WEFA_256757A_SOW.docx
DOCX document 173 KB Posted
- Attached to
- HACE - FY22 CONTRACT OBJECT ASST CONSERVATOR Federal contract opportunity
- Solicitation number
- 140P4222Q0072
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q___A_0001.docx | DOCX document | |
| Sol_140P4222Q0072_Amd_0001.pdf | ||
| Evaluation_Factors.docx | DOCX document | |
| RICH_SOW.docx | DOCX document | |
| LOWE_SOW.docx | DOCX document | |
| FLNI_SOW.docx | DOCX document | |
| EDIS_SOW.docx | DOCX document | |
| Sol_140P4222Q0072.pdf | ||
| Wage_Determination_WD_15-4035_Rev_22_LOWE.pdf | ||
| Wage_Determination_WD_15-5793_Rev_21_FLNI.pdf | ||
| WEFA_246043A_SOW.docx | DOCX document | |
| Wage_Determination_WD_15-4113_Rev_23_WEFA.pdf | ||
| Wage_Determination_WD_15-4331_Rev_21_RICH_MAWA.pdf | ||
| Price_Schedule.pdf | ||
| Wage_Determination_WD_15-4211_Rev_21_EDIS.pdf | ||
| MAWA_SOW.docx | DOCX document | |
| Statement_of_Work.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope / Statement of Work (SOW) WEFA: Conserve Original Weir Furniture for Visitor Exhibit
PMIS 256757A
Table of Contents
1.0 Project Description / Summary
2.0 Objectives
3.0 Background
4.0 Specific Work / Tasks
5.0 Optional Work / Tasks
6.0 Government Furnished Equipment / Materials / Other
7.0 Special Conditions / Requirements
8.0 Place of Performance
9.0 Performance Period / Schedule Requirements
Scope / Statement of Work
Task Order / Project Title:
Conserve Original Weir Furniture for Visitor Exhibit
Park / Park Unit:
Weir Farm National Historical Park
| Order#: |
| TBD |
| Prepared By: |
| Karen Fix |
| Date: |
| 12/10/2021 |
1.0 PROJECT DESCRIPTION / SUMMARY:
This project will provide conservation treatment by a qualified conservator for 10 pieces of historic, original furniture in the park’s collection. The treatment will consist of structural repairs, cleaning, conservation of unstable finishes & veneers, filling of losses, etc. Conservator will produce a full treatment report for each object including digital “before” and “after” photographs. All work will be performed in accordance with NPS and American Institute for Conservation standards.
2.0 OBJECTIVES:
2.1 The Historic Architecture, Conservation and Engineering Center (HACE) will hire a contract conservator to treat items as identified.
2.2 Contractor shall provide treatment proposals, treatment reports and surveys as needed by the government.
2.3 Contractor shall provide advice to the client on conservation issues (e.g. storage and exhibit questions, object condition observations, etc.) and participate in meetings as needed.
2.4 Contractor shall record and maintain records of treatments and surveys in conjunction with NPS guidelines/ protocols.
3.0 BACKGROUND:
The project follows the recommendations of a collection condition survey of furniture that had never been examined or treated before. Conservation of these furnishings has been identified by site superintendent and curatorial staff as a conservation priority. Treatment of these pieces will help the park meet goals to protect, maintain, and manage cultural resources.
The work will enable the objects to be exhibited and shared with the public as historic furnishings in the Weir House, Weir Studio and Young Studio, the centerpieces of the visitor experience at the park. Over 37,000 annual park visitors will be impacted by completion of this project as resources are conserved and made available for exhibition and interpretation.
4.0 SPECIFIC WORK / TASKS:
Major Duties and Responsibilities of Contractor
4.1 Conservation Laboratory Responsibilities:
· The contractor will be responsible for performing a wide variety of conservation treatments, including difficult and complex technical analysis, testing, and treatment necessary to conserve objects of historic and artistic value.
· The contractor will examine objects to determine the nature and cause of deterioration, and tests and selects appropriate conservation techniques for treatment
· The contractor will develop treatments in consultation with the park curators regarding final appearance and intended use of the object, and provides written documentation for the examination and condition analysis phase, treatment proposal phase, and following approval of the object’s custodian (usually the park curator through the park Superintendent), the final treatment phase in a comprehensive dossier for each object treated in the conservation laboratory, with complete photographic documentation of the object before and after treatment, and during treatment, if warranted.
· The contractor will draw from professional experience and practical research in selecting professionally established treatment techniques, and in developing new treatment methodologies, including selection of conservation solvents, reagents, compounds, materials and application techniques. Treatment procedures often involve extremely delicate techniques requiring highly developed hand skills and mature professional judgement in determining the appropriate extent of intervention, and the desired final appearance of extremely valuable and irreplaceable objects.
· The contractor will make contacts with parks for treatment scheduling and proposal review, and to make recommendations concerning collection care in the realm of both preventive and remedial conservation. Contacts are also made with parks as a result of their requests for conservation information or services. Contacts with NPS and non-NPS conservators are usually for the purpose of information acquisition or exchange.
· The contractor will be responsible for compliance with all OSHA and NIOSH regulations in laboratory operations by all personnel working in the laboratory.
4.2 On-site treatment projects:
· The contractor will assess the condition and treatment needs of objects on-site and develop treatment proposals.
· The contractor will submit written treatment proposals to the curator/superintendent for approval.
· The contractor will identify and arrange for procurement and scheduled delivery of conservation supplies necessary for on-site treatments. On-site treatments are primarily, but not limited to, treatment of outdoor sculptures, treatment of architectural finishes or ornamentation, treatment of large-scale sculptural plaster casts, and treatment of objects too large or too fragile to be transported to the HACE/Collections laboratory.
4.3 The following objects will be treated as part of this project:
| CATALOG # |
| DESCRIPTION, TREATMENT |
| HOURS TO TREAT |
| WEFA 2124 Wardrobe/Kas |
| Dutch 17th century style, carved oak kas. Treatment includes consolidating split; replacing small losses on front molding, stabilize and re-fill old darkened fill; clean and lightly inpaint; wax. |
| 80 |
| WEFA 2161 Wardrobe/Kas |
| Dutch style kas, 1883. Treatment includes repairing overall case structure which is currently not sound; consolidating splits, filling losses, clean, lightly inpaint, wax. |
| 120 |
| WEFA 2112, Mirror, Federal Giltwood Anablature |
| Treatment includes replacing loss to the plinth molding and in-gilded to blend well; consolidating scroll areas; replicating losses, clean. |
| 80 |
| WEFA 16281 Mirror |
| Mirror, original from cheval stand. Treatment includes matching the wood frame to the previously treated base, cleaning and re-saturating the finish, re-set back board. |
| 60 |
| WEFA 2103 Mirror |
| Mirror, Spanish, 18th century. Treatment includes consolidating flaking, infill, clean, touch up fills, polish. |
| 60 |
| TOTAL HOURS |
| 400 |
5.0 OPTIONAL WORK / TASKS NOT ON PMIS:
N/A
6.0 GOVERNMENT FURNISHED EQUIPMENT / MATERIALS / OTHER:
All supplies necessary to execute the treatment of this project will be provided by the HACE Object Treatment Laboratory and are included in the project cost.
7.0 SPECIAL CONDITIONS / REQUIREMENTS:
7.1 Contractor to adhere to all OSHA procedures and guidelines while in HACE Laboratory.
7.2 Contractor will consult with HACE Project Inspector during the project to ensure treatments are done in a timely and efficient manner.
7.3 Contractor to adhere to all local ordinances, such as, allowable work time and noise ordinances.
8.0 PLACE OF PERFORMANCE:
Historic Architecture, Conservation and Engineering Center Object Treatment Laboratory in Lowell, MA.
9.0 PERFORMANCE PERIOD / SCHEDULE REQUIREMENTS:
52-week period of performance. Start date September 2022.
9.1 Time
Regular Hours: The contractor shall provide coverage at the specified government sites during the hours of 8:00 A.M. to 4:30 P.M (core hours); Monday through Friday, except Federal holidays.
Overtime: Overtime will be authorized in emergency situations such as natural disasters and/or activation of the Northeast Region Continuity of Operations Plan (COOP). The COR will identify which tasks are necessary during this emergency and what personnel will be required to report to work or work additional hours.
Travel: Occasional travel is required to various sites in the Northeast Region.
9.2 Invoicing
Invoicing shall be in accordance with the DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements – Internet Payment Platform (IPP) (September 2011) – See Contract Administration Data (below) for the full clause. The Period of Performance (POP) for each invoice will be one calendar month based on actual hours worked, beginning with the start date of this contract. The contactor shall submit only one invoice per month. Timesheets will be verified by NPS Contracting Officers Technical Representative monthly prior to payment.
9.3 Standards and References
· NPS standards and procedures will be made available upon task initiation.
· All work performed will be within the standards of the American Institute for Conservation (AIC) Code of Ethics and Guidelines
One of the items for treatment: WEFA #2124 – Wardrobe Cabinet or Kas image1.jpg image2.jpeg