects completed, financial statements for the past two (2) years, a current list of work in progress. The Owner reserves the right, based on the advice of the Construction Manager and
Architect, to reject any bid if the evidence submitted, or investigation of such Bidder, fails to prove that such
Bidder is properly qualified to carry out the obligations of the contract and to complete the work contemplated therein.
6.3 SUBMITTALS Revise Subparagraph 6.3.1, replace Subparagraphs 6.3.1.1 thru 6.3.1.3 and add
Subparagraphs 6.3.1.4 thru 6.3.1.6 as follows:
6.3.1 The Bidder shall within ten (10) days upon issuance of a Notice of Pending Award furnish to the Owner through the Construction Manager the following:
6.3.1.1 The necessary insurance forms as specified in the Bidding Documents.
6.3.1.2 A cost breakdown on the continuation sheets of the “Application and Certificate for Payment”, AIA
Document G703 showing all major work items, separated by both material and labor.
6.3.1.3 A list of the work which will be performed with the Bidder’s own forces, a list of their subcontractors and a list of work that will be performed by the subcontractor’s forces.
6.3.1.4 Names of the manufacturer’s, products and suppliers of principle items, materials or systems proposed for the work.
6.3.1.5 Schedule information.
6.3.1.6 The Bidder will be notified in writing if any of the above items are not acceptable.
ARTICLE 7 – PERFORMANCE BOND AND PAYMENT BOND
7.1 BOND REQUIREMENTS Revise Subparagraph 7.1.1 as follows and Delete Subparagraph 7.1.3
7.1.1 For Contracts exceeding $50,000 the Bidder shall furnish separate Performance and Payment Bonds covering the faithful performance of the Contract and the payment of all obligations arising thereunder in an acceptable form to the Owner and the Construction Manager. Such bonds can be secured through the
Bidder’s usual sources provided that they fulfill requirements specified elsewhere in these Documents. The cost of such bonds shall be paid for by the Bidder. A space has been provided on the Proposal Form for the
Bidder to identify the amount that shall be added to their proposal should the bonds be required. Should they be required the Bidder shall deliver the bonds to the Construction Manager not later than the date of execution of the Contract.
Portage Public Schools, Woodland Elementary – Asphalt & Landscaping - Page 3 of 32
7.2 TIME OF DELIVERY AND FORM OF BONDS Delete Subparagraph 7.2.2
ARTICLE 8 – ENUMERARTION OF THE PROPOSED CONTRACT DOCUMENTS
8.1 Revise sentence to read: Copies of the proposed Contract Documents will be made available to the Awarded
Bidder as modified and would include but not limited to the following documents as issued by the Construction
Manager.
ARTICLE 9 – INSURANCE
9.1 INSURANCE REQUIREMENTS The required insurance will name Owen-Ames-Kimball Co., Owner and
Architect, along with their respective officers, agents and employees are named as additional insureds for the auto liability and general liability on a primary and non-contributory basis for ongoing and completed operations. The ONLY acceptable endorsement for the additional insureds requirements is ISO form CG 20
37 07 04.
9.1.1 Commercial General Liability – ISO Occurrence form CG 20 10 07 04 and CG 20 37 07 04 are the required forms.
ARTICLE 10 – DESCRIPTION OF WORK Add paragraph 10.1 and 10.2
10.1 BID CATEGORIES Add Subparagraphs 10.1.1, 10.1.1.1., 10.1.1.2, 10.1.1.3 as follows:
10.1.1 Bid Categories have been established to guide Bidders in determining scope of work where trade jurisdiction is not clearly defined. These descriptions are not meant to be all inclusive of work to be included in the Bid.
If a conflict in the assignment of work exists between the Bidding Documents and the descriptions of these bid categories, the requirements of the bid category description(s) shall take precedence and the
Construction Manager shall immediately be notified of the conflict. Bidders are to familiarize themselves with all Bid Categories.
10.1.1.1 Requirements for a specific Bid Category, trade or contract will generally be described in that portion of the
Specifications or Drawings related to that trade or contract. Such requirements may, however, be described in other sections of the contract documents. Contractors will be held responsible for having carefully examined all drawings and read all divisions of the specifications and all contract documents to avoid omissions or duplications and to ensure a complete job.
10.1.1.2 There is not necessarily a direct relationship between the Bid Category numbers or names and the
Specification Division or Section numbers.
10.1.1.3 Unless specifically noted as being furnished only, scopes include the complete installation including materials, labor, equipment, interface with the work of other trades, etc.
10.2 INDEX OF BID CATEGORIES Add paragraph 10.2
Bid Category No. 01 – Earthwork (Awarded to USA Earthworks)
Bid Category No. 02 - Asphalt Paving
Bid Category No. 03 - Landscaping
Bid Category No. 04 – Irrigation (Awarded to Summit Landscape Management)
Bid Category No. 05 – Concrete (Awarded to Choice Concrete Construction)
Bid Category No. 06 - Polished Concrete (Awarded to Earley & Associates, Inc)
Bid Category No. 07 - Pre-Cast Structural Concrete (Awarded to Fabcon Precast, LLC)
Bid Category No. 08 – Masonry (Awarded to Davenport Masonry)
Bid Category No. 09 – Metals (Awarded to FCC Construction)
Bid Category No. 10 - General Trades (Awarded to Hazelhoff Builders)
Bid Category No. 11 - Metal Wall Panels (Awarded to Reliable Sheet Metal)
Bid Category No. 12 – Roofing (Awarded to C & I Building Maintenance, Inc)
Bid Category No. 13 - Joint Sealants (Awarded to Slager Restoration & Sealants)
Bid Category No. 14 - Doors, Frames and Hardware (Awarded to SA Morman & Company)
Bid Category No. 15 - Overhead Doors (Awarded to Partition Systems)
Portage Public Schools, Woodland Elementary – Asphalt & Landscaping - Page 4 of 32
Bid Category No. 16 - Aluminum, Glass & Glazing (Awarded to Forman Glass)
Bid Category No. 17 - Lath, Plaster, Drywall, Acoustical (LPDA) (Awarded to Sobie Company Inc)
Bid Category No. 18 – Flooring (Awarded to Great Lakes Floor Covering)
Bid Category No. 19 - Resilient Athletic Flooring (Awarded to Sobie Company Inc)
Bid Category No. 20 – Painting (Awarded to Vork Brothers Painting)
Bid Category No. 21 - Visual Display Units (Awarded to Cig Jan Products)
Bid Category No. 22 – Signage (Awarded to Universal Sign Systems, Inc.)
Bid Category No. 23 - Food Service Equipment (Awarded to Great Lakes West)
Bid Category No. 24 - Gymnasium Equipment (Awarded to Bareman & Associates)
Bid Category No. 25 - Playground Equipment (Awarded to Sinclair Recreation)
Bid Category No. 26 - Window Shades (Awarded to Product Resource Company)
Bid Category No. 27 - Educational Casegoods (Awarded to Custer)
Bid Category No. 28 – Elevators (Awarded to Kone, Inc.)
Bid Category No. 29 - Fire Protection (Awarded to Brigade Fire Protection, Inc.)
Bid Category No. 30 - DDC Controls (Awarded to ControlNET)
Bid Category No. 31 - Mechanical/Plumbing (Awarded to DHE Plumbing and Mechanical)
Bid Category No. 32 - Testing and Balancing (Awarded to Third Coast Test & Balance)
Bid Category No. 33 – Commissioning (By Owner, Awarded to FisecX)
Bid Category No. 34 – Electrical (Awarded to Allied Electrical)
Bid Category No. 35 - Audio Visual Systems (Awarded to BlueWater Technologies Group Inc.)
Bid Category No. 36 - Clock Systems (Awarded to Digital Age Technologies)
Bid Category No. 37 - Public Address (Awarded to Parkway Electric & Communications LLC)
Bid Category No. 38 - Structured Cabling Systems (Low voltage Data Cabling Systems) (Awarded to DataCom)
Bid Category No. 39 - Access Control and Intercom Entry Systems (Awarded to Parkway Electric & Comm.)
10.3 BID CATEGORY DESCRIPTIONS Add paragraph 10.3
Bid Categories have been established to guide Bidders in determining scope of work where trade jurisdiction is not clearly defined. These descriptions are not meant to be all inclusive of work to be included in Bid.
Unless specifically noted as being furnished only or install only, scope includes complete installation including all labor, material, equipment, etc.
Bidders are required to familiarize themselves with all Bid Categories and Alternates.
Portage Public Schools, Woodland Elementary – Asphalt & Landscaping - Page 5 of 32
BID CATEGORY NO. 01 – EARTHWORK - (Previously Bid - Awarded to USA Earthworks
Include:
1. Complete site related and demolition work as shown on the drawings and as specified in the following sections:
22 1113 Facility Water Distribution Piping
22 1313 Facility Sanitary Sewerage
31 1000 Site Clearing
31 2000 Earth Moving
33 4200 Stormwater Conveyance
33 4600 Subdrainage
2. All necessary surveying and staking for this contractor’s work. The Construction Manager will supply building control points and establish a benchmark.
3. Applicable fees, permits, inspections, etc. as required for the completion of the work in this bid category.
4. Slab sand pavement subbase construction per details. Gravel subbase to be graded and compacted to +/-0.05 foot.
Final grading and proof rolling are the responsibility of asphalt paving or concrete contractor. This contractor is responsible for compaction and/or correction of any areas that do not pass tests.
5. Responsible for keeping public roads clean of construction traffic dirt and debris.
6. Excavation, bedding materials, piping, structures, backfill, compaction, etc. as required for all underground utility construction, all to within 5 feet of the building unless noted otherwise.
7. Temporary tree protection measures.
8. Strip, stockpile and respread topsoil to machine grade +/-0.10 foot.
9. Fire protection site piping including the post indicator valve (P.I.V.) and tamper switch to extend main into building and installer hanger 1’-0 above finish floor.
10. Fire protection contractor to run piping from the 1’-0” above finish floor through inside the building.
11. Site related demolition, including but not limited to, pavements, site walls, utility structures, etc.
12. Soil erosion permit and erosion control.
13. Maintain and control grades to facilitate the run-off of site surface water.
14. Supply and maintain barricading as required for the work of this contractor.
15. Excavation, over excavation and controlled fill for building foundations installed by the concrete contractor, including proper disposal, at an off-site location, of unsuitable soils.
16. Provide and maintain access ramps within the building to be used by the structural steel contractor during erection of structural steel and the concrete contractor during the placement of building foundations. Remove upon the
Construction Manager’s direction.
17. Implement and maintain all BMP's deemed necessary by either the Certified Storm Water Operator or the Agency responsible for jurisdiction of Protection Act 451.
18. Responsible to follow the most stringent requirements between the architectural specifications and those listed in the recommendations of the geotechnical report.
19. Temporary roads, phasing per schedule & site logistics plan.
Exclude:
1. Testing will be provided for and paid for by the Owner.
2. Excavation and backfill mechanical and electrical trades.
3. Demolition of existing building by others.
Portage Public Schools, Woodland Elementary – Asphalt & Landscaping - Page 6 of 32
BID CATEGORY NO. 02 - ASPHALT PAVEMENTS
1. Complete paving as shown on the drawings and specified in Sections:
32 1216 Asphalt Paving
32 1723 Pavement Markings
2. Fine grading and proof rolling of gravel subbase. The subbase will be brought to within +/- 0.05 foot of required final grade by the sitework contractor. Additional gravel or removal of excess gravel required to maintain final grade in this contractor’s responsibility.
3. Obtain the services of a registered surveyor to provide grade stakes prior to fine grading and prior to the placement of asphalt. Any discrepancies of grades or structures must be reported to the Construction Manager prior to placing asphalt.
1. Testing will be provided by the Owner.
BID CATEGORY NO. 03 - LANDSCAPING
1. Complete landscaping and related work as shown on the drawings and as specified in the following sections:
12 9300 Site Furnishings
32 3113 Chain Link Fences and Gates
32 9200 Turf and Grasses
32 9300 Plants
2. Finish grade all topsoil, seeded and landscaped areas, including removal of stones, dirt clumps, sticks and weeds.
3. Multiple site mobilizations will be required.
4. Maintenance of plantings for one (1) year period after substantial completion.
5. Water maintain and establish turf by watering, fertilizing, weeding, mowing, trimming, replanting, and performing other operations as required to establish healthy, viable turf.
6. Obtain the services of a registered surveyor to provide grade stakes prior to fine grading and prior to the placement of landscaping. Any discrepancies of grades or structures must be reported to the Construction
Manager prior to placing landscaping.
7. At end of maintenance period, a healthy, uniform, close stand of grass has been established, free of weeds and surface irregularities, with coverage exceeding 90 percent over any 10 sq. ft. and bare spots not exceeding 5 by 5 inches.
8. Crushed stone and weed barrier fabric.
9. Concrete needed for install of site furnishings.
10. Concrete benches.
11. Ledgestone boulders, wood logs, and precast concrete twig bech.
12. Metal bed edging.
13. Bark mulch.
14. Supply and installation of the flag pole.
1. Irrigation systems.
2. Play area mulch & play area equipment.
Portage Public Schools, Woodland Elementary – Asphalt & Landscaping - Page 7 of 32
3. Extrior Signage.
4. Bollards.
5. Painting Playgorund games.
BID CATEGORY NO. 04 – IRRIGATION – (Previously Bid – Awarded to Summit Landscape Management)
1. Complete the irrigation work as shown on the drawings and specified in Irrigation Systems, Section 32 8400.
2. All sleeving for irrigation system as shown or not shown but required.
3. Wiring from the controller, including the transformer.
4. Connection to water supply.
1. Electrical power to the controller.
BID CATEGORY NO. 05 – CONCRETE – (Previously Bid – Awarded to Choice Concrete Construction)
1. Complete all interior and exterior concrete, foundations, slabs, toppings, curbs, walks etc. and related work as shown on the drawings and as specified in the following sections:
03 3000 Cast-in-Place Concrete
07 2100 Thermal Insulation
31 3116 Termite Control
32 1313 Concrete Paving
32 1373 Concrete Paving Joint Sealants
2. Fine grading and compacting for slabs on grade. The Sitework contractor will establish subgrade +/- 0.05 foot.
Additional sand or removal of excess sand required to maintain final grade is this contractor’s responsibility.
3. Obtain the services of a registered surveyor to provide grade stakes prior to fine grading and prior to the placement of concrete. Any discrepancies of grades or structures must be reported to the Construction Manager prior to placing concrete.
4. Reinforcing steel, as shown.
5. Install embedded items supplied by others.
6. Necessary heat and weather protection for the completion of this contractor’s work.
7. All necessary surveying and staking for this contractor’s work. The C.M. will supply building control points and establish a benchmark.
8. Perimeter slab/foundation insulations.
9. Shoring and supports required for the completion of this contractor’s work.
10. Concrete fill at metal pan stairs.
11. Set and grout base/leveling plates and beam pockets, as indicated. Plates and anchor bolts for structural steel to be supplied by others.
12. Installation of dovetail anchors slots as required for installation of brick veneer. Furnished by the masonry contractor.
13. Vapor barrier at all building slabs on-grade.
14. Install pipe bollards supplied by others.
15. Joint sealants at exposed concrete slabs.
16. See General Comment re: anchor bolt locations.
Portage Public Schools, Woodland Elementary – Asphalt & Landscaping - Page 8 of 32
17. Responsible for interior curbs including but not limited to; curbs as shown at base of cubbies ref. I426.
18. Responsible for concrete edges. Reference details on C600.
19. Concrete ramps, bench pads, seat wall/planter wall.
20. Responsible for exterior ACCU pads.
21. All curbs at interior classroom cubbies, ref: I423
22. Provide insulation and pressure treated lumber for walk in cooler and freezer in kitchen, ref: FSE5
1. Testing will be provided by the Owner
2. Light pole bases and flagpole bases.
3. Housekeeping and/or equipment pads.
4. Polished concrete by BC 06 – Polished Concrete.
BID CATEGORY NO. 06 - POLISHED CONCRETE – (Previously Bid – Awarded to Earley & Associates)
1. Complete polished concrete and related work as shown on the drawings and as specified in the following sections:
03 3000 Cast-In-Place Concrete -in Concrete – both places on Haverhill
03 3543 Polished Concrete
31 3116 Termite Control
32 1373 Concrete Paving Joint Sealants
2. Organize preliminary meeting with the concrete subcontractor and site superintendent to review installation sequencing, control joints and finish requirements.
3. Mock-ups per specifications.
4. Hardeners as specified.
5. Provide protection at completion. Install a layer of Tyvek with dura cover.
6. Vapor barrier & Termite treatment beneath polished slabs.
7. Provide concrete for polished flooring locations only. Exclude all other concrete.
8. Joint fillers for Polished Concrete floors.
9. Supply and install all rebar that ties precast concrete topping to adjacent masonry walls.
10. Inset stainless steel toe treads at each metal an stair where polished.
1. All concrete that is not part of a polished concrete floor.
2. Maintenance of flooring protection.
BID CATEGORY NO. 07 – PRE-CAST STRUCTURAL CONCRETE – (Previously Bid – Awarded to Fabcon)
1. Complete pre-cast structural concrete and related work as shown on the drawings and as specified in the following sections:
03 4100 Pre-Cast Structural Concrete Hollow-Core
2. Shoring and supports required for the completion of this contractors work.
3. Required grouting.
4. Provide openings for mechanical and plumbing equipment as needed.
5. Supply/Install all rebar installed in precast grout.
Portage Public Schools, Woodland Elementary – Asphalt & Landscaping - Page 9 of 32
6. Provide weep holes through top and bottom and each end of hollow core at every core.
7. Provide and install drilled no. 5 bar anchoring precast planks to wall.
1. Testing will be provided by and paid for by the owner.
BID CATEGORY NO. 08 - MASONRY – (Previously Bid – Awarded to Davenport Masonry)
1. Complete masonry and related work as shown on the drawings and as specified in the following sections:
04 2000 Unit Masonry
04 7200 Cast Stone Masonry
07 1900 Water Repellents
07 2119 Foamed-in-Place Insulation
2. Installation of anchor bolts and embedment’s furnished by others. Coordinate location of anchor bolts with trade(s) requiring same.
3. All masonry reinforcement, grout fill, loose fill or cavity wall insulation, etc. as shown and/or specified.
4. Grouting solid of hollow metal frames in masonry.
5. Weld anchors where specified or required.
6. Necessary heat/weather protection for this contractor’s work.
7. Clean all new masonry.
8. Wash interior DCMU prior to concrete polishing activity.
9. Flashings and weepholes concealed in masonry work. Includes pre-finished flashings.
10. Furnish, for installation by others, dovetail anchor slots.
11. Cavity wall insulation, rigid insulation at brick veneer, and dampproofing.
12. Fire safeing, fire resistant caulking, sound attenuation blankets and acoustical sealants being an integral part of the wall system, where shown.
13. Cut, patch and install new beam pockets in existing walls for structural components.
14. Installation of knox box provided by others.
15. Mortar fill between top of masonry wall and precast plant in all conditions. Where plank is parallel to wall after topping slab and second floor walls are in place. Ref detail 5/S302
16. Dumpsters for this contractors waste.
1. Setting of hollow metal frames will be by the General Trades contractor.
2. Fire-resistant joint sealers and firestopping at through-wall penetrations are by others.
Portage Public Schools, Woodland Elementary – Asphalt & Landscaping - Page 10 of 32
BID CATEGORY NO. 09 – METALS – (Previously Bid – Awarded to FCC Construction)
1. Complete the steel fabrication work as shown on the drawings and as specified in the following sections:
05 1200 Structural Steel
05 2100 Steel Joists Framing
05 3100 Steel Decking
05 5000 Metal Fabrications
05 5113 Metal Pan Stairs
05 5213 Pipe and Tube Railings
05 7300 Decorative Metal Railings
2. Furnish and deliver all incidental steel and anchor bolts installed under other bid categories.
3. Furnish and erect all structural steel, joists, decks and metal fabrications.
4. Take field measurements, onsite surveys and inspections required for the ordering and/or installations of items provided under their scope of work.
5. Applicable fees, permits, inspections, etc. as required for the completion of the work in this bid category.
6. Installation of temporary railings at stairs and removal of same at the time of installation or permanent railings.
7. Furnish and erect all temporary railings as required by MiOSHA, including all necessary cables, clamps, turnbuckles, etc.
8. Removal of temporary railings at stairs/precast edges at the time of installation or permanent railings.
9. Elevator pit sump cover and frame. Ref 5/S202
10. Roof access stairs and ladders with system.
11. Pre-finished metal gates with latching hardware and stair gates.
12. Thermoplastic sleeve for bollards.
13. Dumpster gates.
14. Necessary shoring and support for steel erection.
15. Slab edge pour stops. Ref, 6,7,8/S302
16. Provide for holes in steel members that require subsequent installations of blocking.
17. Markings on steel shall be placed on areas of the member which are concealed or shall be removed completely prior to finish painting.
18. Hangers or similar attachments.
19. See General Comment re: anchor bolt locations.
20. Added framing supports for roof top units and roof top openings.
1. Testing will be provided by and paid for by the Owner.
2. Steel bollards will be set by others.
3. Elevator pit ladder by others.
Portage Public Schools, Woodland Elementary – Asphalt & Landscaping - Page 11 of 32
BID CATEGORY NO. 10 - GENERAL TRADES - (Previously Bid – Awarded to Hazelhoff Builders)
1. Complete general work as shown on the drawings and as specified in the following sections:
06 1000 Rough Carpentry
06 1300 Heavy Duty Timber
06 4023 Interior Architectural Woodwork
06 4116 Plastic-Laminate-Faced Architectural Cabinets
06 6116 Solid Surfacing Fabrications
07 2100 Thermal Insulation
07 7200 Roof Accessories
08 1113 Hollow Metal Doors and Frames (Install Only)
08 3113 Access Doors and Frames
08 1416 Flush Wood Doors (Install Only)
08 7100 Door Hardware (Install Only)
09 7723 Fabric-Wrapped Panels
10 1100 Visual Display Units (Install Only)
10 2113.19 Plastic Toilet Compartments
10 2123 Cubicle Curtains and Track
10 2600 Wall and Door Protection
10 2800 Toilet, Bath, and Laundry Accessories
10 4413 Fire Protection Cabinets
10 4416 Fire Extinguishers
10 5113 Metal Lockers
10 7516 Ground-Set Flagpoles
12 3216 Manufactured Plastic-Laminate-Faced Casework
12 3623 – 12 3623.13 Plastic-Laminate-Clad Countertops
12 3653 Laboratory Countertops
12 3661.16 Solid Surfacing Countertops
2. Schedule, take delivery, inventory, store and install all items noted as “Install Only” above. Provide a list of material received each day to the Construction Manager’s Superintendent. All items not so noted are to be furnished and installed.
3. Take field measurements, onsite surveys and inspections required for the ordering and/or installations of items provided under their scope of work.
4. Furnish and erect all blocking shown on drawings or as specified in Miscellaneous Carpentry. Include all blocking not shown but incidental to your scope of work.
5. Roof sheathings/blocking as shown. Prior to installation schedule a meeting with the roofing contractor to coordinate requirements. Notify the Construction Manager’s superintendent of the meeting so that he/she can be in attendance, furnish, for others to install, anchor bolts required for blocking installation.
6. Concrete flag bases.
7. Batt insulations not in partitions/walls.
8. See General Comment re: Access Doors.
9. Protect the tops of casework with cardboard until all work is completed in a given area.
10. Provide Knox Box to be installed by others.
11. Install of owner provided items.
12. Any wood sheathing shown to be by this contractor.
Portage Public Schools, Woodland Elementary – Asphalt & Landscaping - Page 12 of 32
13. Responsible for all millwork, architectural casework, plastic laminate casework/countertops and solid surface countertops.
14. Supply and install casework and glass shown for this category.
15. Backing required but not specifically called out on the drawings.
16. Filler panels, kick plates, metal standards, shelving, countertops, and finished ends.
17. Grommets as shown or specified.
18. Hardware.
19. Base frames.
20. Responsible for suppling and installing waterplace fireplace, ref A101B
21. Drill holes in concrete for gate drop pins. Locate in the field at drop pin locations.
22. Obtain the services of a registered surveyor to provide grade stakes prior to the placement of fencing. Any discrepancies of grades or structures must be reported to the Construction Manager prior to placing fencing.
23. 10 whole trees as shown around campfire.
24. Skim behind impact resistant coverings on block walls. Ref: 12/I 110A
25. Responsible for plastic laminate seat, head detail, trim, etc on Community Nook. Ref: I507
26. Install of automatic door operators.
1. Installation of door hardware associated with aluminum entrances.
2. Temporary weather protection, including temporary partitions and barricades for general access, shall be by the
Construction Manager.
3. Automatic door operators will be furnished by others.
4. Dumpster Gates
BID CATEGORY NO. 11 - METAL WALL PANELS - (Previously Bid – Awarded to Reliable Sheet Metal)
1. Complete metal panel work as shown on the drawings and as specified in the following sections:
07 4616 Aluminum Siding
07 2119 Foamed-In-Place Insulation
2. Blocking as required for the installation of the panel system but not shown in the drawings.
3. Panel-to-panel joint sealants. Coordinate compatibility with product being installed by the contractor for Bid
Category– Joint Sealants.
4. Soffit at canopy and vestibules.
1. Joint sealants at the perimeter of the panel system.
Portage Public Schools, Woodland Elementary – Asphalt & Landscaping - Page 13 of 32
BID CATEGORY NO. 12 – ROOFING – (Previously Bid – Awarded to C & I Building Maintenance)
1. Complete roofing and related work as shown on the drawings and as specified in the following sections:
07 4113.16 Standing-Seam Metal Roof Panels
07 5323 EPDM Membrane Roofing
07 6200 Sheet Metal Flashing and Trim
07 7100 Roof Specialties
07 7129 Manufactured Roof Expansion Joints
07 7253 Snow Guards
2. Wood blocking needed solely for the installation of the roofing system and/or metal panels and not shown on the drawings.
3. Applicable fees, permits, inspections, etc. as required for the completion of the work in this bid category.
4. Flash/seal penetrations through roofing membranes.
5. Snow removal as required for the completion of this contractor’s work.
6. Responsible for insulation under this contractors work including vertical.
1. Prefabricated curbs and equipment support units.
BID CATEGORY NO. 13 - JOINT SEALANTS – (Previously Bid – Awarded to Slager Restoration & Sealants)
1. Complete moisture protection work shown on the drawings and as specified in the following sections:
07 1326 Self-Adhering Sheet Waterproofing
07 2715 Nonbituminous Self-Adhering Sheet Air Barriers
07 9200 Joint Sealants
07 9219 Acoustical Joint Sealants
2. Acoustical sealants at items built into wall construction (i.e. door frames). Acoustical sealant being an integral part of wall construction (i.e. top of wall) shall be by others.
3. Joints in concrete and masonry wall construction, as required (horizontal & vertical).
4. Joint sealants at the perimeter of metal panel systems.
5. Responsible for waterproofing at elevator.
1. Fire resistant joint sealers.
2. Joint sealants at exposed concrete slabs.
3. Joint sealants at the perimeter of aluminum windows, curtainwalls and storefront systems.
Portage Public Schools, Woodland Elementary – Asphalt & Landscaping - Page 14 of 32
BID CATEGORY NO. 14 – DOORS, FRAMES AND HARDWARE – (Previously Bid – Awarded to SA Morman & Co.)
1. Furnish and deliver doors, frames and hardware as shown on the drawings and as specified in the following
08 1113 Hollow Metal Doors and Frames (Supply Only)
08 1416 Flush Wood Doors (Supply Only)
08 7100 Door Hardware (Supply Only)
2. Coordination with the supplier(s) of steel frames and finish hardware.
3. Take field measurements, onsite surveys and inspections required for the ordering and/or installations of items provided under their scope of work.
4. Multiple deliveries will be required. Coordinate with the project schedule.
5. Provide temporary keying system during construction.
6. Automatic door operators.
7. Coordinate/verify door undercuts at tile floors.
8. Electrical are to install power supplies, General Trades to install electric strikes.
1. Installation is by the General Trades contractor.
2. Furnishing of hardware for aluminum entrances, regardless of how specified in Section 08 7100 or if in a section referenced in another bid category.
BID CATEGORY NO. 15 - OVERHEAD DOORS – (Previously Bid – Awarded to Partition Systems)
1. Complete overhead type doors as shown on the drawings and as specified in the following sections:
08 3323 Overhead Coiling Doors
2. Any required blocking and/or supports required for the complete installation of this scope of work that is not shown on the drawings.
3. Take field measurements, onsite surveys and inspections required for the ordering and/or installations of items provided under their scope of work.
4. Wiring of unit components from the disconnect, or other point of termination of electrical power. Includes low voltage wiring required to control the operation of the doors.
Portage Public Schools, Woodland Elementary – Asphalt & Landscaping - Page 15 of 32
BID CATEGORY NO. 16 - ALUMINUM, GLASS AND GLAZING - (Previously Bid – Awarded to Forman Glass)
1. Complete aluminum, glass and glazing as shown on the drawings and as specified in the following sections:
08 4113 Aluminum Framed Entrances and Storefronts
08 4329 Sliding Storefronts
08 4413 Glazed Aluminum Curtain Walls
08 4523 Fiberglass-Sandwich-Panel Assemblies
08 7100 Hardware
08 8800 Glazing
08 8813 Fire-Rated Glazing
08 8853 Security Glazing
2. Glass cleaning at substantial completion of the entire project.
3. Take field measurements, onsite surveys and inspections required for the ordering and/or installations of items provided under their scope of work.
4. Install of automatic door operators.
5. Supply and install door hardware at aluminum entrances.
6. All windows to have aluminum sub-sills with up legs and end dams. Sub-sills shall be shimmed up from the interior side to create positive slope to the exterior.
7. Unframed mirrors.
8. Joint sealants at the perimeter of the systems installed by this contractor.
9. Furnishing of hardware for aluminum entrances, regardless of how specified in Section 08 7100 or if in a section referenced in another bid category.
10. Electrical are to install power supplies, General Trades to install electric strikes.
1. Metal wall panels
2. Automatic door operators are furnished by others.
Portage Public Schools, Woodland Elementary – Asphalt & Landscaping - Page 16 of 32
BID CATEGORY NO. 17 - LATH, PLASTER, DRYWALL AND ACOUSTICAL – (Previously Bid – Awarded to Sobie)
1. Complete finish and other work as shown on the drawings and as specified in the following sections:
05 4000 Cold Formed Metal Framing
06 1600 Sheathing
06 6400 Plastic Paneling
07 2100 Thermal Insulation
07 8443 Joint Firestopping
09 2216 Non-Structural Metal Framing
09 2900 Gypsum Board
09 5100 Acoustical Shaped Ceilings
09 5113 Acoustical Panel Ceilings
09 5133 Acoustical Metal Pan Ceilings
09 5436 Suspended Decorative Grids
09 8316 Acoustical Ceiling Coating
09 8400 Tectum Panel Ceilings
09 8433 Sound-Absorbing Wall Units
09 8436 Sound-Absorbing Ceiling Units
09 8437 Linear Acoustical Baffles
2. Fire safeing, fire resistant caulking, sound attenuation blankets and acoustical sealants being an integral part of the wall system, where shown.
3. All rigid insulation not in composite masonry walls, at foundation walls or part of roofing systems.
4. See General Comment re: Access Doors
5. All sound and batt insulation, except that installed in curtainwall or storefront frame.
6. Sound sealants.
7. Framing, insulation, sheathing, etc. at exterior walls.
8. Add support structure for ceiling wire or cable as required.
9. Additional support for classroom sliders.
1. Fire-resistant joint sealers and firestopping at through-wall penetrations are by the contractors for Divisions 21, 22, 23, 26, 27, and 28.
2. Acoustical sealants at built-in items (i.e. door frames) shall be by others.
3. Fire protection heads shall be cut-in by the fire protection contractor.
Portage Public Schools, Woodland Elementary – Asphalt & Landscaping - Page 17 of 32
BID CATEGORY NO. 18 – FLOORING – (Previously Bid – Awarded to Great Lakes Floor Covering)
1. Complete flooring as shown on the drawings and as specified in the following sections:
09 3000 Tiling
09 6500 Resilient Flooring
09 6813 Tile Carpeting
2. Minor preparation of floor and wall surfaces such as grinding, patching, latexing, latence, scum and paint removal, etc.
3. Final cleaning of carpet and tile surfaces.
4. Required reducer strips and base.
5. Caulking of control joints in tile surfaces.
6. Cubbie curb wrapped in resilient flooring Ref. I 426
7. Provide contrasting resilient accent strip at top and bottom of ramp.
BID CATEGORY NO. 19 – RESILIENT ATHLETIC FLOORING – (Previously Bid – Awarded to Sobie)
1. Complete flooring as shown on the drawings and as specified in the following sections:
09 6513 Resilient Base and Accessories
09 6566 Resilient Athletic Flooring
2. Minor preparation of floor and wall surfaces such as grinding, patching, latexing, latence, scum and paint removal, etc.
3. Installation of Gymnasium Equipment penetrating resilient athletic flooring. This includes grouting and plugging as required.
4. Final cleaning of surfaces.
5. Required reducer strips and base.
6. Painting, striping and logos.
Portage Public Schools, Woodland Elementary – Asphalt & Landscaping - Page 18 of 32
BID CATEGORY NO. 20 – PAINTING – (Previously Bid – Awarded to Vork Brothers)
1. Complete finish work as shown on the drawings and as specified in the following sections:
09 7200 Wall Coverings
09 7270 Graphic Wall Coverings
09 9114 Exterior Painting
09 9123 Interior Painting
09 9300 Staining and Transparent Finishing
2. Painting of exposed mechanical, fire protection, and electrical piping and equipment.
3. Final touch-up.
4. Finishing of running wood trim and paneling veneers, including filling of nail holes.
1. Wood doors are prefinished.
BID CATEGORY NO. 21 – VISUAL DISPLAY UNITS (Previously Bid – Awarded to Cig Jan)
1. Complete visual display unit work as shown on the drawings and as specified in the following section:
10 1100 Visual Display Units (Supply only)
2. Furnish all mounting brackets and supports needed beyond wood backing.
1. Installation by General Trades.
BID CATEGORY NO. 22 – SIGNAGE (Previously Bid – Awarded to Universal Sign)
1. Complete signage as shown on the drawings and as specified in the following sections:
10 1419 Dimensional Letter Signage
10 1426 Post and Panel-Pylon Signage
10 1453 Traffic Signage
Portage Public Schools, Woodland Elementary – Asphalt & Landscaping - Page 19 of 32
BID CATEGORY NO. 23 - FOOD SERVICE EQUIPMENT – (Previously Bid – Awarded to Great Lakes West)
1. Furnish and deliver food service equipment as shown on the drawings and as specified in Section:
11 4000 Food Service Equipment.
2. See General Comments re: food service equipment.
3. Take field measurements, onsite surveys and inspections required for the ordering and/or installations of items provided under their scope of work.
4. Fire resistant joint sealers as specified in Section 07 8413 for all food service associated penetrations.
BID CATEGORY NO. 24 – GYMNASIUM EQUIPMENT – (Previously Bid – Awarded to Bareman & Associates)
1. Complete gymnasium equipment and related work as shown on the drawings and as specified in the following
11 6623 Gymnasium Equipment
BID CATEGORY NO. 25 – PLAYGROUND EQUIPMENT – (Previously Bid – Awarded to Sinclair)
1. Complete playground equipment and related work as shown on the drawings and as specified in the following
11 6800 Playfield Equipment and Structures
32 1816.13 Playground Protective Surfacing
2. Playground Equipment
3. Play Area Mulch.
4. Playground painting
5. Responsible for concrete related to/required for your equipment.
6. Painted play area as indicated in asphalt play pavement area on sheet L120 & L130.
7. Obtain the services of a registered surveyor to provide grade stakes prior to fine grading and prior to the placement of landscaping. Any discrepancies of grades or structures must be reported to the Construction Manager prior to placing landscaping.
BID CATEGORY NO. 26 – WINDOW SHADES – (Previously Bid – Awarded to Product Resource Company)
1. Complete finish work as shown on drawings and as specified in the following sections:
12 2413 Roller Window Shades
2. Final Cleaning.
3. Coordinate with electrical.
Portage Public Schools, Woodland Elementary – Asphalt & Landscaping - Page 20 of 32
BID CATEGORY NO. 27 – EDUCATIONAL CASEGOODS - (Previously Bid – Awarded to Custer)
1. Complete casework as shown on the drawings and as specified in the following sections:
12 3550.13 Educational Casegoods
2. All casework shown in GREEN on interiors plans are part of this bid category.
3. Backing required but not specifically called out on the drawings.
4. Filler panels, kick plates, metal standards, shelving, countertops, and finished ends.
5. Grommets as shown or specified.
6. Hardware.
7. Base frames.
8. Coordinate on all items supplied by furniture manufacturer.
1. Plywood sheathings and wood blocking as shown.
2. Joint sealants at the perimeter of the panel system.
BID CATEGORY NO. 28 – ELEVATORS – (Previously Bid – Awarded to Kone Inc.)
1. Complete new elevators as shown on the drawings and as specified in Section:
14 2123.16 Machine-Room-Less Electric Traction Passenger Elevators
2. Smoke detection system(s).
3. Applicable fees, permits, inspections, etc. as required for the completion of the work in this bid category.
4. Take field measurements, onsite surveys and inspections required for the ordering and/or installations of items provided under their scope of work.
5. Floor and ceiling finishes, as scheduled.
6. Fire resistant joint sealers as specified in Section 07 8413 for all elevator associated penetrations.
7. Provide and install mini elevator key box.
8. Elevator pit ladder.
Portage Public Schools, Woodland Elementary – Asphalt & Landscaping - Page 21 of 32
BID CATEGORY NO. 29 – FIRE PROTECTION – (Previously Bid – Awarded to Brigade Fire Protection)
1. Complete fire protection and related work as shown on the drawings and as specified as follows:
07 8413 Penetration Firestopping
21 0500 Common Work Results for Fire Suppression
21 1000 Water Based Fire Suppression Systems
2. Connection to service brought to within 1’-0” above finish floor in mechanical room.
3. Fire resistant joint sealers as specified in Section 07 9200 for all fire protection associated penetrations.
4. Access doors required but not shown, for access to fire protection systems.
5. Installation by others.
6. Housekeeping and/or equipment pads required for the installation of this contractor’s equipment, whether or not they are indicated on the drawings.
7. Applicable fees, permits, inspections, etc. as required for the completion of the work in this bid category.
8. Cutting of penetrations through architectural elements (i.e. ceiling pads) required to facilitate the installation of fire protection system(s).
9. Coordination and supervision of electrical connection to control and alarm panels furnished by this contractor.
10. See General Comments re: Access Doors.
11. See General Comments re: Food Service Equipment.
12. See General Comments re: Fireproofing.
1. Post indicator valve.
BID CATEGORY NO. 30 - DDC CONTROL SYSTEM – (Previously Bid – Awarded to ControlNET)
1. Complete Direct Digital Control systems and related work as shown on the drawings and as specified in the following sections:
23 0900 Instrumentation and Control for HVAC
2. Motorized dampers.
3. Coordinate with electrical rough-ins.
4. Coordinate with related mechanical system installations.
5. Fire resistant joint sealers as specified in Section 07 8413 for all building management associated penetrations.
6. Applicable fees, permits, inspections, etc. as required for the completion of the work in this bid category.
7. See General Comments re: fireproofing.
8. See General Comments re: Food Service Equipment
9. See General Comment re: Access Doors
10. Work and coordinate with commissioning agent.
11. Furnish, mount, start, commission VFD’s. Electrician provides power.
12. This contractor to install any 120 Volt power required for their panels/controls not shown on Electrical drawings.
13. Include rough-in for all stats/sensors
Portage Public Schools, Woodland Elementary – Asphalt & Landscaping - Page 22 of 32
BID CATEGORY NO. 31 - MECHANICAL/PLUMBING – Previously Bid – Awarded to DHE)
1. Complete plumbing, mechanical and related work…