Statement_of_Work.pdf
PDF 115 KB Posted
- Attached to
- HACE - FY22 CONTRACT OBJECT ASST CONSERVATOR Federal contract opportunity
- Solicitation number
- 140P4222Q0072
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q___A_0001.docx | DOCX document | |
| Sol_140P4222Q0072_Amd_0001.pdf | ||
| Wage_Determination_WD_15-4035_Rev_22_LOWE.pdf | ||
| Wage_Determination_WD_15-5793_Rev_21_FLNI.pdf | ||
| WEFA_246043A_SOW.docx | DOCX document | |
| Evaluation_Factors.docx | DOCX document | |
| WEFA_256757A_SOW.docx | DOCX document | |
| RICH_SOW.docx | DOCX document | |
| LOWE_SOW.docx | DOCX document | |
| FLNI_SOW.docx | DOCX document | |
| EDIS_SOW.docx | DOCX document | |
| Sol_140P4222Q0072.pdf | ||
| Wage_Determination_WD_15-4211_Rev_21_EDIS.pdf | ||
| MAWA_SOW.docx | DOCX document | |
| Wage_Determination_WD_15-4113_Rev_23_WEFA.pdf | ||
| Wage_Determination_WD_15-4331_Rev_21_RICH_MAWA.pdf | ||
| Price_Schedule.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Object Conservation Contractor
January 2022
SCOPE OF WORK
The contractor will provide technical and project management support in the conservation of museum collections in parks throughout the Northeast Region at the Assistant Conservator level. Scope of conservation includes: preventative conservation, the execution of collection-wide conservation treatment plans and surveys for parks, conservation treatment and research, and conservation training.
The contractor will be a professionally trained conservator with experience in the conservation of historic furniture, furnishings, and historic objects.
WORK ENVIRONMENT
Work performed supports and directly effects personnel throughout the Northeast Region who share in the responsibilities of cultural resource preservation. Recommendations and assistance may cause changes in operation and funding at parks in the interest of museum collections care.
Work is performed in an office environment, a conservation laboratory and on-site. Report writing as well as many treatment tasks may include repetition of hand, wrist or shoulder movement. Lifting moderately heavy objects (30-45 lbs) and conservation equipment and supplies is often required.
Reagents, solvents and chemicals are used in the laboratory and personal protection apparatus such as gloves, a respirator, and goggles are worn when required. Work using certain solvents is carried out in a fume hood. On-site work may involve exposure to reagents, solvent, chemicals, mold, air-borne allergens. Work hours are typically Monday through Friday for 8 hours/day between 9:00 and 5:30 pm.
TASK DESCRIPTION
Major Duties and Responsibilities
Conservation Laboratory Projects:
• The contractor will be responsible for performing a wide variety of conservation treatments, including difficult and complex technical analysis, testing, and treatment necessary to conserve objects of historic and artistic value.
• The contractor will examine objects to determine the nature and cause of deterioration, conduct testing where necessary, and select appropriate conservation techniques for treatment.
• The contractor will develop treatments in consultation with the park curators and senior conservators in HACE regarding final appearance and intended use of the object. They will provide written documentation for the examination and condition analysis phase, treatment proposal phase, and, following approval of the object’s custodian (usually the park curator through the park Superintendent), the final treatment phase. All will be contained in a comprehensive dossier for each object treated in the conservation laboratory, with complete photographic documentation before and after treatment, and during treatment, if warranted.
• The contractor will draw from professional experience and practical research in selecting professionally established treatment techniques, and in developing new treatment methodologies, including selection of conservation solvents, reagents, compounds, materials and application techniques. Treatment procedures often involve extremely delicate techniques requiring highly developed hand skills and mature professional judgement in determining the appropriate extent of intervention, and the desired final appearance of extremely valuable and irreplaceable objects.
• The contractor will make contacts with parks for treatment scheduling and proposal review, and to make recommendations concerning collection care in the realm of both preventive and remedial conservation. Contacts are also made with parks as a result of their requests for conservation information or services. Contacts with NPS and non-NPS conservators are usually for the purpose of information acquisition or exchange.
• The contractor will be responsible for compliance with all OSHA and NIOSH regulations in laboratory operations by all personnel working in the laboratory.
On-site treatment projects:
• The contractor will assess the condition and treatment needs of objects on-site and will develop treatment proposals.
• The contractor will submit written treatment proposals to senior conservators for review.
• The contractor will identify and arrange for procurement and scheduled delivery of conservation supplies necessary for on-site treatments. On-site treatments are primarily, but not limited to, treatment of outdoor sculptures, treatment of architectural finishes or ornamentation, treatment of large-scale sculptural plaster casts, and treatment of furniture and furnishings too large or too fragile to be transported to the HACE Conservation laboratory.
Conservation survey responsibilities:
• As part of a team, or proceeding independently, undertake on-site conservation assessments of museum exhibit and storage facilities, and object-specific surveys of park collections, to include estimates for treatment hours. Results are entered into spreadsheets and documents to be provided to the park.
PROFESSIONAL DELIVERABLES
Contractor will be required to work on various projects that support the preservation of cultural resources in the Northeast Region as needed by the government.
Contractor shall provide treatment proposals, treatment reports and surveys as needed by the government.
Contractor shall provide advice to the client on conservation issues (e.g. storage and exhibit questions, object condition observations, etc.) and participate in meetings as needed.
Contractor shall record and maintain records of treatments and surveys in conjunction with
NPS guidelines/ protocols.
SKILLS REQUIRED
Prior experience relating to conservation treatment of historic collections located in National
Parks is preferred, therefore, any contractor personnel with such experience should be provided, as is reasonable.
Completion of a graduate program in conservation or the equivalent degree of knowledge and skill gained through formal apprenticeship programs with accredited museums and/or professionally recognized conservators through the American Institute for Conservation (AIC).
Graduate level degree in a related field such as art history, historic preservation, or fine arts, with coursework in architectural history, preservation, archaeology, or materials conservation.
Full professional knowledge of conservation theory, procedures, and techniques for the conservation of historic furniture and furnishings.
Knowledge and experience in high resolution digital tethered photography of museum objects.
General knowledge of professional standards of historic house museum operations.
Strong verbal and writing skills to enable the transmission of complex information to parks in an accurate, clear and concise manner.
Extensive knowledge of computer software programs such as Microsoft Office, Adobe
Photoshop, applications and spreadsheet programs such as Excel for creating and generating reports for conservation documentation and planning purposes.
Contractor Personnel Security and Suitability Requirements
A. National Agency Check and Inquires (NACI) Background Investigation
Before starting work under this contract, the contractor will need to have a basic NACI background investigation. Forms required to initiate this process will be provided to the
Contractor by the COR and must be returned to the COR to be provided to the Human
Resources Office to being the process. The Human Resources Office will provide the employee fingerprint forms which must be taken to a local police station for fingerprinting and returned to the Human Resources Office. The contractor will not be able to start work until notified that their fingerprints have been cleared. The employee will also need to complete the NPS IT security training and provide a printed copy of the completion certification prior to gaining access to NPS computers. This training takes 1-2 hours to complete.
B. Credentialing (PIV)
In addition to the basic NACI background and investigation, performance of this contract requires the contractor employee to have a Federal government-issued Personal Identity
Verification (PIV) credential to perform certain duties (routine, unsupervised access to
NPS networks). The cost is paid by the contractor and is approx. $350.00, amount subject to change. Completion of the approval process may take from 4 to 6 weeks.
During performance of the contract, the contractor must keep the COR appraised of changes in personnel to ensure that performance is not delayed by compliance with credentialing processes. Cards that have been lost, damaged, or stolen must be reported to the COR and Issuing Office within 24 hours. If reissuance of expired credentials is needed, the contractor must coordinate with the COR.
At the end of contract performance, or when a contractor employee is no longer working under this contract, the contractor must ensure that all identification cards are returned to the COR.
1. Credentialing Request
The Contracting Officer’s Representative (COR) is the requesting official and will make arrangements through the NPS Access Card sponsor for personal identity verification and
DOI Access Card issuance. The contractor must make their personnel available at the place and time specified by the COR or DOI Access Card sponsor in order to initiate the credentialing process. If an individual has already been credentialed by another agency through OPM, and that credential has not yet expired, further investigation may not be necessary. In that case, the contractor must provide the COR with documentation that supports the individual’s credentialed status.
2. Enrollment
When a valid email address has been created for the contractor employee, the process will begin for the DOI Access Card. The COR will request the email account and will notify the HR Specialist to begin the enrollment process in USAccess. The employee should receive an email within 15 to 30 minutes from HSPD- 12 and/or USAccess. When the email is received, the employee will need to follow the instructions to make an appointment and collect the types of identification required. Contractor employees will begin the enrollment process at https://app3.timetrade.com/tc/login.do?url=usaccess to find the most conveniently located enrollment center. Once this process is completed, the employee will receive an email stating that the card is ready for pick-up at the GSA location to certify and activate the card. The Human Resources Specialist (Adjudicator) will provide the information to USAccess to initiate this process.
3. Activation
Once the enrollment process begins, the employee will need to bring two pieces of identification to the Credentialing Center to start the activation process.
Contractor provided personnel will be required to follow all NPS and DOI computer security guidelines and requirements.
Contractor provided personnel will be required to read and sign the NPS document, “NPS
Responsibilities for Computer Use”, acknowledging their understanding of NPS computer security requirements.
Contractor and contractor provided personnel will be required to report all computer security related incidents to the NER Security Manager and/or appropriate staff.
All contractor provided personnel will be required to take annual Department of the Interior
(DOI) Security Training.
Contractor will also provide resumes or other documentation necessary to reasonably verify the credentials of the assigned personnel upon Government request. The Government reserves the right to approve or to disapprove of the assignment of any contractor personnel to provide services.
Government Furnished Resources
Facilities, Supplies, and Services
The National Park Service will provide office space, equipment, and software for the task for one contractor provided personnel. All government resources shall be returned to the client upon completion of this task.
Points of Contact
NPS Contracting Officer's Representative (COR):
Angela Campbell
Historic Architecture, Conservation & Engineering Center
Interior Region 1
115 John St, Lowell Ma 01852
978-970-5152
Angela_Campbell@nps.gov
NPS HACE Representative:
Richard Chilcoat
Historic Architecture, Conservation & Engineering Center
Interior Region 1
115 John St, Lowell Ma 01852
978-970-5167
Richard_chilcoat@nps.gov
Period of Performance
Period of Performance is for 52 weeks, estimated at September 2022 through August 2023.
Contractor will provide a firm fixed price quote for personnel to provide services for all conservation tasks described herein during the hours listed below.
Place of Performance
The primary duty location is office at Boott Mill, 115 John Street, Lowell, MA. Occasional site visits will be required to Northeast Region Parks.
Hours
Regular Hours: The contractor shall provide coverage at the specified government sites during the hours of 8:00 A.M. to 4:30 P.M (core hours); Monday through Friday, except
Federal holidays.
Overtime: Overtime will be authorized in emergency situations such as natural disasters and/or activation of the Northeast Region Continuity of Operations Plan (COOP). The COR will identify which tasks are necessary during this emergency and what personnel will be required to report to work or work additional hours.
Travel: Occasional travel is required to various sites in the Northeast Region.
Invoicing
Invoicing shall be in accordance with the DOI ELECTRONIC INVOICING Electronic
Invoicing and Payment Requirements – Internet Payment Platform (IPP) (September 2011)
– See Contract Administration Data (below) for the full clause. The Period of Performance
(POP) for each invoice will be one calendar month based on actual hours worked, beginning with the start date of this contract. The contactor shall submit only one invoice per month.
Timesheets will be verified by NPS Contracting Officers Technical Representative monthly prior to payment.
Standards and References
NPS standards and procedures will be made available upon task initiation.
All work performed will be within the standards of the American Institute for Conservation
(AIC) Code of Ethics and Guidelines