MAWA_SOW.docx

DOCX document 337 KB Posted

Attached to
HACE - FY22 CONTRACT OBJECT ASST CONSERVATOR Federal contract opportunity
Solicitation number
140P4222Q0072
Issued by
Department of the Interior National Park Service Northeast Region

View the file

Other files for this federal contract opportunity

Other files attached to HACE - FY22 CONTRACT OBJECT ASST CONSERVATOR, newest first.
File Type Posted
Q___A_0001.docx DOCX document
Sol_140P4222Q0072_Amd_0001.pdf PDF
Wage_Determination_WD_15-4211_Rev_21_EDIS.pdf PDF
Statement_of_Work.pdf PDF
Evaluation_Factors.docx DOCX document
WEFA_256757A_SOW.docx DOCX document
RICH_SOW.docx DOCX document
LOWE_SOW.docx DOCX document
FLNI_SOW.docx DOCX document
EDIS_SOW.docx DOCX document
Sol_140P4222Q0072.pdf PDF
Wage_Determination_WD_15-4113_Rev_23_WEFA.pdf PDF
Wage_Determination_WD_15-4331_Rev_21_RICH_MAWA.pdf PDF
Price_Schedule.pdf PDF
Wage_Determination_WD_15-4035_Rev_22_LOWE.pdf PDF
Wage_Determination_WD_15-5793_Rev_21_FLNI.pdf PDF
WEFA_246043A_SOW.docx DOCX document
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope / Statement of Work (SOW) MAWA: Perform Conservation Survey of Furniture Collection

PMIS 236899A

Table of Contents

1.0 Project Description / Summary

2.0 Objectives

3.0 Background

4.0 Specific Work / Tasks

5.0 Optional Work / Tasks

6.0 Government Furnished Equipment / Materials / Other

7.0 Special Conditions / Requirements

8.0 Place of Performance

9.0 Performance Period / Schedule Requirements

Scope / Statement of Work

Task Order / Project Title:

Perform Conservation Assessment and Treatment of MAWA Furniture Collection

Park / Park Unit:

Maggie L. Walker National Historic Site

Order#:
TBD
Prepared By:
Karen Fix
Date:
12/10/2021

1.0 PROJECT DESCRIPTION / SUMMARY:

This project will have conservators perform an object-specific furniture condition survey of approximately 155 pieces of original, cataloged wooden furniture from the Maggie L. Walker National Historic Site (MAWA) collection. In accordance with the completed survey, conservators will perform conservation treatment of selected items at a later date.

The survey methodology will include photographing object at a few angles, examining the object for signs of deterioration, and making notes on its condition as well as any environmental concerns that may detrimentally affect the object. The report will identify conservation problems, assign treatment priorities according to condition and significance of the objects, and recommend preventive conservation measures in terms of storage, exhibit, and appropriate housekeeping techniques.

2.0 OBJECTIVES:

2.1 The Historic Architecture, Conservation and Engineering Center (HACE) will hire a contract conservator to examine and assess conditions of items as identified.

2.2 Contractor shall provide treatment proposals, treatment reports and surveys as needed by the government.

2.3 Contractor shall provide advice to the client on conservation issues (e.g., storage and exhibit questions, object condition observations, etc.) and participate in meetings as needed.

2.4 Contractor shall record and maintain records of treatments and surveys in conjunction with NPS guidelines/ protocols.

3.0 BACKGROUND:

Maggie Lena Walker (1864-1934) is a nationally significant civil rights pioneer. Born into a slave society in the capital of the Confederacy, Walker grew up during Reconstruction and rose to prominence in the height of the Jim Crow era. As an outspoken community activist, a fraternal leader, newspaper editor, and the nation’s first African American female bank president, Walker championed civil rights advancement and gender equality through economic empowerment and education opportunities.

Walker’s success as a prominent businessperson afforded her an ability to decorate her home and dress her family in high style fashions at the turn of the 20th century. As a public figure, Mrs. Walker often showcased her material culture to illustrate her many accomplishments, in turn setting an example of hope and success for others in her struggling community. The Walkers’ eclectic furniture collection ranges from Victorian, Empire, Colonial Revival, and Art Deco styles and includes private pieces such as beds, wardrobes, and dressers as well as public pieces such as her piano, wheelchair, desks, bookshelves, settees, chairs, and dining room furniture. These furnishings are primarily exhibited in situ, within the Maggie L. Walker house museum, and thus form the backbone of the authentic interpretive and educational experience, offering a rare glimpse into black middle-class life against the backdrop of the Jim Crow South.

Despite its significance, the MAWA furniture collection has never had a thorough conditions survey. The majority of this furniture has been on public display since the site first opened in 1985 and the pieces exhibit instances of light damage, minor mold growth, past insect damage, warping, and surface cracking and peeling.

4.0 SPECIFIC WORK / TASKS:

Major Duties and Responsibilities of Contractor

4.1 Conservation Laboratory Responsibilities:

· The contractor will be responsible for performing a wide variety of conservation treatments, including difficult and complex technical analysis, testing, and treatment necessary to conserve objects of historic and artistic value.

· The contractor will examine objects to determine the nature and cause of deterioration, and tests and selects appropriate conservation techniques for treatment

· The contractor will develop treatments in consultation with the park curators regarding final appearance and intended use of the object, and provides written documentation for the examination and condition analysis phase, treatment proposal phase, and following approval of the object’s custodian (usually the park curator through the park Superintendent), the final treatment phase in a comprehensive dossier for each object treated in the conservation laboratory, with complete photographic documentation of the object before and after treatment, and during treatment, if warranted.

· The contractor will draw from professional experience and practical research in selecting professionally established treatment techniques, and in developing new treatment methodologies, including selection of conservation solvents, reagents, compounds, materials and application techniques. Treatment procedures often involve extremely delicate techniques requiring highly developed hand skills and mature professional judgement in determining the appropriate extent of intervention, and the desired final appearance of extremely valuable and irreplaceable objects.

· The contractor will make contacts with parks for treatment scheduling and proposal review, and to make recommendations concerning collection care in the realm of both preventive and remedial conservation. Contacts are also made with parks as a result of their requests for conservation information or services. Contacts with NPS and non-NPS conservators are usually for the purpose of information acquisition or exchange.

· The contractor will be responsible for compliance with all OSHA and NIOSH regulations in laboratory operations by all personnel working in the laboratory.

4.2 On-site treatment projects:

· The contractor will assess the condition and treatment needs of objects on-site and develop treatment proposals.

· The contractor will submit written treatment proposals to the curator/superintendent for approval.

· The contractor will identify and arrange for procurement and scheduled delivery of conservation supplies necessary for on-site treatments. On-site treatments are primarily, but not limited to, treatment of outdoor sculptures, treatment of architectural finishes or ornamentation, treatment of large-scale sculptural plaster casts, and treatment of objects too large or too fragile to be transported to the HACE/Collections laboratory.

4.3 Estimated time to complete this project is 90 hours. Objects to be included in the survey:

Catalog #
Object
Catalog #
Object
MAWA 1
SETTEE
MAWA 528
PEDESTAL
MAWA 2
CABINET, DISPLAY
MAWA 529
CHAIR
MAWA 3
TABLE
MAWA 534
SIDEBOARD
MAWA 52
CHAIR
MAWA 535
CHAIR
MAWA 55
SIDEBOARD
MAWA 538
COATRACK
MAWA 57
CABINET, MUSIC
MAWA 539
TABLE, WRITING
MAWA 61
SETTEE
MAWA 550
DESK
MAWA 65
TABLE
MAWA 551
CHAIR, DESK
MAWA 68
PIANO, BABY GRAND
MAWA 552
COATRACK
MAWA 70
CHAIR
MAWA 553
MIRROR, WALL
MAWA 71
HALLSTAND
MAWA 555
SOFA
MAWA 73
CHAIR, DINING
MAWA 556
CABINET, RADIO
MAWA 74
CHAIR, DINING
MAWA 557
BOOKCASE
MAWA 76
CHAIR
MAWA 560
BED, FOUR-POSTER
MAWA 77
CHAIR
MAWA 561
COMMODE
MAWA 78
CABINET, CHINA
MAWA 562
TABLE
MAWA 79
CHEST OF DRAWERS
MAWA 564
OTTOMAN
MAWA 82
CHAIR
MAWA 565
CHAIR
MAWA 83
CHAIR
MAWA 567
CHAIR
MAWA 84
TABLE, DINING
MAWA 568
TABLE
MAWA 90
TABLE
MAWA 580
BED, FOUR-POSTER
MAWA 91
CABINET, CHINA
MAWA 582
CHEST OF DRAWERS
MAWA 92
CABINET, CHINA
MAWA 584
CHEST OF DRAWERS
MAWA 93
BOOKCASE
MAWA 585
CHAIR, ROCKING
MAWA 94
BOOKCASE
MAWA 586
CHAIR
MAWA 95
BOOKCASE
MAWA 587
TABLE
MAWA 96
BOOKCASE
MAWA 588
BOOKCASE
MAWA 97
BOOKCASE
MAWA 589
WARDROBE
MAWA 98
BOOKCASE
MAWA 595
DAYBED
MAWA 159
SOFA
MAWA 766
CHAIR
MAWA 160
CHAIR, EASY
MAWA 767
CHAIR
MAWA 161
CHAIR
MAWA 768
TABLE, PIER
MAWA 165
TABLE
MAWA 798
MIRROR
MAWA 166
TABLE
MAWA 799
MIRROR
MAWA 167
TABLE
MAWA 834
CABINET, KITCHEN
MAWA 527
TABLE, WRITING
MAWA 841
TABLE
Catalog #
Object
Catalog #
Object
MAWA 843
TABLE
MAWA 6065
CHAIR
MAWA 844
CHAIR
MAWA 6066
CHAIR
MAWA 845
CHAIR
MAWA 6068
CHAIR, ROCKING
MAWA 846
CHAIR
MAWA 6069
BENCH
MAWA 847
CHAIR
MAWA 6070
CHAIR
MAWA 849
BED
MAWA 6071
CHAIR, EASY
MAWA 850
CHEST OF DRAWERS
MAWA 6074
BED
MAWA 851
CHAIR
MAWA 6104
CUP, CASTER
MAWA 852
WARDROBE
MAWA 6105
CUP, CASTER
MAWA 853
TABLE
MAWA 6106
CUP, CASTER
MAWA 854
CHAIR
MAWA 6122
CHAIR
MAWA 865
MIRROR, WALL
MAWA 6123
CHAIR
MAWA 3271
STOOL
MAWA 6136
MIRROR, WALL
MAWA 3414
STAND, SHAVING
MAWA 6137
MIRROR, WALL
MAWA 3563
CHEST OF DRAWERS
MAWA 6144
DESK
MAWA 3564
STOOL
MAWA 6150
DESK
MAWA 3567
PEDESTAL
MAWA 6377
BED
MAWA 3568
DESK
MAWA 6378
COATRACK
MAWA 3569
CHAIR
MAWA 6379
COATRACK
MAWA 3570
TABLE, DRESSING
MAWA 6380
CHAIR, FOLDING
MAWA 3571
BOOKCASE
MAWA 6383
COATRACK
MAWA 3572
WARDROBE
MAWA 6389
TABLE, CARD
MAWA 3702
CABINET
MAWA 6395
BED, SLEIGH
MAWA 3703
TABLE
MAWA 6402
TABLE, COFFEE
MAWA 3704
CHAIR
MAWA 6403
STOOL
MAWA 3705
CHAIR
MAWA 6405
TABLE
MAWA 3706
CHAIR
MAWA 6407
TABLE
MAWA 3707
TABLE
MAWA 6417
PEDESTAL
MAWA 3787
TABLE
MAWA 6418
PEDESTAL
MAWA 4226
WOOD, WORKED
MAWA 6419
TABLE
MAWA 5376
CHEST OF DRAWERS
MAWA 6421
CHAIR, ROCKING
MAWA 5378
CHEST OF DRAWERS
MAWA 6423
CHAIR, ROCKING
MAWA 5379
DESK, ROLLTOP
MAWA 6428
WHEELCHAIR
MAWA 5381
WARDROBE
MAWA 6429
HIGHCHAIR
MAWA 5382
WARDROBE
MAWA 6434
CHEST OF DRAWERS
MAWA 5440
CUP, CASTER
MAWA 6436
CHEST OF DRAWERS
MAWA 6060
CHAIR
MAWA 6748
SOFA
MAWA 6061
CHAIR
MAWA 6749
CHAIR
MAWA 6062
CHAIR, ROCKING
MAWA 6750
CHAIR
MAWA 6063
CHAIR, ROCKING
MAWA 6751
CHEST OF DRAWERS
MAWA 6064
CHAIR
MAWA 6776
TABLE, DRESSING
MAWA 6777
CHAIR

5.0 OPTIONAL WORK / TASKS NOT ON PMIS:

N/A

6.0 GOVERNMENT FURNISHED EQUIPMENT / MATERIALS / OTHER:

All supplies necessary to execute the treatment of this project will be provided in the HACE Object Treatment Laboratory and are included in the project cost.

7.0 SPECIAL CONDITIONS / REQUIREMENTS:

7.1 Contractor to adhere to all OSHA procedures and guidelines while in HACE Laboratory.

7.2 Contractor will consult with HACE Project Inspector during the project to ensure treatments are done in a timely and efficient manner.

7.3 Contractor to adhere to all local ordinances, such as, allowable work time and noise ordinances.

8.0 PLACE OF PERFORMANCE:

The survey will be carried out on-site at MAWA, with report-writing carried out at Historic Architecture, Conservation and Engineering Center in Lowell, MA.

9.0 PERFORMANCE PERIOD / SCHEDULE REQUIREMENTS:

52-week period of performance. Start date September 2022.

9.1 Time

Regular Hours: The contractor shall provide coverage at the specified government sites during the hours of 8:00 A.M. to 4:30 P.M (core hours); Monday through Friday, except Federal holidays.

Overtime: Overtime will be authorized in emergency situations such as natural disasters and/or activation of the Northeast Region Continuity of Operations Plan (COOP). The COR will identify which tasks are necessary during this emergency and what personnel will be required to report to work or work additional hours.

Travel: Occasional travel is required to various sites in the Northeast Region.

9.2 Invoicing

Invoicing shall be in accordance with the DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements – Internet Payment Platform (IPP) (September 2011) – See Contract Administration Data (below) for the full clause. The Period of Performance (POP) for each invoice will be one calendar month based on actual hours worked, beginning with the start date of this contract. The contactor shall submit only one invoice per month. Timesheets will be verified by NPS Contracting Officers Technical Representative monthly prior to payment.

9.3 Standards and References

· NPS standards and procedures will be made available upon task initiation.

· All work performed will be within the standards of the American Institute for Conservation (AIC) Code of Ethics and Guidelines

MAWA #52

MAWA #70

MAWA #76

image4.jpeg image1.jpg image2.jpeg image3.jpeg

File details come from the government source that posted it. Updated .