Pricing_Schedule.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Lower Fuselage (LF) Radome Replacements
- Solicitation number
- WC-133M-16-RQ-0917
About this file
The Pricing Schedule spreadsheet.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_3_(for_FBO).pdf | ||
| WC-133M-16-RQ-0917_(LF_radomes).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ Pricing
| Ordering Period 1 (date of award through 9/30/2016) | Ordering Period 2 (10/1/2016 through 9/30/2017) | Ordering Period 3 (10/1/2017 through 9/30/2018) | Ordering Period 4 (10/1/2018 through 9/30/2019) | |
| Non-recurring engineering (NRE) and/or production preparation | $ | N/A | N/A | N/A |
| Per Unit Cost for a Quantity of one (1) LF radome | $ | $ | $ | $ |
| Per Unit Cost for a Quantity of two (2) LF radomes | $ | $ | $ | $ |
| Per Unit Cost for a Quantity of three (3) LF radomes | $ | $ | $ | $ |
| If the quoter will be charging the Government for something other than the items in this spreadsheet, they shall submit an addendum to this spreadsheet |
| listing the item or items and the corresponding rate or rates. |
| The cost of shipping (FOB destination) all items to AOC shall be the responsibility of the contractor. All shipping costs shall be included in the |
| contractor’s firm-fixed-price rates for each LF radome. |
The Government may purchase up to three (3) LF radomes over the course of the resulting contract.
The Government is not obligated to purchase any LF radomes over the course of the resulting contract.
Funding for the Non-recurring engineering (NRE) and/or production preparation is the only guaranteed requirement.
&"-,Bold"PRICING SCHEDULE
File details come from the government source that posted it. Updated .