About this file

Summary

This is a specifications and contract document for the City of Georgetown, Texas, for the construction of Williams Drive Intersection Improvements at Lakeway/Bootys Crossing (Bid #202641, Contract #26-0237-CIP). The project involves installation of additional turn lanes on Bootys Crossing and Lakeway Drive at their intersection with Williams Drive, including approximately 800 linear feet of roadway improvements on Bootys Crossing and 400 linear feet on Lakeway Drive. The scope encompasses pedestrian signal modifications, storm drainage improvements, sidewalk construction, utility adjustments, and water line extensions of approximately 1,500 feet along Bootys Crossing and 500 feet along Williams Drive. Sealed bids were due October 8, 2026, at 2:00 PM, with a non-mandatory pre-bid conference held virtually on September 22, 2026, via Microsoft Teams. Bidding documents were available starting September 13, 2026, through CivCast USA or the engineer's office (Kasberg, Patrick & Associates, LP) for a non-refundable fee of $100 per set. The contract is awarded to the lowest responsible bidder on a unit price basis, with substantial completion required within 240 calendar days and final completion within 270 calendar days of the Notice to Proceed.

Bid security of five percent of the maximum bid price is required in the form of a certified check or bid bond. Performance and payment bonds equal to 100 percent of the contract amount are required upon award. The project includes 148 line items covering mobilization, site preparation, demolition, excavation, utility installation, pavement, drainage structures, water line extensions, wastewater work, traffic signals, and striping. Prevailing wage rates per Wage Decision 2023-141 are mandatory. Retainage of five percent will be withheld until thirty days after final completion in accordance with Texas Government Code §2253. The City of Georgetown is exempt from Texas sales and use taxes on materials to be incorporated into the work. Liquidated damages apply for delays beyond the contractual completion timeline. The project requires a DVD recording of existing and post-construction conditions, a trench safety plan sealed by a licensed professional engineer, and a stormwater pollution prevention plan submitted to the Texas Commission on Environmental Quality.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF GEORGETOWN, TEXAS

SPECIFICATIONS AND CONTRACT DOCUMENTS

FOR THE CONSTRUCTION OF

Williams Drive Intersection Improvements at

Lakeway/Bootys Crossing

Bid # 202641

Contract # 26-0237-CIP

Project # PRJ000277

Bid Date: October 8, 2026

KASBERG, PATRICK & ASSOCIATES, LP

CONSULTING ENGINEERS

TEMPLE - GEORGETOWN

September 2026

HADEN J. MATTKE

154595

09/08/2026

TABLE OF CONTENTS

Section # Title

00020 Invitation to Bid

00099 Special Project Information

00100 Instructions to Bidders

00300 Bid Form

00400 Statement of Bidders Experience

00410 Bid Bond Form

00500 Standard Form of Agreement between Owner and Contractor

00610 Texas Statutory Performance Bond

00620 Texas Statutory Payment Bond

00700 Standard General Conditions of the Construction Contract

00800 Supplementary Conditions

00801 Notice of Award

00802 Notice to Proceed

00900 Capital Improvement Project Requirements

Section CIP1 Definition of Terms

Section CIP2 Abbreviations

Section CIP3 Summary of Work

Section CIP4 Site Conditions

Section CIP5 Contractor Use of Premises

Section CIP6 Control of Work

Section CIP7 Control of Materials

Section CIP8 Legal Relations and Responsibilities to the Public

Section CIP9 Environmental Protection Procedures

Section CIP10 Submittals

Section CIP11 Trench Safety Requirements

Section CIP12 Testing of Pipelines and Manholes

Section CIP13 Summary of Testing (Miscellaneous)

Section CIP14 Project Closeout

Section CIP15 Project ID Signage

Section CIP16 Warranty

Section CIP17 Inspection of Projects

Section CIP18 Location, Exposure and Raising of Manholes and Water Valves

Section CIP19 Tree Pruning

01000 General Specifications

Section G1 Barricades, Signs and Traffic Handling

Section G2 Site Preparation

Section G3 Site Clearing

Section G4 Pipe Excavation, Trenching, Backfilling and Compaction

Section G5 Granular Fill Materials

Section G6 Sedimentation and Temporary Erosion Control

Section G7 Loaming, Hydroseeding and Permanent Erosion Control

Section G8 Miscellaneous Work and Clean-up

Section G9 Structural Excavation

01100 Concrete Specifications

Section C1 Concrete Structures

Section C2 Concrete for Structures

Section C3 Riprap

Section C4 Concrete Curb and Gutter

Section C5 Concrete Sidewalks, Driveways and Flatwork

Section C6 Membrane Curing

Section C7 Reinforcing Steel

Section C8 Reinforced Concrete Pipe

Section C9 Flowable Backfill

01150 Street and Drainage Specifications

Section SD1 Hot Mix Asphaltic Concrete Pavement

Section SD2 Roadway Excavation

Section SD3 Embankment

Section SD4 Flexible Base (Crushed Stone)

Section SD5 Striping

Section SD6 Storm Sewer Manholes

Section SD7 Roadway Rehabilitation

01200 Wastewater Specifications

Section WW1 Concrete Manholes (Wastewater)

Section WW2 Polyvinyl Chloride (PVC) Pipe-Wastewater

Section WW3 Connections to and work on the Existing Wastewater System

Section WW4 Abandoning Existing Manholes (Wastewater)

Section WW5 Wastewater System Rehabilitation

Section WW6 Wastewater System Rehabilitation by Cured-In-Place Pipe

01250 Water Specifications

Section W1 Ductile Iron Pipe and Fittings

Section W2 Polyvinyl Chloride (PVC) Pipe-Water

Section W3 Valves, Hydrants and Appurtenances

Section W4 Encasement Pipe

Wage Decision

2023-141

City of Georgetown

Williams Drive Intersection Improvements at Lakeway/Bootys Crossing

Ver. 117/2016 Section 00020 Invitation to Bid

SECTION #00020

INVITATION TO BID

Bids may be electronically submitted through the City E-bid system accessible via City’s web site at https://gtowntx.ionwave.net/SourcingEvents.aspx?SourceType=1

Sealed bids will be received by the City of Georgetown in the Georgetown Municipal Court

Purchasing Department, at 510 W. 9th, Street, Georgetown, Texas 78626 on Tuesday, October 8, 2026 at 2:00 PM. and immediately thereafter publicly opened and read, for constructing the following project:

Bid #202641

The project consists of furnishing and installing and providing all labor and materials required The

Project consists of installation of additional turn lanes on Bootys Crossing and Lakeway Drive where they intersect with Williams Drive, with roadway improvements along approximately 800 linear feet of Bootys Crossing and 400 linear feet of Lakeway Drive, including pedestrian signal modifications, storm drainage, sidewalk, utility adjustments, and other appurtenant improvements, as well as water line extensions of approximately 1,500 feet along Bootys Crossing and 500 feet along Williams

Drive.

Bids must be submitted on the complete project. Bids must be enclosed in a sealed envelope, addressed to City of Georgetown, ATTN: Senior Buyer, 510 W. 9th, Street., Georgetown, Texas

78626 and the outside of the envelope must be marked Williams Drive Intersection Improvements at Lakeway/Bootys Crossing. All bids must be made on blank forms provided. The name, address, and license number of the Bidder and addendum acknowledgement must be plainly marked on the outside of the envelope.

Plans, specifications and bidding documents may be secured beginning Sunday, September 13, 2026. Bidding Documents are on file and may be examined at the following locations:

• On-line at http://www.civcastusa.com. Documents may be downloaded or viewed free of charge at this website. It is the bidder’s responsibility to determine that a complete set of documents as defined in the Instructions to Bidders is received.

• At the office of Kasberg, Patrick & Associates, LP; (512) 819-9478; 800 South Austin Avenue;

Georgetown, Texas 78626. Bidding Documents may be obtained upon payment to the

Engineer, accompanied with a check in the amount of $100 per set, which is not refundable.

Bids not accompanied by cashier’s check or bid bond will not be considered. Bidders should register on the City of Georgetown’s Ebid web site – https://gtowntx.ionwave.net/Login.aspx. The date, time and place for the pre-bid conference, if to be held, are specified below and in Section #00100, https://gtowntx.ionwave.net/SourcingEvents.aspx?SourceType=1 https://gtowntx.ionwave.net/Login.aspx

Instructions to Bidders.

Each bid must be accompanied by cash or a certified cashier’s check, drawn on a bank or trust company authorized to do business in the State of Texas, payable to the City of Georgetown in an amount at least equal to five percent (5%) of the total amount of the bid, as a guarantee that a contract will be entered into. In lieu of cash or a certified check, the Bidder may submit a bid bond in the form prescribed in the Instructions to Bidders.

Performance and Payment Bonds, when required, shall be executed on forms furnished by OWNER.

Each bond shall be issued in an amount of one hundred percent (100%) of the Contract Amount by a solvent surety or insurance company licensed to do business in the State of Texas and as specifically prescribed in the General Conditions and Supplemental Conditions.

Minimum insurance requirements are specified in the General Conditions and Supplemental

Conditions. The successful Bidder and its subcontractors shall pay to laborers, workmen, and mechanics the prevailing wage rates as required by the Supplemental Conditions.

The right is reserved to reject any or all bids, to waive minor technicalities, and to award a contract or contracts which, in the opinion of the Owner, appear to be in its best interest. A minor technicality is one that does not affect the competitiveness of the Bid. The Owner reserves the right to hold any or all proposals for the period of time from the opening of bids as specified in Section 00300, Bid

Form.

Effective January 1, 2016, Texas Government Code Section 2252.908 requires persons who enter into contract with a government entity to submit a disclosure of interested parties (Form 1295) to the governmental entity or state agency at the time the business entity submits the signed contract to the governmental entity or state agency. The law applies only to a contract of a governmental entity or state agency that either (1) requires an action or vote by the governing body of the entity or agency before the contract may be signed or (2) has a value of at least $1 million.

Use the following link to access filing instructions:

https://www.ethics.state.tx.us/filinginfo/1295/

A non-mandatory pre-bid video conference for this project will be held on Tuesday, September 22, 2026 at 10:00 AM To attend the pre-bid use the Microsoft Teams Link provided below. The project site will be available for inspection by prospective bidders immediately following the pre-bid conference.

Microsoft Teams meeting

Join: https://teams.microsoft.com/meet/266754730068191?p=92VxetfKLT4iyWiYUC

Meeting ID: 266 754 730 068 191

Passcode: B55Vs9TW

Need help? | System reference

Dial in by phone

+1 512-672-8405,,301778743# United States, Austin

Find a local number

Phone conference ID: 301 778 743#

Publication Dates:

Williamson County Sun:

September 13, 2026

September 20, 2026 https://teams.microsoft.com/meet/266754730068191?p=92VxetfKLT4iyWiYUC https://aka.ms/JoinTeamsMeeting?omkt=en-US https://teams.microsoft.com/l/meetup-join/19%3ameeting_NDI5OGQ0MzUtOWQ5OS00ZTk5LWIzNTctOTFkZTEzOTA5M2U4%40thread.v2/0?context=%7b%22Tid%22%3a%22a1429869-9c66-47a7-9f6c-115d9a1c90d9%22%2c%22Oid%22%3a%22d5a9b4a5-9a63-4271-8f61-704c31ea56b2%22%7d tel:+15126728405,,301778743 https://dialin.teams.cloud.microsoft/1cf993c8-3315-49dd-afa0-9e3a542cdcc9?id=301778743

Section #00099 Special Project Information

SECTION #00099

SPECIAL PROJECT INFORMATION

TO BIDDERS/CONTRACTORS

A. All questions and inquiries about the project should be directed to

Haden Mattke, PE, CFM; (512) 819-9478, email: hmattke@kpaengineers.com, until 5:00 PM p.m. on Friday, September 25, 2026. Questions should be in the form of e-mail to hmattke@kpaengineers.com. Questions after that time and date will not be answered and the Engineer and/or Owner shall not be bound by any references or dates obtained by the

Bidders unless an official addendum is produced and released by Kasberg, Patrick &

Associates, LP.

B. Daily, on-site construction representation and observation will be provided by the

Georgetown Utility Systems Staff.

C. Contract Administration and Pay Estimate Approvals will be provided by the Georgetown

Utility Systems to City of Georgetown.

D. The Contractor shall provide a DVD recording to the City of Georgetown of the project prior to and after construction. This recording will particularly show the existing rights-of-way, properties, and existing structures.

E. The Bid Item for Mobilization, Bonds and Insurance shall not exceed 5% of the total amount

Bid for any particular Base Bid, Add Alternate Bid or Alternate Bid.

F. Upon completion and generation of a punchlist, the City of Georgetown will provide one (1) final inspection in accordance with Section 00900, CIP14.06 – Final Inspection which is found in the Technical Specifications of these Contract Documents. Any additional inspections will be paid for by the Contractor at $200 per inspection.

G. The right is reserved, as the interest of the City of Georgetown may require, to reject any and all bids and to waive minor technicalities in bids received. The right is also reserved to eliminate a portion of the work or add additional work as required to keep the total contract amount within the funds budgeted.

H. Liquidated damages for this project have been set based on time restraints, additional time and expenses incurred for inspection services and additional time and expense incurred for professional services related to contract administration, as well as any legal fees related to delays.

I. This project is a unit price contract. Payments shall only be made for actual units installed at the unit price bid.

A.

mailto:hmattke@kpaengineers.com

Ver. 7/2016 Section 00100 Instructions to Bidders

SECTION #00100

INSTRUCTIONS TO BIDDERS

ARTICLE 1: DEFINED TERMS

1.01 Terms used in these Instructions to Bidders will have the meanings indicated in the General

Conditions and Supplementary Conditions. Additional terms used in these Instructions to

Bidders have the meanings indicated below which are applicable to both the singular and plural thereof:

A. Bidder--The individual or entity who submits a Bid directly to OWNER.

B. Issuing Office--The office from which the Bidding Documents are to be issued.

C. Successful Bidder--The Bidder submitting a responsive Bid to whom OWNER (on the basis of OWNER’s evaluation as hereinafter provided) makes an award.

ARTICLE 2: COPIES OF BIDDING DOCUMENTS

2.01 Complete sets of the Bidding Documents in the number and for the non-refundable deposit sum, if any, stated in the Advertisement or Invitation to Bid may be obtained from the

Issuing Office.

2.02 Complete sets of Bidding Documents must be used in preparing Bids; neither OWNER nor

ENGINEER assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.

2.03 OWNER and ENGINEER in making copies of Bidding Documents available on the above terms do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.

ARTICLE 3: QUALIFICATIONS OF BIDDERS

3.01 To demonstrate Bidder’s qualifications to perform the Work, Bidder shall submit written evidence such as financial data, previous experience, present commitments, and such other data as may be called for below.

A. Section 00400 Statement of Bidder’s Experience, including Attachments A – I.

ARTICLE 4: EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA,

AND SITE

4.01 Subsurface and Physical Conditions

A. The Supplementary Conditions identify:

1. Those reports of explorations and tests of subsurface conditions at or contiguous to the Site that Engineer has used in preparing the Bidding

Documents.

2. Those drawings of physical conditions in or relating to existing surface and subsurface structures at or contiguous to the Site (except Underground

Facilities) that ENGINEER has used in preparing the Bidding Documents.

B. Copies of reports and drawings referenced in paragraph 4.01.A will be made available by ENGINEER to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the “technical data” contained therein upon which Bidder is entitled to rely as provided in paragraph 4.02 of the General

Conditions and established in paragraph 4.02 of the Supplementary Conditions.

Bidder is responsible for any interpretation or conclusion Bidder draws from any

“technical data” or any other data, interpretations, opinions or information contained in such reports or shown or indicated in such drawings.

4.02 Underground Facilities

A. Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site is based upon information and data furnished to OWNER and ENGINEER by owners of such

Underground Facilities, including OWNER, or others.

4.03 Hazardous Environmental Condition

A. The Supplementary Conditions identify those reports and drawings relating to a

Hazardous Environmental Condition identified at the Site, if any, that ENGINEER has used in preparing the Bidding Documents.

B. Copies of reports and drawings referenced in paragraph 4.03.A will be made available by OWNER to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the “technical data” contained therein upon which Bidder is entitled to rely as provided in paragraph 4.06 of the General

Conditions has been identified and established in paragraph 4.06 of the

Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.

4.04 Provisions concerning responsibilities for the adequacy of data furnished to prospective

Bidders with respect to subsurface conditions, other physical conditions and Underground

Facilities, and possible changes in the Bidding Documents due to differing or unanticipated conditions appear in paragraphs 4.02, 4.03, and 4.04 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work appear in paragraph 4.06 of the General Conditions.

4.05 On request, OWNER will provide Bidder access to the Site to conduct such examinations, investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.

4.06 DELETED

4.07 In submitting this Bid, the Bidder represents that:

A. Bidder has examined and carefully studied the Bidding Documents, including any

Addenda and the other related data identified in the Bidding Documents;

B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the

Work;

C. Bidder is familiar with and is satisfied as to all federal, state, and local laws and regulations that may affect cost, progress, or performance of the Work;

D. Bidder has carefully studied (1) all reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site

(except Underground Facilities) which have been identified in the Supplementary

Conditions as provided in paragraph 4.02 of the General Conditions, and (2) all reports and drawings of a Hazardous Environmental Condition, if any, at the Site which have been identified in the Supplementary Conditions as provided in paragraph 4.06 of the General Conditions;

E. Bidder has obtained and carefully studied (or accepts the consequences and responsibility for not doing so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents to be employed by Bidder, and safety precautions and programs incident thereto;

F. Bidder does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents;

G. Bidder is aware of the general nature of the work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Bidding Documents;

H. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the

Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents;

I. Bidder has promptly given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirmed that the written resolution thereof by ENGINEER is acceptable to Bidder;

and

J. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted.

4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that

Bidder has complied with every requirement of this Article 4, that without exception the

Bid is premised upon performing and furnishing the Work required by the Bidding

Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the

Bidding Documents, that Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by ENGINEER are acceptable to Bidder, and that the Bidding

Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.

ARTICLE 5: PRE-BID CONFERENCE

5.01 A nonmandatory virtual pre-Bid conference will be held at 10:00 AM on September 22, 2026 via Microsoft Teams. To attend pre -bid use the Microsoft Teams link provided below.

The project site will be available for inspection by prospective bidders immediately following the pre-bid conference. Representatives of OWNER and ENGINEER will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. ENGINEER will transmit to all prospective Bidders of record such Addenda as

ENGINEER considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.

Microsoft Teams meeting

Join: https://teams.microsoft.com/meet/266754730068191?p=92VxetfKLT4iyWiYUC

Meeting ID: 266 754 730 068 191

Passcode: B55Vs9TW

Need help? | System reference

Dial in by phone

+1 512-672-8405,,301778743# United States, Austin

Find a local number

Phone conference ID: 301 778 743#

ARTICLE 6: SITE AND OTHER AREAS

6.01 The Site is identified in the Bidding Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment, or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by

CONTRACTOR. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by OWNER unless otherwise provided in the

Bidding Documents.

ARTICLE 7: INTERPRETATIONS AND ADDENDA

7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to

ENGINEER in writing. Interpretations or clarifications considered necessary by

ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by ENGINEER as having received the Bidding Documents.

Questions received less than ten days prior to the date for opening of Bids may not be https://teams.microsoft.com/meet/266754730068191?p=92VxetfKLT4iyWiYUC https://aka.ms/JoinTeamsMeeting?omkt=en-US https://teams.microsoft.com/l/meetup-join/19%3ameeting_NDI5OGQ0MzUtOWQ5OS00ZTk5LWIzNTctOTFkZTEzOTA5M2U4%40thread.v2/0?context=%7b%22Tid%22%3a%22a1429869-9c66-47a7-9f6c-115d9a1c90d9%22%2c%22Oid%22%3a%22d5a9b4a5-9a63-4271-8f61-704c31ea56b2%22%7d tel:+15126728405,,301778743 https://dialin.teams.cloud.microsoft/1cf993c8-3315-49dd-afa0-9e3a542cdcc9?id=301778743 answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

7.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable by OWNER or ENGINEER.

ARTICLE 8: BID SECURITY

8.01 A Bid must be accompanied by Bid security made payable to OWNER in an amount of five percent (5%) of Bidder’s maximum Bid price and in the form of a certified or bank check or a Bid Bond [on the form attached] issued by a surety meeting the requirements of paragraphs 5.01 and 5.02 of the General Conditions.

8.02 If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, OWNER may annul the Notice of Award and the Bid security of that Bidder will be forfeited.

8.03 Bid security of Unsuccessful Bidders will be returned upon written request by the Bidder.

The bid security will be returned within fourteen days of bid opening to a Bidder who submits a certified or bank check unless OWNER believes Bidder has a reasonable chance of receiving the award. The bid security may be retained by the OWNER until the award of the Agreement by City Council.

ARTICLE 9: CONTRACT TIMES

9.01 The number of days within which, or the dates by which, the Work is to be (a) Substantially

Completed and (b) also completed and ready for final payment are set forth in Section 500, Standard Form of Agreement.

ARTICLE 10: LIQUIDATED DAMAGES

10.01 Provisions for liquidated damages, if any, are set forth in Section 500, Standard Form of

Agreement, Article 4.03.

ARTICLE 11: SUBSTITUTE AND “OR-EQUAL” ITEMS

11.01 The Contract, if awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration of possible substitute or “or-equal” items. Whenever it is specified or described in the Bidding Documents that a substitute or “or-equal” item of material or equipment may be furnished or used by

CONTRACTOR if acceptable to ENGINEER, application for such acceptance will not be considered by ENGINEER until after the Effective Date of the Agreement. The procedure for submission of any such application by CONTRACTOR and consideration by

ENGINEER is set forth in the General Conditions and may be supplemented in the General

Requirements.

ARTICLE 12: SUBCONTRACTORS, SUPPLIERS, AND OTHERS

12.01 Bidder shall identify the major Subcontractors Bidder proposes for this Project in Section

00400 Statement of Bidder’s Experience. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, individual, or entity as provided on

Attachment E of Statement of Bidder’s Experience. If OWNER or ENGINEER, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, OWNER may, before the Notice of Award is given, request apparent Successful

Bidder to submit a substitute, in which case apparent Successful Bidder shall submit an acceptable substitute.

12.02 If apparent Successful Bidder declines to make any such substitution, OWNER may award the Contract to another Bidder that proposes to use acceptable Subcontractors, Suppliers, individuals, or entities. Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which OWNER or ENGINEER makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to OWNER and ENGINEER subject to revocation of such acceptance after the Effective Date of the

Agreement as provided in paragraph 6.06 of the General Conditions.

12.03 CONTRACTOR shall not be required to employ any Subcontractor, Supplier, individual, or entity against whom CONTRACTOR has reasonable objection.

ARTICLE 13: PREPARATION OF BID

13.01 The Bid form is included with the Bidding Documents. Additional copies may be obtained from ENGINEER.

13.02 All blanks on the Bid form shall be completed by printing in ink or by typewriter and the

Bid signed. A Bid price shall be indicated for each [section, Bid item, alternative, adjustment unit price item, and unit price item] listed therein, or the words “No Bid,” “No Change,” or

“Not Applicable” entered.

13.03 A Bid by a corporation shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sign. The corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the signature.

13.04 A Bid by a partnership shall be executed in the partnership name and signed by a partner

(whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership shall be shown below the signature.

13.05 A Bid by a limited liability company shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown below the signature.

13.06 A Bid by an individual shall show the Bidder’s name and official address.

13.07 A Bid by a joint venture shall be executed by each joint venturer in the manner indicated on the Bid form. The official address of the joint venture must be shown below the signature.

13.08 All names shall be typed or printed in ink below the signatures.

13.09 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid form.

13.10 The address, telephone number, and email address for communications regarding the Bid shall be shown.

13.11 The Bid shall contain evidence of Bidder’s authority and qualification to do business in

Texas or covenant to obtain such qualification prior to award of the Contract. Bidder’s

Texas state contractor license number for, if any, shall also be shown on the Bid form.

ARTICLE 14: BASIS OF BID; EVALUATION OF BIDS

14.01 Unit Price

A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the

Bid schedule.

B. The total of all estimated prices will be determined as the sum of the products of the estimated quantity of each item and the unit price Bid for the item. The final quantities and Contract Price will be determined in accordance with paragraph

11.03 of the General Conditions.

C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words.

14.02 The Bid price shall include such amounts as the Bidder deems proper for overhead and profit on account of cash allowances, if any, named in the Contract Documents as provided in paragraph 11.03 of the General Conditions.

14.03 As provided by Texas Local Government Code § 252.043(d), the Contract shall be awarded to the lowest responsible Bidder.

ARTICLE 15: SUBMITTAL OF BID

15.01 Each prospective Bidder is furnished one separate unbound copy each of the Bid form, and, if required, the Bid Bond form. The unbound copy of the Bid form shall be completed and one original and one copy shall be submitted with the Bid security and the following data:

A. Section 00400 Statement of Bidder’s Experience, including Attachments A – I.

15.02 A Bid shall be submitted no later than the date and time prescribed and at the place indicated in the advertisement or Invitation to Bid and shall be enclosed in an opaque sealed envelope plainly marked with the Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the Bid Number, the name and address of

Bidder, and shall be accompanied by the Bid security and other required documents. If a

Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate envelope plainly marked on the outside with the notation “BID

ENCLOSED.” A mailed or hand delivered Bid shall be addressed to:

ATTN: Senior Buyer

510 W. 9th Street

Georgetown, Texas 78626

ARTICLE 16: MODIFICATION AND WITHDRAWAL OF BID

16.01 A Bid may be modified or withdrawn by an appropriate document duly executed in the manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids.

16.02 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with

OWNER and promptly thereafter demonstrates to the reasonable satisfaction of OWNER that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.

ARTICLE 17: OPENING OF BIDS

17.01 Bids will be opened at the time and place indicated in the advertisement or Invitation to Bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.

ARTICLE 18: BIDS TO REMAIN SUBJECT TO ACCEPTANCE

18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but

OWNER may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.

ARTICLE 19: AWARD OF CONTRACT

19.01 As permitted by the Texas Local Government Code § 252.043, OWNER reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. OWNER further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to be non-responsible.

OWNER may reject the Bid of any Bidder if OWNER believes that it would not be in the best interest of the Project to make an award to that Bidder. OWNER reserves the right to waive minor technicalities and make an award to best serve the interest of the OWNER.

19.02 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that

Bidder and the rejection of all Bids in which that Bidder has an interest.

19.03 In evaluating Bids, OWNER will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award.

19.04 In evaluating Bidders, OWNER will consider the qualifications of Bidders and may consider the qualifications and experience of Subcontractors, Suppliers, and other individuals or entities proposed for those portions of the Work for which the identity of Subcontractors, Suppliers, and other individuals or entities must be submitted as provided in Section 00400

Statement of Bidder’s Experience.

19.05 OWNER may conduct such investigations as OWNER deems necessary to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers, individuals, or entities to perform the Work in accordance with the Contract

Documents.

19.06 If the Contract is to be awarded, OWNER will award the Contract to the lowest responsible

Bidder.

19.07 No Contract will be awarded or binding upon OWNER until it has been signed by its Mayor

(or by the Mayor Pro Tem or other Council members stated in the City Charter) after having been duly authorized to do so by the City Council of the City of Georgetown.

19.08. Chapter 176 of the Texas Local Government Code requires a person or agent of a person who contracts or seeks to contract for the sale or purchase of property, goods, or services with a local governmental entity to submit a Conflict of Interest Questionnaire to the appropriate records administrator of the City not later than the seventh business day after the date the person begins contract discussions or negotiations with the local governmental entity, or submits to the local governmental entity an application, response to a request for proposals or Bids, correspondence, or another writing related to a potential agreement with the local governmental entity. For purposes of this Bid, Bidder may submit the completed form with the Bid. Each Bidder is responsible for verifying it is using the most current form available from www.ethics.state.tx.us. This legislation is subject to change, and each vendor should consult their own attorney regarding the current law. This statement is provided for information purposes only, and submission of a completed Conflict of Interest

Questionnaire is not a required element of the Bid.

19.09 Section 2252.908 of the Texas Government Code states that a governmental entity or state agency may not enter into certain contracts with a business entity unless the business entity submits a disclosure of interested parties to the governmental entity or state agency at the time the business entity submits the signed contract to the governmental entity or state agency. The law applies only to a contract of a governmental entity or state agency that either (1) requires an action or vote by the governing body of the entity or agency before the contract may be signed or (2) has a value of at least $1 million.

All contractors entering into a contract that is approved by City Council must complete a

Form 1295.

A business entity must enter the required information on Form 1295 online at https://www.ethics.state.tx.us/filinginfo/1295/ and print a copy of the completed form, which will include a certification of filing that will contain a unique certification number.

An authorized agent of the business entity must sign the printed copy of the form and have the form notarized. The completed Form 1295 with the certification of filing must be submitted to the City.

ARTICLE 20: CONTRACT SECURITY AND INSURANCE

20.01 Article 5 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth OWNER’S requirements as to performance and payment Bonds and insurance.

When the Successful Bidder delivers the executed Agreement to OWNER, it must be accompanied by such Bonds.

20.02 The CONTRACTOR shall not commence Work until he has furnished certification of all insurance required and such has been approved by the City of Georgetown, nor shall the

CONTRACTOR allow any subcontractor to commence Work until proof of all similar insurance that is required of the Subcontractor has been furnished and approved. The

OWNER must be an additional insured on the policies and the policies must provide coverage to OWNER for work under this Contract. A certificate of insurance that contains the following language, or similar language, WILL NOT BE ACCEPTED as evidence that

OWNER is an additional insured and covered under the policies: “ISSUED AS A MATTER

OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE

HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND, OR ALTER THE

COVERAGE AFFORDED BY THE POLICIES BELOW.” The Certificate of Liability

Insurance form included in the Bid Documents must be used by the CONTRACTOR’s

Insurer, and CONTRACTOR’s Insurer must furnish a full and complete copy of the underlying insurance policy to the OWNER upon OWNER’s request to establish proof of insurance.

20.03 If the Bidder’s insurance company is authorized, pursuant to its agreement with Bidder, to arrange for the replacement of a loss, rather than by making a cash payment directly to the

City of Georgetown, the insurance company must furnish or have furnished by Bidder, a performance bond in accordance with Chapter 2253.021(b), Texas Government Code, and a payment bond in accordance with Chapter 2253.021(c), Texas Government Code.

ARTICLE 21: SIGNING OF AGREEMENT

21.01 When OWNER gives a Notice of Award to the Successful Bidder, it shall be accompanied by the required number of unsigned counterparts of the Agreement with the other Contract

Documents which are identified in the Agreement as attached thereto. Within 15 days thereafter, Successful Bidder shall sign and deliver the required number of counterparts of the Agreement and attached documents to OWNER. Within ten days thereafter, OWNER shall deliver one fully signed counterpart to Successful Bidder with a complete set of the

Drawings with appropriate identification.

ARTICLE 22: SALES AND USE TAXES

22.01 OWNER is exempt from Texas state sales and use taxes on materials and equipment to be incorporated in the Work, pursuant to the provisions of Section 151.309(5) of the Texas

Tax Code. Said taxes shall not be included in the Bid. Refer to paragraph 6.10 of the

General Conditions for additional information.

ARTICLE 23: RETAINAGE

23.01 Under paragraph 14.02 of the General Conditions, retainage in the amount of five percent

(5%) will be withheld pursuant to Texas Government Code § 2253, and such retainage will be withheld until thirty (30) days after Final Completion.

Williams Drive Intersection Improvements at Lakeway/Bootys Crossing

SECTION #00300

BID FORM

BIDDER NAME:

PROJECT IDENTIFICATION:

City of Georgetown

Williams Drive Intersection Improvements at Lakeway/Bootys Crossing

CONTRACT IDENTIFICATION AND NUMBER: 26-0237-CIP

THIS BID IS SUBMITTED :

The City of Georgetown, Texas

Georgetown Municipal Court, Purchasing Department

510 W. 9th Street

Georgetown, Texas 78626

1.01

1.02

2.01

The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an

Agreement with OWNER in the form included in the Bidding Documents to perform all

Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the

Bidding Documents.

BIDDER understands and agrees that the OWNER has the right to reject any or all Bids and to waive any informalities.

Bidder accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. The Bid will remain subject to acceptance for 90 days after the

Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of OWNER.

Section #00300

Page 1 of 38 Bid Form

Williams Drive Intersection Improvements at Lakeway/Bootys Crossing

3.01

A.

Addendum No. Addendum Date

B.

C.

D.

E.

F.

Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of all which is hereby acknowledged.

In submitting this Bid, Bidder represents, as set forth in the Agreement, that:

Bidder has visited the Site and become familiar with and is satisfied as to the general, local and Site conditions that may affect cost, progress, and performance of the Work.

Bidder is familiar with and is satisfied as to all federal, state and local Laws and

Regulations that may affect cost, progress and performance of the Work.

Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.02 of the

General Conditions, and (2) reports and drawings of a Hazardous Environmental

Condition, if any, which has been identified in the Supplementary Conditions as

Bidder has obtained and carefully studied (or assumes responsibility for having done so) all additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding

Documents to be employed by Bidder, and safety precautions and programs incident thereto.

Bidder does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents.

Page 2 of 38 Bid Form

Williams Drive Intersection Improvements at Lakeway/Bootys Crossing

G.

H.

I.

J.

4.01

5.01

The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for

Bidder further represents that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;

Bidder has not solicited or induced any individual or entity to refrain from bidding; and

Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER.

Bidder will complete the Work in accordance with the Contract Documents for the following price(s):

Bidder is aware of the general nature of work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Bidding Documents.

Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents.

Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by ENGINEER is acceptable to Bidder.

Page 3 of 38 Bid Form

Williams Drive Intersection Improvements at Lakeway/Bootys Crossing

UNIT PRICE SCHEDULE FOR

Williams Drive Intersection Improvements at Lakeway/Bootys Crossing

Base Bid

ITEM

NO.

ESTIMATED

QUANTITY

UNIT

ITEM DESCRIPTION & UNIT PRICE IN

WORDS

UNIT PRICE IN

FIGURES

TOTAL

EXTENDED

PRICE

1 100% LS Insurance, Bonds and Mobilization, not to exceed 5% of Base Bid, Complete for

Dollars and Cents per Lump Sum.

2 31 STA Provide Labor, Equipment, Tools and

Supervision to Complete Preparation of

Right-of-way, Complete for

Dollars and Cents per Station.

3 100% LS For Providing a Video DVD of the Project

Area Prior to and After Construction, Complete for $ $

Dollars and Cents per Lump Sum.

4 100% LS Submit Trench Safety Plan Prepared &

Signed by P.E., in Conformance with State

Law and OSHA, for Base Bid, Complete for

Dollars and Cents per Lump Sum.

Base Bid

Page 4 of 38 Bid Form

Williams Drive Intersection Improvements at Lakeway/Bootys Crossing

UNIT PRICE SCHEDULE FOR

Williams Drive Intersection Improvements at Lakeway/Bootys Crossing

Base Bid

ITEM

NO.

ESTIMATED

QUANTITY

UNIT

ITEM DESCRIPTION & UNIT PRICE IN

WORDS

UNIT PRICE IN

FIGURES

TOTAL

EXTENDED

PRICE

5 3300 LF Implement & Follow Trench Safety Plan

(Pipe), Complete for $ $

Dollars and Cents per Linear Foot.

6 7700 SF Implement & Follow Trench Safety Plan

(Structures), Complete for $ $

Dollars and Cents per Square Foot.

7 100% LS Prepare and Implement Stormwater

Pollution Prevention Plan, Including

Submission to and Receiving Permits from

Texas Commission on Environmental

Quality (TCEQ) for Base Bid, Complete for

Dollars and Cents per Lump Sum.

8 100% LS Prepare Barricade, Signing and Traffic

Safety Plan (Vehicular) for Base Bid

Prepared and Sealed by Liscened

Professional Engineer in the State of Texas, Complete for $ $

Dollars and Cents per Lump Sum.

Base Bid

Page 5 of 38 Bid Form

Williams Drive Intersection Improvements at Lakeway/Bootys Crossing

UNIT PRICE SCHEDULE FOR

Williams Drive Intersection Improvements at Lakeway/Bootys Crossing

Base Bid

ITEM

NO.

ESTIMATED

QUANTITY

UNIT

ITEM DESCRIPTION & UNIT PRICE IN

WORDS

UNIT PRICE IN

FIGURES

TOTAL

EXTENDED

PRICE

9 100% LS Implement and Administer Barricade, Signing and Traffic Safety Plan (Vehicular) for Base Bid, Complete for

Dollars and Cents per Lump Sum.

10 550 LF Furnish, Install, Maintain & Remove Silt

Fence, Complete for $ $

Dollars and Cents per Linear Foot.

11 25 LF Furnish, Install, Maintain & Remove Rock

Berm, Complete for $ $

Dollars and Cents per Linear Foot.

12 50 LF Furnish, Install, Maintain & Remove Inlet

Protection, Complete for $ $

Dollars and Cents per Linear Foot.

13 1775 CY For Unclassified Excavation of Roadway &

Channel, Complete for $ $

Dollars and Cents per Cubic Yard.

Base Bid

Page 6 of 38 Bid Form

Williams Drive Intersection Improvements at Lakeway/Bootys Crossing

UNIT PRICE SCHEDULE FOR

Williams Drive Intersection Improvements at Lakeway/Bootys Crossing

Base Bid

ITEM

NO.

ESTIMATED

QUANTITY

UNIT

ITEM DESCRIPTION & UNIT PRICE IN

WORDS

UNIT PRICE IN

FIGURES

TOTAL

EXTENDED

PRICE

14 25 CY For Unclassified Fill For Roadway &

Channel, Complete for $ $

Dollars and Cents per Cubic Yard.

15 325 CY For Select Fill (Offsite) For Roadway &

Right-of-Way, Complete for $ $

Dollars and Cents per Cubic Yard.

16 1 EA Remove and Replace Existing Fire Hydrant

Assembly, Including Valve, Appurtenances, and Blue Button, Complete for

Dollars and Cents per Each.

17 1 EA Remove 3' x 3' Grate Inlet, Complete for

Dollars and Cents per Each.

18 1 EA Remove and Reset Water Valve Box to

Grade (in Vegetated Area), Complete for

Dollars and Cents per Each.

Base Bid

Page 7 of 38 Bid Form

Williams Drive Intersection Improvements at Lakeway/Bootys Crossing

UNIT PRICE SCHEDULE FOR

Williams Drive Intersection Improvements at Lakeway/Bootys Crossing

Base Bid

ITEM

NO.

ESTIMATED

QUANTITY

UNIT

ITEM DESCRIPTION & UNIT PRICE IN

WORDS

UNIT PRICE IN

FIGURES

TOTAL

EXTENDED

PRICE

19 100% LS Remove Existing Guard Fence Where

Shown and Replace End Treatment, Complete for $ $

Dollars and Cents per Lump Sum.

20 2 EA Remove Sign, Complete for $ $

Dollars and Cents per Each.

21 3 EA Remove and Reset Existing Sign, Complete for $ $

Dollars and Cents per Each.

22 875 SY Sawcut, Demolition, Removal and Haul Off of Existing Concrete Sidewalk, Ramps, and

Driveways, Complete for

Dollars and Cents per Square Yard.

23 1200 LF Sawcut, Demolition, Removal and Haul Off of Existing Curb & Gutter, Complete for

Dollars and Cents per Linear Foot.

Base Bid

Page 8 of 38 Bid Form

Williams Drive Intersection Improvements at Lakeway/Bootys Crossing

UNIT PRICE SCHEDULE FOR

Williams Drive…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .