Whittier Boulevard (2735) Bulkhead.pdf

PDF 5 MB Posted

Attached to
Whittier Boulevard (2735) Bulkhead
Solicitation number
E1909319
Issued by
Los Angeles County, California

About this file

Summary

This is a bid proposal document issued by the City of Los Angeles Department of Public Works, Bureau of Engineering for the Whittier Boulevard (2735) Bulkhead project (Work Order E1909319). The project involves emergency pre-qualified on-call (PQOC) geotechnical and structural construction services to construct a cantilevered bulkhead retaining structure approximately 10.5 feet tall spanning 16 linear feet in the Boyle Heights neighborhood. The work includes three cast-in-drilled-hole (CIDH) piles, reinforced concrete retaining walls, a grade beam, sidewalk removal and reconstruction, excavation, drainage installation, and backfill operations. Bidders must submit proposals by 2:00 p.m. on October 21, 2026 at Los Angeles City Hall, Room 355. The project completion timeline is 120 calendar days from the Notice to Proceed, with liquidated damages assessed at $640 per calendar day. Only contractors currently listed on the Emergency PQOC Geotechnical/Structural Construction Services Projects contract may bid. Site visits are presumed to occur prior to bid submission. Award is intended to be expedited to the lowest responsive, responsible bidder, with a pre-construction meeting scheduled following issuance of the Notice to Proceed.

Bidders must provide a lump sum proposal for mobilization (capped at $10,000 reimbursement), traffic control, clearing and grubbing, excavation, pile installation, concrete work, steel closure plates, drainage, backfill, and restoration work. Bid Item 2, an allowance for differing site conditions, is fixed at $25,000.00 and cannot be modified. The successful bidder must submit two surety bonds (Payment and Performance bonds) each for 100% of the contract price before work commences. All contractors and subcontractors must be registered with the California Department of Industrial Relations per Senate Bill 854. Required insurance includes workers' compensation, general liability with $1,000,000 limits, automobile liability, and professional liability coverage. The project is subject to prevailing wage requirements under California Labor Code, municipal lobbying ordinances, child support compliance certifications, and construction and demolition waste recycling requirements. Contractor responsibility questionnaires and pledges of compliance must accompany all bids.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Emergency Pre-Qualified On-Call (PQOC)

Geotechnical/Structural Contract Services Project

BID PROPOSAL

In and for the

City of Los Angeles, California Department of Public Works

Bureau of Engineering

Whittier Boulevard (2735) Bulkhead

W.O. E1909319

7-18-18 i

TABLE OF CONTENTS

PAGE

Table of Contents……………………………………………………………….. 2 pages

Important Notice………………………………………………………………… 3 pages

PART I

Bid Proposal…………………………………………………………………….. 1-1

Schedule of Work and Prices…………………………………………………. 1-2

Responsibility Questionnaire…………………………………………………. 1-3a and 1-3b

Pledge of Compliance with Contractor Responsibility Ordinance………… 1-3c

Signature Sheet and Affidavit…………………………………………………. 1-4

List of Subcontractors………………………………………………………….. 1-5

Subcontractors and Subcontractor Substitution……………………………. 1-6

Certification of Compliance with Child Support Obligations………………….. 1-7

PART II

(NOT USED)

PART III

(NOT USED)

PART IV

General Instructions and Information for Bidders………………………….. 4-1 thru 4-5

Senate Bill 854…………………………………………………………………. 1 page

Required Insurance and Minimum Limits………………………………….. 1 page

Holiday Season Street Closure Restrictions………………………………… 11 pages

Stipulated Unit Prices (2021)………………………………………………….. 13 pages

Municipal Lobbying Ordinance……………………………………………… 24 pages

Disclosure Ordinances Affidavit………………………………….…………… 1 page

Whittier Boulevard (2735) Bulkhead - W.O. E1909319

7-18-18 ii

PART IV (continued)

Construction and Demolition Waste Recycling Ordinance Compliance Packet (supersedes General Conditions, Article 00221 and General Requirements, Section 01572)……………………………………………..

12 pages

Final Subcontracting Report Submittal………………………………........ 2 pages

Important Notice Section…………………………………………………… 1 page

Contractors' Use of Criminal History for Consideration of Employment Applications Ordinance …………………….…………..……………………

1 page

Contractor Evaluation Program……………………………………….……. 1 page

Contractor Special Recognition Program…………………………….……. 1 page

Buy Clean California Act Implementation…………………………………. 2 pages

Executive Directive 35: Equitable Access to Contracting Opportunities... 1 page

ATTACHMENTS

1. Plans (15 Sheets)

2. Specifications

A. General Conditions

B. General Requirements

C. Geotechnical Data Report

D. Special Provisions i

IMPORTANT NOTICE

INFORMATION FOR BIDDERS

The Board of Public Works authorized that bids be only accepted from contractors currently listed on the Emergency PQOC Geotechnical/Structural Construction Services Projects for Public Works. The Board reserves the right to waive any irregularities or informalities in any bid or in the bidding and to make an award on a contract in the best interest of the City.

All work shall be performed in accordance with the terms and conditions of the Contract Agreement for the Emergency PQOC Geotechnical/Structural Construction Services Projects for Public Works (Contract) and shall conform to the Bureau’s Master General Conditions, Master General Requirements, and the Standard Specifications for Public Works Construction “Green Book” (Parts 2 thru 6) 2012, 2014, 2017 and 2021 Editions, and the “Brown Book” May 4, 2022 Edition.

1. BIDDER'S SUBMITTALS

Part I - Must be properly completed and submitted to the Board of Public Works not later than the time and date designated on Page 1-1 of the Proposal at Los Angeles City Hall; 200 N.

Spring Street, Room 355; Los Angeles, California 90012, Attention: Contract Section.

2. BIDDER INFORMATION AND ASSISTANCE

Requests for clarification of conflicts and omissions from the contract documents shall be addressed in writing to

Elaine Lei Geotechnical Engineering Division 1149 S. Broadway, 1st Floor Los Angeles, CA 90015 Email: Elaine.Lei@lacity.org

3. CALIFORNIA STATE SENATE BILL 854:

1. Contractors are advised of the following changes made by California State Senate Bill 854 to the State of California Department of Industrial Relations:

a. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the California Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].

b. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the DIR pursuant to Labor Code section 1725.5.

c. DIR maintains a current list of registered contractors at this web address

Important Notice (Continued) ii https://efiling.dir.ca.gov/PWCR/Search.action

2. Please see the one-page section, “Senate Bill 854” in Part IV of the Bid Proposal for more information about Senate Bill 854.”

4. EXPEDITED AWARD AND START OF CONSTRUCTION

Due to the need to have this project constructed as expeditiously as possible, the Board of Public Works has requested that all bidders be advised of the following:

a. It is the intention of the Board of Public Works to award this project to the lowest responsive, responsible bidder as expeditiously as possible. A Construction Order will be issued to award the project to the lowest responsive, responsible bidder.

b. Evidence of acceptable insurance and required bonds must be on file with the Board of Public Works before the Contractor may begin work.

c. A "Bid Bond" is not required for this project. The successful bidder shall provide two good and sufficient surety bonds. A "Payment Bond" and “Performance Bond” representing 100% of the total bid amount shall be filed with the Board Office before work commences.

d. All bidders are requested to cooperate by submitting all required documentation and any additional documentation requested by staff as expeditiously as possible. Failure of any bidder to submit the required additional documentation by the date and time specified by staff may render the bidder non-responsive and can be used in considering that bidder for any future contract awards.

e. A protest to a particular bid must be submitted in writing and in detail to the Project Award and Control Division via a fax at (213) 847-0703 within one (1) City working day following the close of Board business the day bids are received no later than 4 p.m. Refer to Item No. 2 of the “General Instructions and Information for Bidders” in Part IV of the Bid Proposal for more information.

5. PRE-CONSTRUCTION MEETING

Because the counting of days will commence within one working day after the issuance of the Notice to Proceed (NTP), the successful bidder shall mobilize as soon as possible after the issuance of the NTP. A pre-construction meeting will be scheduled after the NTP is issued. The City reserves the right, in its sole discretion, to reassign the work to the next lowest bidder if the successful bidder fails to mobilize as indicated.

6. ELECTRONIC SIGNATURE POLICY

(Types of Documents Permitted for Electronic and Scanned Signature) https://efiling.dir.ca.gov/PWCR/Search.action

Important Notice (Continued) iii

This Policy is intended to broadly support the use of electronic signatures. Departments are encouraged to consult with the City Attorney’s Office if Departments are uncertain if the electronic/scanned signature is acceptable for a document. However, below are examples of the types of documents where electronic/scanned signatures are allowed:

1. Memos, forms, board letters and other correspondence Electronic/Scanned

2. Contracts Electronic/Scanned

3. Certificates and Permits Electronic/Scanned

4. Notarized Document Scanned

Please note that Ethics Form 50 and 55 must be signed via a software that is accepted by the Ethics Commission (i.e. DocuSign, Adobe). (Issued March 19, 2020)

7. BUY CLEAN CALIFORNIA ACT (BCCA)

I. For projects with a bid due date on or after July 1, 2021 that include eligible materials as part of the permanent work, the successful bidder shall be required to provide current facility-specific Environmental Product Declaration (EPD) for the materials and meet the State of California maximum limits for Global Warming Potential as listed by California's Department of General Services with the applicable submittal.

https://www.dgs.ca.gov/PD/Resources/Page-Content/Procurement-Division- Resources-List-Folder/Buy-Clean-California-Act

II. Please see the two-page section, “Buy Clean California Act Implementation” in Part IV of the Bid Proposal for more information about Buy Clean California Act.

THE DOCUMENTS CONTAINED HEREIN HAVE BEEN APPROVED BY:

Arsen Voskerchyan, P.E.

Division Engineer Project Award and Control Division Bureau of Engineering

Whittier Boulevard (2735) Bulkhead - W.O. E1909319 https://www.dgs.ca.gov/PD/Resources/Page-Content/Procurement-Division-%20%20%20%20%20%20%20%20%20%20%20Resources-List-Folder/Buy-Clean-California-Act https://www.dgs.ca.gov/PD/Resources/Page-Content/Procurement-Division-%20%20%20%20%20%20%20%20%20%20%20Resources-List-Folder/Buy-Clean-California-Act

PART I

1-1 Rev. 1/18/2019

PART I OF IV

In and for the City of Los Angeles

California

TYPE OF CONTRACT CASH

PROPOSAL ATTACHMENTS Plan Drawings (15 sheets)

SPECIFICATIONS General Conditions, General Requirements, Geotechnical Data

Report, Special Provisions, Standard Specifications for Public Works Construction (Greenbook) 2012, 2014, 2017 and 2021 Edition* as amended by the City's Brown Book, May 4, 2022 Edition*.

PROJECT LOCATION See Plan Drawings

COMPLETION TIME 120 Calendar Days

LIQUIDATED DAMAGES $640 per Calendar Day

BID DATE

Bids must be received no later than 2:00 p.m. on October 21, 2026 at Los Angeles City Hall, 200 North Spring Street, Room 355; Los Angeles, California 90012. Call the Board Office at (213) 978-0262 if you have difficulties gaining access to City Hall.

Firm Name:

Address:

Telephone Number: ( ) Fax Number: ( )

Email Address:

Contractor's License Number: Classification: Expiration Date:

Business Tax Registration Certificate (BTRC) No.:

* Part 1 of the Greenbook and Brown Book are not a part of the Specifications.

ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL

1 Mobilization per General Requirements Section 01292 LS

Allowance for Differing Site Conditions "DSC" per General

Requirements Section 01212 & 01253 25,000.00$

3 Traffic control and signs per WATCH Manual LS

Clear and grub, including disposal of all vegetation, tree trimming, and deleterious debris within the project limits per plan sheet SD101.

LS

5 Removal, haulaway, and disposal of existing sidewalk. SF 125

Excavation of loose soil and debris, including for 1) pile installation, 2) for cast-in-place wall, and 3) grade beam, including haulaway of excess soil.

CY 2

Drill three (3) 24" diameter holes, averaging 18' deep, per pile schedule - Plan Sheet SB201. Dispose of excess spoils.

LF 55

Supply and install three (3) 24” diameter reinforced concrete caisson piles, 15-ft deep, per Plan Sheets SB101 to SB301.

CY 5

Construct concrete grade beam, including all reinforcement as per Plan Sheets SB301 and SB302.

LF 16

Construct cast-in-place walls, including reinforcement and weepholes, per Plan Sheets SB101, SB201, SB301, and SB302.

LF 16

Supply and install one ½" thick galvanized steel continuous closure plate, including welding.

EA 1

Construct yard drain, including surface drain, per Plan Sheets C-

1 and C-2.

EA 1

Supply and install 3/8" diameter pea gravel wrapped in non-woven geo-fabric behind bulkhead, maximum18" wide up to 2-ft below the back of wall gutter, as shown on Detail E11, Sheet

SB301.

CY 3

Place backfill in lifts and compact to 90% min. relative compaction.

CY 7

Install new minimum 4” concrete sidewalk over minimum 4” CMB per City Std Plan S-444-1.

SF 125

Hydromulch - approved bonded fiber matrix applied per manufacturer's recommendations with approved seed mix.

SF 150

TOTAL BID AMOUNT:

Unit abbreviation: LS=lump sum, SF=sqaure foot, CY=cubic yard, LF=linear foot, EA=each

NOTES

W.O. E1909319

SCHEDULE OF WORK AND PRICES

City of Los Angeles - Department of Public Works - Bureau of Engineering

Whittier Boulevard (2735) Bulkhead

A. MOBILIZATION: If the successful bidder shows an amount in excess of $10,000 for Mobilization (Bid Item No. 1), the bidder will be paid $10,000 per Specification Section 01292 of the General Requirements. The difference between the

Contractor’s bid amount for Bid Item No. 1 and $10,000 will be paid after the Statement of Completion has been issued.

B. FIXED COST ITEM: Bid Item No. 2 is considered a Fixed Cost Item at the time of bid. The pre-printed dollar amount in figures listed in the SCHEDULE OF WORK AND PRICES shall not be changed or deleted.

1-2

C O N S T R U C T I O N

Responsibility Questionnaire (rev 1/23/2020)

CITY OF LOS ANGELES

CONTRACTOR RESPONSIBILITY ORDINANCE (CRO) QUESTIONNAIRE

Unless otherwise exempt from the Contractor Responsibility Ordinance (Los Angeles Administrative Code Section 10.40, et. seq.), a Company/Firm bidding with the City of Los Angeles must complete this Questionnaire. If no bid is required, the prospective contractor still must submit a Questionnaire.

The signatory for this Questionnaire must be authorized to respond to these questions on behalf of the Company/Firm. Any false or misleading statement(s), the failure to answer any of the required questions, or the failure to submit the completed Questionnaire with its bid may render the bid/proposal non-responsive. If a response does not fit in the space provided, then you may submit an attachment with your questionnaire.

The Company is responsible for keeping the Questionnaire responses current. If any changes have occurred that would render any of the responses inaccurate in any way, this document must be updated within thirty

(30) days of the change(s).

A. BIDDER / PROPOSER / PROSPECTIVE CONTRACTOR CONTACT INFORMATION

Business Name Contractor’s License Number

Street Address City State Zip

Contact Person, Title Phone Fax

TYPE OF SUBMISSION:

The Questionnaire being submitted is:

An initial submission of a completed Questionnaire.

An update of a prior Questionnaire dated ______/______/______.

No change. I certify under penalty of perjury under the laws of the State of California that there has been no change to any of the responses since the last Questionnaire dated ____/______/____ was submitted by the firm.

B. BUSINESS ORGANIZATION / STRUCTURE

Indicate the organizational structure of your firm. “Firm” includes a sole proprietorship, corporation, joint venture, consortium, association, or any combination thereof.

Corporation: Date incorporated: _____/_____/_____ State of incorporation:

List the corporation’s current officers.

President: __________________________________________________________________________ Vice President: ______________________________________________________________________ Secretary: __________________________________________________________________________ Treasurer:

1-3a

C O N S T R U C T I O N

Responsibility Questionnaire (rev 01/23/2020)

TERMS OF ACCEPTANCE AND SIGNATURE:

I certify under penalty of perjury under the laws of the State of California that I read and understand the questions contained in this questionnaire and the responses contained herein and on all Attachments. I further certify that I have provided full and complete answers to each question, and that all information provided in response to this Questionnaire is true and accurate to the best of my knowledge and belief.

Electronic Signature:

Signature Date

I understand that checking this box constitutes a legal signature confirming that I acknowledge and agree to the above Terms of Acceptance.

Execution of document by E-signature. By clicking on the check box, it indicates an electronic signature.

This is considered to be the legal equivalent of a manual or “wet” signature. Once signed electronically, this document is considered original and legally binding.

1-3b

CITY OF LOS ANGELES

PLEDGE OF COMPLIANCE WITH CONTRACTOR RESPONSIBILITY ORDINANCE

Los Angeles Administrative Code (LAAC) Section 10.40 et seq. (Contractor Responsibility Ordinance) provides that, unless specifically exempt, City contractors working under service contracts of at least $25,000 and three months, contracts for services and for purchasing goods and products that involve a value in excess of twenty-five thousand dollars ($25,000) and a term in excess of three months are covered by this Article; and construction contracts of any amount; public lessees; public licensees; and certain recipients of City financial assistance or City grant funds, shall comply with all applicable provisions of the Ordinance. Upon award of a City contract, public lease, public license, financial assistance or grant, the contractor, public lessee, public licensee, City financial assistance recipient, or grant recipient, and any its subcontractor(s), shall submit this Pledge of Compliance to the awarding authority.

The contractor agrees to comply with the Contractor Responsibility Ordinance and the following provisions:

(a) To comply with all federal, state, and local laws in the performance of the contract, including but not limited to laws regarding health and safety, labor and employment, wage and hours, and licensing laws, which affect employees.

(b) To notify the awarding authority within 30 calendar days after receiving notification that any governmental agency has initiated an investigation which may result in a finding that the contractor did not comply with any federal, state, or local law in the performance of the contract, including but not limited to laws regarding health and safety, labor and employment, wage and hours, and licensing laws, which affect employees.

(c) To notify the awarding authority within 30 calendar days of all findings by a governmental agency or court of competent jurisdiction that the contractor has violated any federal, state, or local law in the performance of the contract, including but not limited to laws regarding health and safety, labor and employment, wage and hours, and licensing laws which affect employees.

(d) If applicable, to provide the awarding authority, within 30 calendar days, updated responses to the Responsibility Questionnaire if any change occurs which would change any response contained within the Responsibility Questionnaire and such change would affect the contractor’s fitness and ability to continue the contract.

(e) To ensure that subcontractors working on the City agreement (including contractors or subcontractors of a public lessee, licensee, sublessee, or sublicensee that perform or assist in performing services on the leased or licensed premises) shall comply with all federal, state, and local laws in the performance of the contract, including but not limited to laws regarding health and safety, labor and employment, wage and hours, and licensing laws, which affect employees.

(f) To ensure that subcontractors working on the City agreement (including contractors or subcontractors of a public lessee, licensee, sublessee, sublicensee that perform or assist in performing services on the leased or licensed premises) submit a Pledge of Compliance.

(g) To ensure that subcontractors working on the City agreement (including contractors or subcontractors of a public lessee, licensee, sublessee, or sublicensee that perform or assist in performing services on the leased or licensed premises) shall comply with paragraphs (b) and (c).

Failure to complete and submit this form to the Awarding Authority may result in withholding of payments by the City Controller, or contract termination.

Company Name, Address and Phone Number

Signature of Officer or Authorized Representative Date

Print Name and Title of Officer or Authorized Representative

Awarding City Department Contract Number

SRIS/CRO-3, Pledge of Compliance (Rev. 5/07/2014)

1-3c

07/12/17 1-4

SIGNATURE SHEET AND AFFIDAVIT

I/We, depose and say that I am/We are ________ _ ___ __ Insert Name(s)

__ of ________________________________________________ (Insert "Sole Owner", "Partner", "President", etc.) (Insert firm name and address of bidder)

Contractor's License No. License Classification Expiration Date .

who submit this proposal to the Board of Public Works and hereby declare:

(1) That I/We have read this proposal and have abided by and agree to the conditions herein and have carefully examined the project plans and read the specifications and I/We hereby propose to furnish all materials and do all the work required to complete the work in accordance with the plans and specifications, for the unit prices or lump sums named in the Schedule of Work and Prices. Furthermore, I/WE have read and understand Ordinance No. 173677 of the “Determination of Contractor Responsibility Policy” of the City of Los Angeles and I/WE understand my/our obligations under this policy as a bidder and as a contractor should this contract be awarded to my/our firm.

(2) That this proposal is genuine, and not sham or collusive, nor made in the interest or in behalf of any person not herein named, and that I/We have not directly or indirectly induced or solicited any other bidder to put in a sham bid, or any other person, firm or corporation to refrain from bidding, and that I/We have not in any manner sought by collusion to secure for myself/ourselves an advantage over any other bidder.

(3) This contract is expressly made for the benefit of the signatory parties only. It is not the intent of any of the signatory parties to create or discharge any duty, express or implied, to any party other than the signatory parties. Any benefit derived from this contract by a third party is unintended and incidental to the purpose for which this contract is made.

(4) That I/We as principal(s), acknowledge myself/ourselves as being bound by the accompanying Bid Bond when completed by the Surety.

(5) That I have read and understand the provisions of the Pollution Control – Sewage Spill Prevention and Response Requirements and the Board of Public Work’s Policy of “Zero Sanitary Sewer Overflows” requirements as contained in this Proposal. If awarded this contract, I/ We agree to furnish all of the materials, supplies, tools, equipment, labor and other services necessary for the containment and clean up of any sewage or other pollutants spills or leaks occurring during the performance of this contract. I/WE further agree to act immediately, without instructions from City staff, to contain and clean up any spill in any way involved with my/ our activities on this project without concern for who or what caused the spill.

ADDENDA - This proposal is submitted with respect to the changes to the contract included in Addenda numbers:

(Fill in Addenda received) __________,__________,__________,__________,__________,__________,__________, I/We certify or declare under penalty of perjury that the foregoing is true and correct, and that if only one signature is provided, it is provided in accordance with Note 8 in the General Instructions and Information for Bidders of this proposal.

1.

Name Signature Title Date

2.

Name Second Signature Title Date

Note: ALL SIGNATURES MUST BE PROPERLY COMPLETED AND WITNESSED

BY A NOTARY

1-5

LIST OF SUBCONTRACTORS

In accordance with provisions pertaining to listing of Subcontractors, the bidder shall list herein each first tier Subcontractor to whom it proposes to subcontract portions of the work in an amount in excess of one half of one percent of the total bid or $10,000.00, whichever is greater.

NAME, BUSINESS ADDRESS, TELEPHONE NUMBER

AND SUBCONTRACTOR’S LICENSE NUMBER

DESCRIPTION OF PORTION

OF WORK SUBCONTRACTED

LICENSE # EXP. DATE

DIR#

SUBCONTRACTORS / SUBCONTRACTOR SUBSTITUTIONS

Contractor __________________________________________________________________________

Acceptance by the City of Los Angeles Board of Public Works of this Contractor's Bid does not indicate automatic approval of the subcontractor(s) listed in the Bid-proposal.

By acknowledging with the signature of an authorized representative below, the Contractor understands that it must obtain approval for all Subcontractors, at all levels, whether Bid-Listed or not, from the SRI Section of the General Services Division of the Bureau of Contract Administration (BCA) prior to the Subcontractor(s) performing any work on this project.

The Contractor understands that no entity other than the SRI Section of BCA has the authority to approve either an original request for approval or request for substitution of any subcontractor(s).

The Contractor further understands that Subcontractors approved for work on any other project for the City of Los Angeles does not constitute approval to work on this project also, and that there are no "blanket approvals" of Subcontractors for this, or any other, project.

The Contractor also understands that it may not substitute any Subcontractor, at any level, whether Bid-listed or not, without the approval of the SRI Section of BCA acting on behalf of the Board of Public Works.

The Contractor understands and acknowledges that there shall be a penalty assessed of no more than ten (10) percent of the subcontract amount of each Subcontractor for any of the following:

1. Failure to obtain approval for any Subcontractor(s), at any level, whether Bid-listed or not, from the SRI Section of BCA prior to the subcontractor(s) beginning work on the project.

2. Performing the work of any subcontractor(s) at any level, whether Bid-listed or not, without the approval of the SRI Section of BCA.

3. Reducing the Bid-listed and/or approved dollar amount of work to be performed by any Subcontractor(s), at any level, whether Bid-listed or not, for any reason, without the approval of the SRI Section of BCA.

4. Substituting for any Subcontractor(s), at any level, whether Bid-listed or not, without the approval of the SRI Section of BCA acting on behalf of the Board of Public Works.

5. Assigning the work of any Subcontractor(s), at any level, whether Bid-listed or not, to anyone other than said Subcontractor, without the approval of the SRI Section of BCA.

Authorized Contractor Representative (Print Name) Authorized Contractor Representative Signature

Date

1-6

07/03/06 1 - 7

CERTIFICATION OF COMPLIANCE WITH CHILD SUPPORT OBLIGATIONS

The undersigned hereby agrees that will:

Name of Business

1. Fully comply with all applicable State and Federal employment reporting requirements for its employees.

2. Fully comply with and implement all lawfully served Wage and earnings Assignment Orders and Notices of Assignment.

3. Certify that the principal owner(s) of the business are in compliance with any Wage and Earnings Assignment Orders and Notices of Assignment applicable to them personally.

4. Certify that the business will maintain such compliance throughout the terms of the contract.

5. This certification is a material representation of fact upon which reliance was placed when the parties entered into this transaction.

6. The undersigned shall require that the language of this Certification be included in all subcontracts and that all subcontractors shall certify and disclose accordingly.

Upon signing below, the bidder by his/her signature affixed hereto declares under penalty of perjury that he/she has read the Child Support Assignment Orders contained in the City’s Ordinance No. 172401 and accepts all the City’s requirements contained therein throughout the duration of this project.

Signature Title

Company Name

Date

Part II (Not Used)

Part III (Not Used)

PART IV

4-1 On-Call Rev. 5/28/2024

PROPOSAL - PART IV

GENERAL INSTRUCTIONS AND INFORMATION FOR BIDDERS

1. INSTRUCTIONS TO BIDDERS

a. Submit your bid in a sealed envelope addressed to the Board of Public Works; 200 N.

Spring Street, Room 355; Los Angeles, California 90012. All envelopes must show the project title and the bidder's name and address, with "BID ENCLOSED" indicated in bold letters, and must be received at the above address not later than the time and date designated on Page 1-1 of the bid proposal. Bidders shall use a separate sealed envelope for each bid submitted. Bidders are invited to be present for opening of bid proposals at the above address, at the time indicated above. No facsimile, telegraphic or telephonic bids, or telegraphic modifications of bids will be accepted.

b. State in numerical figures the unit prices, lump sum prices and extensions for item totals as indicated. These shall be the prices for which you propose to supply all materials and services and perform all work required by the contract documents; including, but not limited to, plans, specifications and addenda. All items described are to be construed as complete and in place.

c. Fill in all indicated blanks on the Schedule of Work and Prices. Initial all changes. Any omission(s) will render the proposal irregular and may cause its rejection, unless the omission(s) can be calculated by the City in accordance with d. or e. below.

d. Both the Unit Price and Item Total must be entered for each bid item listed on the Schedule of Work and Prices. The amount of your bid for this proposal shall be a sum of the Item Totals for all bid items. If Unit Prices are left blank and/or Item Totals are left blank, such omissions will be evaluated in the manner set forth below:

1) In the situation when the Unit Price is left blank, but the Item Total for that item is shown, the Unit Price will be calculated by dividing the Item Total for the item by the number of units.

2) In the situation when the Unit Price is listed, but the Item Total for that item is left blank, the Item Total price for the item will be calculated by multiplying the Unit Price by the number of units.

3) In the situation when the Item Total for one item is left blank and the Unit Price for that same item is also left blank, and all other Item Totals and the Total Bid Amount have been filled in, then the value of that Item Total will be calculated by totaling all Item Totals and subtracting their value from the Total Bid Amount. Thereafter the Unit Price can be calculated as described in d.1, above, if necessary.

4) In the situation when more than one Item Total is left blank and the value of the blank items cannot be calculated in the manner described in d.2, above, the bid shall be found to be irregular and rejected as non-responsive.

GENERAL INSTRUCTIONS AND

INFORMATION FOR BIDDERS (CONTINUED)

4-2

5) In the situation when only the Total Bid Amount for the project is left blank, and/or, if in addition, any lump sum total for an item(s) is left blank, but is capable of calculation as described in d.2, above, and/or, if in addition the Unit Price of any item(s) is left blank, but is capable of calculation as described in d.1, above, then the Total Bid Amount will be calculated by the City.

e. In case of discrepancy between the Unit Price and the Item Total for a bid item, the Unit Price shall prevail. However, if the Unit Price or the Item Total is ambiguous, unintelligible, and/or identical to the entry in the Item Total column, or uncertain for any cause, then both Unit Price and the Item Total shall be considered by the City as a blank and calculated as described in d.1, d.2, d.3, or d.5, above, whenever possible. Should more than one Item Total be ambiguous, unintelligible, and/or identical to the entry in the Unit Price column, then the provisions of d.4, above, shall govern.

f. In the situation of a lump sum basis bid item, when such bid item is the only bid item on the Schedule of Work and Prices, the Total Bid Amount shall prevail in all cases. The Total Bid Amount shall be shown in figures and also spelled out (in words). If any discrepancy exists between the price in figures and the price spelled out for the Total Bid Amount, the spelled out price shall prevail. If there is a discrepancy between the Total Bid Amount shown in figures and the price spelled out is ambiguous, unintelligible or omitted, then the bid shall be found to be irregular and rejected as non-responsive.

g. By submitting a bid for this project, the City will presume that the bidder has: (1) personally visited the site where the work is to be performed and the vicinity surrounding the site where the work is to be performed prior to submitting its bid to the City; and (2) ascertained the existence of any surface or subsurface conditions affecting the cost of the work. Based upon this presumption, the bidder cannot raise or claim any additional compensation for any surface or subsurface conditions affecting the cost of the work which were obvious had the bidder visited the site where the work was to be performed and the vicinity surrounding the site where the work was to be performed. (NOTE: The Project Location listed on the first page of the Proposal indicates the map page and grid location of the project taken from the current edition of the Thomas Guide available to City staff on the date the project was advertised for bids. This is a map reference location for internal City information purposes only and any mistakes or changes caused by newer editions of the Thomas Guide shall not be considered grounds for protest. It is each bidder's responsibility to personally visit the site where the work is to be performed and ascertain its location and not rely solely upon the Project Location indicated in the Proposal).

h. Do not change the wording on any pre-printed dollar amounts on the Schedule of Work and Prices. Any additions, deletions, conditions, limitations, provisions or unbalanced bid by the bidder will render the proposal irregular and may cause its rejection.

i. A pre-printed Unit Price or Item Total on the Schedule of Work and Prices is considered an allowance or fixed cost at the time of bid. The City will use the pre-printed amounts in computing the final Total Bid Amount.

j. The City reserves the right to recalculate all Total Bid Amounts. If the City’s recalculation results in any amount that is different from the Total Bid Amount submitted by any bidder, the City's calculations shall prevail.

4-3

2. BID PROTEST PROCEDURES - The purpose of these procedures is to provide a method for resolving, prior to award, protests regarding the award of construction contracts by the City, by and through its Board of Public Works. These procedures are for the benefit of the City and are not intended to establish an administrative requirement which must be exhausted by the protesting bidder prior to pursuing any legal remedy which may be available. For this reason, no bidder shall have any right to due process, should the City fail to follow these procedures for any reason within its discretion. However, failure by a bidder to follow the protest procedures as discussed below will create the presumption that any subsequent legal action in a court of competent jurisdiction is of no merit. These procedures will enable the Board of Public Works to ascertain all of the facts necessary to make an informed decision regarding the award of the contract.

a. A protest relative to a particular bid must be submitted in detail and in writing via email to

Arsen Voskerchyan at eng.plandist@lacity.org within one (1) working day after the receipt of bids no later than 4 p.m.

b. All protests must be addressed to: Arsen Voskerchyan, Department of Public Works, Bureau of Engineering, Project Award and Control Division, 1149 S. Broadway, Suite 140, Los Angeles, CA. 90015.

3. BID PACKAGE – Complete sets of bid documents, including all addenda, if issued, are available to interested parties for downloading through the City of Los Angeles Regional Alliance Marketplace for Procurement (www.RAMPLA.org).

If any bidders have any questions in regards to obtaining the bid documents for this project from the Los Angeles Regional Alliance Marketplace for Procurement (www.RAMPLA.org), email the Project Manager at elaine.lei@lacity.org.

Bidders are advised that the Board of Public Works has not authorized any other agency, internet service, or plan room distributor other than the City of Los Angeles Regional Alliance Marketplace for Procurement (www.RAMPLA.org) to distribute or sell bid documents for this project. Bidders are therefore further advised that submission of a bid on documents other than those obtained from the City of Los Angeles Regional Alliance Marketplace for Procurement may cause the bid to be deemed non-responsive.

4. STANDARD SPECIFICATIONS AND STANDARD PLANS - The Standard Specifications and

Standard Plans may be purchased from Building News, Inc. (BNI), 10801 National Blvd., Los Angeles, CA 90064, or at BNI, 1612 S. Clementine St., Anaheim, CA 92802, telephone (714) 517- 0970. Standard Plans can be viewed via the internet at http://eng.lacity.org/techdocs/stdplans/.

5. RESERVED

6. BID REJECTION - The Board of Public Works (Board) reserves the right to reject any or all bids and to waive any irregularities or informalities in any bid or in the bidding and to make awards in the best interest of the City.

7. RESERVED

mailto:eng.plandist@lacity.org http://www.rampla.org/ http://www.rampla.org/ mailto:elaine.lei@lacity.org http://www.rampla.org/

4-4

8. SIGNATURE SHEET AND AFFIDAVIT (PAGE 1-4) - Each proposal must have thereon, or attached thereto, the affidavit of the bidder that such proposal is genuine, and not sham or collusive, or made in the interest or in behalf of any person not therein named; and that the bidder has not directly, or indirectly, induced or solicited any other bidder to put in a sham bid, or any other person, firm or corporation to refrain from bidding; and that the bidder has not in any manner sought, by collusion, to secure for himself an advantage over any other bidder.

Any bid not accompanied by, or which is made without such affidavit, or in violation thereof, will not be considered and is rejected as a matter of law. If the bidder is a corporation, said affidavit must be signed by a duly authorized officer or officers of the corporation in accordance with subsection “d.” below. Any bidder making a false affidavit may be excluded from future bidding.

Proper Required Signature(s) for Bidder (Note - Failure to provide the proper required signature(s) for contract documents with bid may render the bid non-responsive):

a. Individual (Individual DBA [Name of Company] Etc.,): Individual must sign.

b. Partnership: One general partner must sign.

c. Joint Venture: All joint venturers must sign, by an individual authorized to sign for each joint venturer.

d. Corporation: 1) Two signatures: One by chairman of Board of Directors, President, or a Vice President and one by Secretary, Assistant Secretary, Chief Financial Officer or an Assistant Treasurer.

2) One signature of a Corporate-designated individual together with a properly attested resolution of the Board of Directors authorizing the individual to sign.

9. RESERVED

10. RESERVED

11. CONTRACT EXECUTION - The successful bidder shall provide two good and sufficient surety bonds. The Payment Bond and Performance Bond shall each be for 100% of the contract price. It is the intention of the Board of Public Works to issue a Notice to Proceed for this project as expeditiously as possible. Therefore, it is requested that acceptable bonds and insurance documents be submitted within five (5) working days after award to: TJ Knight, Executive Officer, Board of Public Works, 200 N. Spring St., Room 355, Los Angeles, CA 90012.

12. COMMENCEMENT AND COMPLETION OF WORK - The work must be completed within the allowed number of days specified on Page 1-1 of this proposal. Counting of days will commence on the actual date work is started, but in no event will counting commence later than the first

4-5 working day after issuance of the Notice to Proceed.

13. RESERVED

14. SUBMISSION OF FORMS TO THE CITY'S OFFICE OF CONTRACT COMPLIANCE:

a. "Ethnic Composition of Work Force Report" shall be submitted monthly for all time worked on the project.

b. Certified weekly payroll records shall be submitted, to the City's Office of Contract

Compliance by the Prime Contractor and all Subcontractors performing work on the project, regardless of dollar amount or type of contract. These payroll records shall be submitted to the Office of Contract Compliance, 1149 S. Broadway, Suite 300; Los Angeles, CA 90015.

These forms will be supplied to the successful bidder. The period covered shall be from the time work starts until all work is completed on the project. Failure to submit said certified payrolls on time may result in the withholding of progress or retention payments to the Prime Contractor and the assessment of penalties as set forth in the California Labor Code.

15. PREVAILING WAGES - Any contract awarded hereunder will require the Contractor to comply with the provisions of the Labor Code of the State of California, relating to Public Works wages.

Information regarding prevailing wage rates may be obtained from the Division of Labor Statistics and Research, Prevailing Wage Unit, P.O. Box 420603, San Francisco, CA 94142, Telephone

(415) 972-8628, Fax (415) 972-8640.

The following categories are covered under prevailing wage laws:

. Offsite truck hauling;

. Geotechnical/geological work;

. Inspection; and . Testing work;

16. RESERVED

17. RESERVED

Senate Bill 854

1. All contractors and subcontractors who bid, or work on a public works project must register with the state and pay an annual fee of $300.00 to the Department of Industrial Relations (DIR). In order to register, contractors must have valid workers compensation insurance; they must not have any outstanding assessments owed to either the state or any other warding body, or to any workers; and they cannot be debarred on any list (either federal, state, or local).

2. No contractor or subcontractor may be listed on a bid proposal (submitted on or after March 1, 2015) for a public works project unless they are registered with the DIR pursuant to Labor Code Section 1725.5.

3. No contractor or subcontractor may be awarded a contract on a public works project (awarded on or after April 1, 2015) unless they are registered with the DIR pursuant to Labor Code Section 1725.5.

4. No contractor or subcontractor may work on a contract on a public works project (bid on or after

March 1, 2015, or awarded on or after April 1, 2015) unless they are registered with the DIR.

5. An awarding body may not accept a bid or enter into a contract for public works with an unregistered contractor.

6. The DIR maintains a current list of registered contractors at:

https://efiling.dir.ca.gov/PWCR/Search.action.

7. While the new law does require that all contractors and subcontractors must furnish electronic certified payroll records (ECPR) directly to the Labor Commissioner’s Office, contractors and subcontractors working on City of Los Angeles public works projects (as well as those working for three other select awarding bodies, and projects covered by qualifying project labor agreements) are exempt from this requirement. (Note: Any contractor working on a project for a City department or agency which does not utilize the Bureau of Contract Administration’s services must submit their payrolls through the state’s ECPR system to the Labor Commissioner’s Office and submit the project to the state for monitoring and enforcement. The new law will apply to any project awarded by a City department for constriction, alteration, installation, demolition, maintenance, or repair.

8. Violation of the requirements mandated by SB 854 will result in any public works contract entered into with any contractor or subcontractor who has not registered being subject to cancellation.

9. A contractor who fails to pay the renewal fee on or before the expiration of the prior period of registration shall be prohibited from bidding on or engaging in the performance of any contract for the public work until they are once again registered. If the failure to pay the renewal fee was inadvertent, the contractor may renew its registration retroactively by paying an additional penalty renewal fee equal to the amount of the renewal fee within 90 days of the due date of the renewal fee. (If the original renewal fee was $300.00, the total amount for renewal including the penalty renewal fee would be $600.00.)

10. If the renewal fee is paid subsequent to 90 days, the contractor will be eligible to bid on public works projects again only if they pay an additional nonrefundable penalty registration fee of $2,000.00 in addition to the annual registration fee (if the original renewal fee was $300, the total amount for renewal including the penalty renewal fee would be $2,300.00).

Form Gen. 146 (Rev. 6/12)

Required Insurance and Minimum Limits

Name: Date:

Agreement/Reference:

Evidence of coverages checked below, with the specified minimum limits, must be submitted and approved prior to occupancy/start of operations. Amounts shown are Combined Single Limits ("CSLs"). For Automobile Liability, split limits may be substituted for a CSL if the total per occurrence equals or exceeds the CSL amount.

Limits

Workers' Compensation (WC) and Employer's Liability (EL) WC Statutory

EL

Waiver of Subrogation in favor of City Longshore & Harbor Workers

Jones Act

General Liability

Products/Completed Operations Sexual Misconduct

Fire Legal Liability

Automobile Liability (for any and all vehicles used for this contract, other than commuting to/from work)

Professional Liability (Errors and Omissions)

Discovery Period

Property Insurance (to cover replacement cost of building - as determined by insurance company)

All Risk Coverage Boiler and Machinery Flood Builder's Risk Earthquake

Surety Bonds - Performance and Payment (Labor and Materials) Bonds

Crime Insurance

Other:

9/15/2026

"Whittier Boulevard (2735) Bulkhead", W.O. E1909319

1,000,000

City must be listed as additional insured on General Liability Policy 1,000,000

1,000,000

12 Months after completion or termination of contract

100% of the contract price

Sent to Elaine Lei @ BOE

Pollution Liability

CITY OF LOS ANGELES

INTERDEPARTMENTAL CORRESPONDENCE

Date: August 13, 2025

To: Board of Public Works Bureau of Street Services Bureau of Contract Administration Department of Transportation

Deputy City Engineers Central, West Los Angeles, Valley, and Harbor Districts

From: Christine Sotelo, Central District Engineer

Subject: 2025 HOLIDAY SEASON STREET CLOSURE RESTRICTIONS

Attached is a copy of a Notice with the list of streets on which lane closures will be prohibited on November 26-30, December 5-7, December 12-28, 2025 and January 1, 2026. Please review the list of streets in your district.

In some cases, these holiday restrictions may be waived for short-term work such as a service connection, a public safety emergency, or for an activity that the Council District Office deems “Business Friendly” or a necessity. Therefore, in an effort to expedite processing in these particular situations, the appropriate District Engineer will have the discretion to waive the restrictions for short-term (one day or less) work and public safety emergencies.

Central District 201 North Figueroa St., 3rd Floor Los Angeles, CA 90012 Amy Shum amy.shum@lacity.org

Harbor District 638 South Beacon St., Suite 402 San Pedro, CA 90731 David Perez dave.perez@lacity.org

Valley District 6262 Van Nuys Blvd, Suite 351 Van Nuys, CA 91401 Jennifer Lee jennifer.k.lee@lacity.org

West Los Angeles District 1828 Sawtelle Blvd, 3rd Floor West Los Angeles, CA 90025 Oscar Gutierrez oscar.gutierrez@lacity.org

- 2 -

In other cases, the restriction should only be waived with concurrence of the Council District Office with a follow-up memo sent to the President of the Board of Public Works.

Additional information regarding the Holiday Moratorium, including procedures for submitting a request for a Holiday Moratorium Exemption can be found online at the Customer Portal at: https://engpermits.lacity.org.

If you have any questions, please contact Amy Shum at amy.shum@lacity.org.

CS/AS:as IDC – Holiday Restrictions Memo 2025 Attachments

Notice August 13, 2025 Notice No. 13

To All: Senior Managers Division Engineers District Engineers

Subject: HOLIDAY SEASON STREET CLOSURE RESTRICTIONS

In accordance with the Board of Public Works policy in effect for many years, no permits shall be issued for work during the holiday season on certain city streets in an attempt to minimize the impact on shoppers and retail businesses. Accordingly, permits shall be limited to emergency work on the attached lists of streets on November 26-30, December 5-7, December 12-28, 2025 and January 1, 2026. In addition, every effort shall be made to prevent blockage of these streets for any other reason during that period.

( VCA CS )

Attachments

CEN/CS/CL/AS/gva

Notice No. 13

Approved By:

Christine Sotelo, PE District Engineer, Central District

HOLIDAY SEASON EXCAVATION RESTRICTIONS

2025 CENTRAL DISTRICT

DOWNTOWN LOS ANGELES AREA:

2025 CENTRAL DISTRICT

STREET LIMITS

Alvarado Street Glendale Boulevard to Hollywood Fwy.

Barham Boulevard Cahuenga Boulevard to South Coyote Cyn Rd.

Beverly Boulevard La Brea Avenue to San Vicente Boulevard

Broadway (North) Mission Rd. to Interstate 5

Cahuenga Boulevard Santa Monica Boulevard to Lankershim Boulevard

Cesar E Chavez Avenue Interstate 5 to Evergreen Avenue

Colorado Boulevard Figueroa Street to Glendale City Boundary

Crescent Heights Boulevard Sunset Boulevard to San Vicente Boulevard

Fairfax Avenue Beverly Boulevard to 3rd Street

Fairfax Avenue Melrose Avenue to Olympic Boulevard

Figueroa Street Colorado Boulevard to Neola Street

First Street Soto Street to Highway 101

Fletcher Drive Interstate 5 to Glendale Boulevard

Franklin Avenue Western Avenue to Highland Avenue

Eagle Rock Boulevard Colorado Boulevard to Yosemite Drive

Glendale Boulevard Glendale Fwy. to Alvarado Street

Glendale Boulevard Fletcher Drive to Silverlake Boulevard

Glendale Boulevard Glenfeliz Boulevard to Glendale City Boundary

Highland Avenue Hollywood Fwy. to Santa Monica Boulevard

Hollywood Boulevard Sunset Boulevard to La Brea Avenue

Huntington Drive Van Horne Avenue to Eastern Avenue

Hyperion Avenue Rowena Avenue to Tracy Street

La Brea Avenue Franklin Avenue to Olympic Boulevard

La Cienega Boulevard Romaine Street to 18th Street

Larchmont Boulevard Melrose Avenue to 1st Street

2025 CENTRAL DISTRICT (continued)

Los Feliz Boulevard Western Avenue to Glendale City Boundary

Melrose Avenue La Brea Avenue to Fairfax Avenue

Melrose Avenue Vermont Avenue to Croft Avenue

Olympic Boulevard Alvarado…

This is the start of the file's text. The full file is on GovTribe.