WA NP OLYM 12(8)_Preliminary Plans.pdf
PDF 18 MB Posted
- Solicitation number
- 69056726B000010
About this file
This is a set of preliminary construction plans for the Hurricane Ridge Rockfall Mitigation MP 9.4 project at Olympic National Park in Clallam County, Washington. The project encompasses rockfall mitigation, soil nail wall, culvert, and maintenance access improvements along a 0.04-mile section of Hurricane Ridge Road.
The project specifications and design designations include ADT (Average Daily Traffic) classifications of <900 for 2026 and <1200 for 2046, with a design speed of 35 MPH. Construction work encompasses multiple components: rockfall mitigation with a soil nail retaining wall and culvert installation, maintenance access road grading and paving (Method 1 with 6-inch compacted depth), roadside rockfall protection fencing with flexible barrier panels, erosion control using fiber roll installations, concrete catch basins and drainage systems, and permanent traffic control signage. The maintenance road ("ALL_ACCESS_01") will be constructed from station 1+11 to 2+77, with roadway aggregate base course and concrete barrier systems (WSDOT Type F precast) for protection. Additional elements include temporary traffic control during construction with advance warning signs, single lane closure layouts with traffic signals, and permanent signage for "Fallen Rocks" warnings. Standard construction specifications reference AASHTO LRFD Bridge Design Specifications, metal pipe culvert standards, concrete catch basin details, and fiber roll erosion control installation methods. Design approval signatures are required from the Chief of Engineering (Western Federal Lands Highway Division) and the Associate Regional Director (National Park Service, Regions 9, 10 & 12).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Project Description_WA NP OLYM 12(8).pdf | ||
| WA NP OLYM 12(8)_Prelim Letter.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRELIMINARY - N
OT FOR CONSTRUCTION
WA NP OLYM 12(8) A.3
NPS PMIS No. 335141,NPS Drawing No. 149/198715 larger than fiber roll
Existing ground (typ.)
ground
Existing soil to match ground level
Backfilled and compacted
Fiber roll
Flow direction
Fiber roll
Slope
Stagger joints (typ.)
along contours
Install fiber rolls on uphill side of fiber roll
Place excavated material wood stakes. See Note 2.
Fiber roll
Slope
1" x 1" wood stake
NO SCALE
NOTE:
2.
1.
fiber roll while staking.
used for permanent installations. Do not crush fiber roll is secure to slope. Live stakes may be from distur bed area s
Direction of runof f
INSTALLATION BEYOND TOE OF SLOPE
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
FIBER ROLL STAKING DETAIL
FIBER ROLL LAPPING DETAIL
INSTALLATION ALONG SLOPES
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
PLAN
FIBER ROLL SPACING STAKES REQUIRED
and install fiber rolls
Step 1: Excavate trench Step 2: Backfill soil against fiber rolls
ELEVATION
Fi ll slo pe
Direction of runoff
T o e o f fi ll s lo p e disturbed areas
Runoff from
D ire c tio n o f ru n o ff
Fl ow
Pay lim its
Pay lim its sp ac in g ch ar t
S ee F ib er R ol l
Flow fiber roll and space stakes at 4-foot maximum.
6-inches from fiber roll end angles towards the adjacent
Overlap fiber rolls 12-inch minimum. Drive stakes at
Drive stakes at each end and at 4-foot spacing until ove rlap
12" m in.
1" x 1" or 1" Ø m in m in t o as shown in plans
3' minimum or
3' minimum
Excavate trench 2" 2" minimum
Slope Spacing Fiber roll length for each roll
Stakes required
1:1
1:2
1:3
1:4 or flatter
(FT) (FT)
FIBER ROLL
157-21W
FP-24, FP-14
7/2016
WFL STANDARD
:1
A
M
M a r c h
S td W c p w w o r k
\d
\W
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
NUMBER
SHEET
COVER
MINIMUM
DIAMETER
VALENT
EQUI-
RADIUS
CORNER
MINIMUM
COVER
MINIMUM
COVER
MINIMUM
COVER
MINIMUM
DIAMETER
VALENT
EQUI-
RADIUS
CORNER
MINIMUM
142 x 91
137 x 87
128 x 83
117 x 79
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET) MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET) MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
INCHES INCHES
0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8
INCHES INCHES INCHES INCHES
0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
INCHES INCHES
0.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.060/160.075/140.105/120.135/100.060/160.075/140.105/120.135/10
INCHESINCHES INCHES INCHES
NO SCALE
NOTE:
of camber or increase the pipe culvert gradient.
elevation of the inlet invert, reduce the amount parabolic curve as designed exceeds the curve. If the midpoint elevation on the pipe length. Develop camber on a parabolic inverts an ordinate amount equal to 1% of the from a chord through the inlet and outlet
When directed, camber pipe culverts upward
4.
3.
2.
1.
culvert to the top of the pavement.
maximum fill height from the top of the pipe
For all roadway surface types, measure pipe culvert to the top of the pavement.
measure minimum cover from the top of the roadway subgrade. For rigid pavements, top of the pipe culvert to the bottom of the roadways, measure minimum cover from the
For flexible pavement and aggregate surface corrugation pipe.
Obtain approval before furnishing annular of helical lockseam and welded seam pipe.
corrugations are more restrictive than those
Fill heights for culvert pipe with annular lockseam and welded seam pipe only.
The fill heights in the table are for helical special analysis by the CO.
METAL ROUND PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
Fill heights exceeding 100 feet require
STEEL ALUMINUM
DIAMETER
SIZE
PIPE
SPAN x RISE
SIZE
PIPE ARCH
ALUMINUMSTEEL
DIAMETER
SIZE
PIPE
SPAN x RISE
SIZE
PIPE ARCH
" CORRUGATIONS2
" x 3
2 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE) METAL THICKNESS (INCH/GAGE)
" CORRUGATIONS2
" x 3
2 3" x 1" CORRUGATIONS
" CORRUGATIONS2
" x 3
METAL THICKNESS (INCH/GAGE)
3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS " CORRUGATIONS2
" x 3
2 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
3.5
103 x 71
95 x 67
87 x 63
81 x 59
73 x 55
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
3.5
METAL PIPE CULVERT
602-1
8/2024
FLH STANDARD
:1
P
A u g u s t
S td p w w o r k \d
\S td .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
Band Band
Band Band
Band BoltsBolts corrugation in pipe end with second annular around band meshes
Continuous corrugation heel and toe of angle of corrugation at fillet weld at crest
Rivet, spot weld, or
Pipe Pipe
Pipe
Band
BandBand
Bolts Bolts
Angle Angle strap connector
Bolt, bar andof corrugation at heel and toe of angle
Rivet, spot weld, or fillet weld at crest
Wedge
NO SCALE
NOTE:
1.
used.
Bridges, Division II Section 26 may be
Standard specifications for Highway joint performance criteria of AASHTO fastening devices that comply with the
Other types of coupling bands or
W
SMOOTH SLEEVE BAND FLAT BAND
ANNULAR BAND HELICAL BAND
SEMI-CORRUGATED BAND
STANDARD BAND CONNECTIONS
SLEEVE JOINT
SIDE VIEW SIDE VIEW
END VIEWEND VIEW
Band Angle
Bar & Strap
Oval Lug
Integral Flange Wedge and Strap
END VIEW
SIDE VIEW
W W W
Stab type joint
Smoother sleeve with center stop.
[1]
COUPLING BANDS FOR METAL PIPE CULVERT
the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses
Fabricate annular, helical and semi-corrugated type coupling bands from the same metal as
Use annular corrugated bands with pipes having annular corrugations or with helical pipe dimension of the end corrugation in the pipe.
For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the corrugations on rerolled pipe ends.
Use helical corrugated bands with pipes having helically corrugated ends.
[1]
[2]
[3]
[4]
[5]
[6]
"2
" × 3
The minimum band widths shown for 3" × 1" and 5" × 1" corrugated sizes apply to 2 or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.
Use a matching metal having a nominal thickness of not less than 0.040 inch for steel, Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or less.
steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:
thinner than the thickness of the pipe to be connected, and no thinner than 0.052 inch for
" for 18" round culvert (21" × 15" pipe arch) or less8
" for 21" round culvert (24" × 18" pipe arch) or more2 rerolled with 3" × 1" pipe corrugations.
having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on
" corrugations. A 12 inch band is acceptable on pipe ends 2
" × 3 pipe ends rerolled with 2 diameter, required above 42" diameter
Second angle connection optional to 42" diameter, required above 42" diameter
Second angle connection optional to 42"
DIAMETER
ROUND PIPE
SPAN × RISE
PIPE ARCHCORRUGATION
CORRUGATED
ANNULAR
CORRUGATED
HELICALLY
CORRUGATED
SEMI-
[3]
BANDS
[4]
BANDS
[5]
BANDS
[2]
SIZE
[6] underline
INCHESINCHESINCHES
87 × 64 to 142 × 91
60 × 46 to 81 × 59
87 × 64 to 142 × 91
60 × 46 to 81 × 59
49 × 33 to 83 × 57
17 × 13 to 42 × 29
78 to 144
36 to 72
78 to 144
36 to 72
78 to 84
42 to 72
12 to 36
10.5
10.5
10.5
10.5
10.5
10.5
10.5
MINIMUM BAND WIDTH (INCHES)
× 2
× 3
3 × 1
5 × 1
COUPLING BAND
METAL PIPE CULVERT
602-2
1/2024
:2
J u ly
S td p w w o r k \d
\S td .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
Roadway embankment Roadway embankment
Natural ground
Natural ground Natural ground
Roadway embankment
Roadway excavation
Natural ground
H H
H H
H H
H
H
H
H
Finished subgrade Finished subgrade
Natural ground
Finished subgrade before trench excavation embankment height
Finished subgrade or
Original natural ground surface
Finished subgrade
Roadway embankment
Roadway embankment
Finished subgrade trench excavations depth table
See bedding excavation in trench
HH
H
Half diameter or whichever is less
(see table)
Minimum spacing or Span
Diameter or Span
Diameter section
Metal endMetal end section or 36" (max.) for embankment installations
> 54"
12" to 54"
6"
4"
18" (min.)
* Reduce to 18" for
UP to 48"
48" and UP
24" span or 36", 18" ±
18" ±18"±
(min.)
6"
(min.)
6"
12" (min.), 24" (max.)
"/foot of cover,2 minimum
1'-0"
2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.)
2H or 12' (max.)2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.)
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
H equals the diameter of all round pipe culverts or the rise dimension of all pipe arch culverts.
See Section 704 for bedding and backfill requirements.
1.
2.
3.
Construct piping plug of impermeable backfill material at the pipe culvert inlet where granular material is used for backfill. Width may be adjusted to tie into impervious material.
MULTIPLE PIPE INSTALLATION
PIPING PLUG
BELOW NATURAL GROUND OR
TRENCH EXCAVATION IN EMBANKMENT
ON UNSTABLE MATERIAL
ABOVE AND BELOW
NATURAL GROUND
ON NATURAL GROUND
ABOVE NATURAL GROUND
ON UNYIELDING MATERIAL
PIPE BEDDING
ELEVATION
SECTION A-A
LEGEND:
Bedding material (uncompacted)
Impermeable backfill material.
BEDDING DEPTH
MINIMUM SPACING
Toe plate Toe plate
H
Width
H H
Pipe culvert
Embankment slope
High water elevation treatment
Culvert end
Piping plug
A
A
Embankment material placed in layers
Compacted backfill material placed in layers not backfill according to Section 614.
compact in layers not over compressible material. Lightly and replace with selected fine
Remove unyielding material fill material properly compacted with approved granular foundation firm bearing soil and replace
Remove unstable material to
Bedding
Bedding
Bedding
Bedding
NO SCALE
NOTE:
not exceeding 6" compacted depth.
exceeding 6" compacted depth; or flowable
6" in uncompacted depth.
2'-0" ±
1'-0" ±
SPACING
DIAMETER
or SPAN
PIPE SIZE (H) DEPTH
PIPE CULVERT BEDDING
METAL AND PLASTIC
602-3
FP-24
:0
J u ly
S td p w w o r k \d
\S td .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
Slope
Toe plateToe plate
A (min) B (max) H (min) W (max)
SLOPE
Approx.
A (min) B (max) H (min) W (max)
SLOPE
Approx.
diameter
Span or
B
L
AWA
End Section
SpanR is e
Di am et er
Toe plate extension
(min. width A+W)
Toe plate extension
Corner plate
(min. width A+W)
Toe plate extension
Corner plate
Reinforced edge
Expander lug End section steel or aluminum pipe
Smooth galvanized
Bolted or welded
Threaded rod
Rod holder connector
Flat strap Pipe culvert Pipe culvert
End section End section
Strap bolt
Pivot bolt
H H
" bolts8 3spacing for
35" × 24" thru 66" × 51" pipe arch
For 30" thru 60" round pipe and
17" × 13" thru 28" × 20" pipe arch
For 12" thru 24" round pipe and
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.079
0.079
0.064
0.064
0.064
0.064
0.064
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.075
0.075
0.060
0.060
0.060
0.060
0.060
112 × 75
103 × 71
95 × 67
87 × 63
83 × 57
81 × 59
77 × 52
73 × 55
71 × 47
66 × 51
64 × 43
60 × 46
57 × 38
49 × 33
42 × 29
35 × 24
28 × 20
24 × 18
21 × 15
17 × 13
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.079
0.079
0.064
0.064
0.064
0.064
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.075
0.075
0.060
0.060
0.060
0.060
INCHES
SPAN × RISE
PIPE SIZE METAL THICKNESS
STEEL ALUMINUM
INCHES GAGE INCHES GAGE
INCHES
DIMENSIONS
L (±2")(INCHES)
DIAM.
VALENT
EQUI-
INCHES
DIAMETER
PIPE SIZE
STEEL
METAL THICKNESS
INCHES GAGE
ALUMINUM
INCHES GAGE
INCHES
DIMENSIONS
L (±2") m in
12" (max.) hole lap after expansion
1" Minimum
13" for 30" dia. and over.
culvert less than 30" dia.
7" for concrete pipe
" bolts8 3spacing for m in
12" (max.) hole edge
Reinforced
Pay Limit
Pipe Culvert
1.
2.
3.
4.
5.
6.
7.
8.
ROUND OR PIPE ARCH CULVERT
PIPE ARCH CULVERTROUND PIPE CULVERT
DESIGN C
CONNECTION TO
METAL PIPE OR
OUTLET END OF
CONCRETE PIPE
SECTION A-APLAN
ELEVATION ELEVATION
riveted or welded connection
For all sizes of round pipe and pipe arch
END SECTIONS FOR ROUND PIPE CULVERT
END SECTIONS FOR PIPE ARCH CULVERT
A
A
DESIGN B
CONNECTION TO CONCRETE
PIPE INLET END
DESIGN A
CONNECTION TO ANNULAR
CORRUGATED METAL PIPE
Pipe coupling band shop bolted to
End section
Pipe culvert reinforcement bolted or riveted under the center panel seam.
Supplement the reinforced edges of end sections for
Variations in design and dimensions are permitted to allow for manufacturer's standards.
Fabricate the diameter of the end section of Design B to match the inside diameter of the concrete pipe culvert.
Design C may be used in lieu of design A for all metal pipe culvert sizes. Coupling bands may be any acceptable type for the pipe culvert specified.
Fabricate multiple piece bodies with lap seams tightly joined attached with bolts or rivets.
Fabricate connector section, corner plate and toe plate extensions from the same metal thickness as the panel body.
Use toe plate extension where shown on the plans.
Warp embankment slopes to match the slope of the flared end sections.
NOTE:
NO SCALE
60" and larger diameter pipe and 66" and larger at 6" centers (max.) or equivalent
" angle4
" × 2
" × 22 equivalent pipe arch provide 2
" bolts8 flared end section with
" rivets or bolts. Fabricate end section center panels 8 by
On end section center panels for 66" and larger from 0.138 inch steel or 0.135 inch aluminum.
for 60" and larger diameter pipe and equivalent pipe arch
" stiffener angles 4
" × 2
" × 22 equivalent pipe arch with 2
:2
J u ly
S td p w w o r k \d
\S td .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USEMETAL END SECTIONS
602-4
PROJECT
Sidewalk
Sidewalk
Pavement
Pavement
Roadway
NO SCALE
NOTE:
CURB SECTION
TYPICAL INSTALLATION
CURB AND GUTTER SECTION
TYPICAL INSTALLATION
DITCH SECTION
TYPICAL INSTALLATION
INLET DETAIL
3.
2.
1.
The minimum concrete cover to the face of any bar is and finish all exposed surfaces with a Class 1 ordinary finish.
basin
Catch basin
Catch basin
Catch
H
T line
Gutter or ditch d ia m e te r
P ip e
Bend to clear pipe
All reinforcing steel
Slope as staked Slop e as sta ked
CONCRETE CATCH BASINS
CONCRETE CATCH BASINS
inch 4
Chamfer all exposed edges
Standard 604-3 for Type B Frame and Grate.
See Standard 604-2 for Type A Frame and Grate and
2 inches unless otherwise shown.
3'-5"
#4 at 12"±.
T
FRAME AND GRATE
DIAMETER
SIZE
PIPE
H
DEPTH
TYPE A TYPE B
ESTIMATED QUANTITIES
FRAME AND GRATE
TYPE A TYPE B
DIAMETER
SIZE
PIPE
CONCRETE
STEEL
REINFORCING
CUYD
LB
LB
48"
42"
36"
30"
24"
18"
12"
48"
42"
36"
30"
24"
18"
12"
5'-6"
5'-0"
4'-6"
4'-0"
4'-0"
3'-0"
3'-0"
6'-3"
5'-6"
4'-9"
4'-0"
3'-3"
2'-6"
2'-6"
6'-3"
5'-5"
5'-0"
4'-2"
3'-4"
2'-6"
2'-6"
2.2
1.8
1.5
1.2
1.1
0.7
0.7
5"
1"
5"
1"
CATCH BASIN, TYPE 1
604-1
:4
J u ly
S td p w w o r k \d m s \S td .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
FRAME AND GRATE DETAILS
FRAME CORNER DETAIL GRATE CORNER DETAIL
FRAME ANCHOR DETAIL
FRAME DETAIL
GRATE DETAILS
SECTION A-A
SECTION B-B
(typ.)
(typ.)
C-L2
30°
(typ.)
AA
B
B
(trim angle to size)
T (See Note 8) headed anchor
45°
TRAFFIC
and washer headed anchor
Direction of flow
"4
"4
" x 4" 2 s p a c e s a t
" (See Note 7)8 3at 2
" x 4" headed anchors2
"4 1 "4
"4
T - 1" (See Note 8)
"4
2"
" plates2
" x 32
Space
"4
L3" x 1" x " bolt8 furnish
" dia. hole2
Drill
" x 4"2
"4 t y p s p a c e s a t d ia b a r
S p a c in g
(typ.)
"8 ty p
"2
22 equal spaces for"2
" Plate4
" x 4
" Plate2
" x 4 s p a c e s a t
" bolt8
Ferrule loop insert for
"8
2"8
2"8
2"4
1"4
" dia. bar8
"4
" x 2
L3" x 2
" Plate4
" x 4
" x 14 ty p
" dia. hole2
" dia. hole2 1 1" dia. hole p la te s ti f f e n e r s
S p a c in g
" x 2
L3" x 2
"4
L3" x 1" x
"4
" x 2
L3" x 2
"4
L3" x 1" x
" dia. hole2
1" dia. hole
" Plate4
" x 4
" Plate4
" x 2
"4
L4" x 1" x
"8
"4
"4
"8
2 "8
2 "8
2 2" "4
(typ.)
"8 x h e a d e d a n c h o r s
S p a c in g f o r
" dia. hole2
" Plate2
" x 2
45°" Plate4
" x 4
" Plate4
" x 4
8.
7.
6.
5.
4.
3.
2.
1.
FINISH: Galvanized after fabrication.
material thickness. Grind smooth all contact surfaces.
all joints with a minimum size fillet weld, based on
Specifications. Unless otherwise indicated seal weld
WELDING: Weld in conformance with the Standard a full penetration butt weld.
HEADED CONCRETE ANCHORS: Weld to frame with
THREADED CONCRETE ANCHORS: Ferrule loop inserts
BOLTS & WASHERS: ASTM A307, Galvanized.
STRUCTURAL STEEL: ASTM A36.
Number of plates varies according to pipe diameter.
NO SCALE
NOTE:
238 lbs. Increase or decrease weight by 19 lbs for
Estimated weight, frame and grate (2'-6" x 2'-6")
See Standard 604-1 for dimensions of T.
See Standard 604-1.
inch bolt or approved equal.8 for
-inch increment.8 each 2
TYPE B
METAL FRAME AND GRATE
604-3
:2
J u ly
S td p w w o r k \d m s \S td .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
NO SCALE
SECTIONAL VIEW ISOMETRIC VIEW
DRAIN GRATE DETAILS
FACING JOINT
TYPICAL SOIL NAIL
DRAINAGE STRIP DETAIL
GEOCOMPOSITE
2%
STUD DETAIL
CONNECTOR PLATE WITH
SHOTCRETE WALL JOINT DETAIL
with min. CIP cover of 2" soil face to provide bar end
Steel bar to protrude from
REINFORCEMENT DETAIL
CONSTRUCTION SHOTCRETE FACING
NOTE: Drain grate installation shall not disrupt geotextile design prior to shotcrete next lift the specifications in accordance with
Clean shotcrete joints angled joint as shown
45 degree angle to create
Backfill rebar lap at drain board strips (min.) 2' wide
Vert perm geocomposite la p f o r
W W
F m in m in
L a p
Temporary shotcrete joint
4" (typ.) Construction shotcrete facing
(size and # ) Rebars WWF (size)
(size) rebars
Continuous drain board (min.) 2' wide
Vertical geocomposite
See detail
Temporary shotcrete lift joint (typ.)
Weep hole(typ.)
x
(typ.)
4"
(min.)
6" Shotcrete construction facingPermanent shotcrete facing
(plate should be wet set) centered about bar hole headed spaced - x -
- x - studs steel plate, with four
- x - thick mild with min. CIP cover of __" soil face to provide bar end
Steel bar to protrude from hex nut with beveled washer
Steel spherical seat nut or vertical and horizontal facing #__@ x" O.C.
at of permanent
Reinforcing placed
LC
2" Clear
LC
Centralizer
Nail grout
Shotcrete or nail grout corrosion protection and centralizers
Steel bar with double encapsulation
LC
Nail hole
X
X
(plate should be wet set) centered about bar hole studs spaced " x "
" x " welded steel plate, with four
" x " thick mild
(place at of tempoary shotcrete)
WWF (__ x __ - W __ x W __)
@ __" O.C. continuous behind plate
Waler bars (2) #__ - deformed steel bars
(placed at of temporary shotcrete)
Two __" x __" vertical rebars and full penetration buttweld
__" Dia. x __" heads
__" Dia. x __" with
Stud (typ. 4 places)
NOTE:
approval by the CO.
The contractor is responsibile for furnishing final design details for
1. The details on this sheet are illustrative and informational purpose only.
Sheet 1 of 2
TYPICAL DETAILS
SOIL NAIL RETAINING WALL1
:3 a r c h
S
O
IL
N A
IL
R
E T
A
IN
IN
G
W A
L L
T Y
P
IC
A L
D E
T A
IL
S
S
H E
E T
O
F p w w o r k d ir
\j a c o b s a m e r tr a n s p
\d
\c r la
P
L N
I .d g n
PROJECT
NUMBER
G.4
WA NP OLYM 12(8)
NPS PMIS No.: 335141, NPS Drawing No.: OLYM 149/198715
NOTE:
3. Proof test detail as verification test performed on a production nail.
2. Bare bars may be used for sacrificial test nails.
CO for approval.
The contractor is responsible for furnishing final design details to the
1. The details on this sheet are illustrative and informational purpose only.
SOIL NAIL DETAIL
ENCAPSULATED PRODUCTION
VERIFICATION TEST SOIL NAIL DETAIL
Hex nut
Steel bar
Plate, with studs
Beveled washer
2" (min.) cover
Shotcrete construction facing minimum 3" shotcrete or nail grout cover
Embed nail encapsulation to provide the top and bottom of drillhole provide centralizers within 2' from
Centralizer @ max. 6' o.c. and
Nail grout
Encapsulation
End cap assembly
1" (min.)
Total nail bar lengthwith architectural finish
CIP concrete wall supports independent of wall
Dial gauges attached to
Load cell
Reference plate
Bearing plates
To readout pressure gauge
To hydraulic pump and
Jack hydraulic ram
Verification test nail steel bearing plate
Wood cribbing and
3' (min.)
Unbonded length
10' (min.)
Bonded length
__" (min.)
L = Drilled nail length
Sheet 2 of 2
TYPICAL DETAILS
SOIL NAIL RETAINING WALL1
:2 a r c h
S
O
IL
N A
IL
R
E T
A
IN
IN
G
W A
L L
T Y
P
IC
A L
D E
T A
IL
S
S
H E
E T
O
F p w w o r k d ir
\j a c o b s a m e r tr a n s p
\d
\c r la
P
L N
I .d g n
PROJECT
G.5WA NP OLYM 12(8)
NPS PMIS No.: 335141, NPS Drawing No.: OLYM 149/198715
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD NAME
WORK
ROAD
AHEAD
ROAD WORK
END
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
WORK
ROAD
AHEAD
xx
MPH
ROAD NAME
ROAD WORK
END
WORK
ROAD
xxxxxxx
ROAD WORK
END
xx
MPH
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
ROAD TYPE
DISTANCE BETWEEN
A B C
NOTE:
M in o r R o a d
M a jo r R o a d
C
B as de ter mi ne d b y t he C
O
Wor k z on e A re a o f I nfl ue nc e
(S ee S ign S pa cin g T ab le)
ADVANCE W
ARNI
NG
AREA
(S ee S ign S pa cin g T ab le)
ADVANCE W
ARNI
NG
AREA
A
B
C
A
A
A
A
Pr oje ct Lim its
See Note 8 W16-8P W20-1 over
W20-1
G20-2
See Note 9 W20-1
See Note 9 W20-1
(optional) W13-1P
See Note 10 G20-1
G20-2
See Note 8 W16-8P W20-1 over
G20-2
G20-2
See Note 9 W20-1
See Note 9 W20-1
(optional) W13-1P
See Note 10 G20-1 specify the distance to the work area in feet or in miles. Install an The message on the W20-1 signs may be ROAD WORK AHEAD or may roads only).
name of the road on which the construction does occur (applies to major construction work occurs, include a supplementary plaque indicating the If W20-1 is placed on a roadway other than that on which the actual
Cover post-mounted signs when not applicable.
Do not store traffic control devices along the roadway when not in use.
Maintain two-way traffic during all non-work hours except as approved.
Ensure all sign supports exposed to traffic are crashworthy.
construction area.
needed to indicate a maximum recommended speed through the Install advisory speed plaques under the W20 series warning signs as messages as required.
signs, locate the warning signs to fit field conditions as approved. Vary Where advance warning signs, placed as shown, interfere with permanent operations.
and details in this traffic control plan as necessary to accommodate actual applicable to this project. The Contractor may add or delete information Not all details shown on the temporary traffic control sheets may be
Erect all project advance warning signs before starting construction work.
State standards may be used as an alternative if approved.
verify that an encroachment permit has been obtained.
If signing on a roadway under a jurisdiction other than the client agency, nearest whole mile.
at each end of the project. Show the distance on the G20-1 sign to the
Ro ad N ame
SIGN SPACING TABLE
For work zones that are 2 miles or more in length, install G20-1 signs
Sign Spacing Table.
When used, place the two W20-1 signs "B" feet apart according to the additional W20-1 sign when approach speeds exceed 50 mph.
Expressway / Freeway
NO SCALE
SIGNS IN FEET
Rural greater than 50 mph
Urban and Rural 35 mph to 50 mph
Urban and Rural 30 mph and less
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
635-1
2/2024
:4
J u n e
S td
-1 p w
-w o rk \d m s
\S td
-1
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
not the advisory speed.
Approach speed based on the regulatory posted speed, *
Traffic flow
Traffic flow
ROAD WORK
END
STOP
HERE ON
RED
xx
MPH
ONE LANE
ROAD
AHEAD
WORK
ROAD
AHEAD
STOP
HERE ON
RED
ROAD WORK
END
(optional) light warning
Type B
See Note 5
STOP LINE
See Note 5
STOP LINE
See Note 2
Temporary traffic signal
See Note 2
Temporary traffic signal
Channelizing devices it has two signal faces that are at least 8 feet apart and meets the other
50' - 100'50' - 100'
40' - 180'
See Note 7
10' min.
40' - 180'
NOTE:LENGTH AND SPACING TABLE
SIGN SPACING TABLE
8.
7.
6.
5.
4.
3.
2.
1.
A single signal installation is acceptable, on the right-hand side of the road, if depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place signs similar to those the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
Section 156.
For project specific minimum width, refer to Special Contract Requirements, AHEAD (W20-1) and END ROAD WORK (G20-2) signs.
If closure is completely within the project limits, eliminate the ROAD WORK be used for stop lines and no-passing pavement markings.
stop line that comply with the MUTCD. Removable pavement markings may the work space and the stop line. Add no-passing lines in advance of the
Remove existing conflicting pavement markings and raised markers between
For paved roadway surfaces, install stop lines complying with the MUTCD.
qualified engineer.
approved. If signals are moved, determine revised signal timing using a
Final location and spacing of devices may be changed to fit field conditions as or automatically, ensure red signal indications are flashed to both approaches.
engineer. When the signal is changed to the flashing mode either manually requirements of the MUTCD. Establish signal timing using a qualified
Install and operate temporary traffic control signals in accordance with the requirements of the MUTCD.
See Note 6
G20-2
W3-3
R10-6
See Note 6
W20-1 W20-4
(optional)
W13-1P
(optional)
W1-4R
R10-6
See Note 6
G20-2
(See Length and Spacing Table) VARIABLE TERMINATION AREA
ABUFFER SPACE TAPER AREA
(optional)
WORK SPACE
(optional)
BUFFER SPACETAPER AREAABC
ADVANCE WARNING AREA (See Sign Spacing Table)
See Note 5 Device spacing
Spacing Table)
(See Length and
DISTANCE BETWEEN
A B C
Expressway / Freeway
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
LENGTH
SPACE
BUFFER
ROAD TYPE
Rural greater than 50 mph
Urban and Rural 35 mph to 50 mph
Urban and Rural 30 mph and less
SIGNS IN FEET
MPH
FEET
SPACING IN FEET
(WITH SIGNALS)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
635-9
:1 u n e
S td p w w o r k \d m s \S td .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
Traffic flow
Traffic flow
LENGTH AND SPACING TABLE
pavement markings
Remove conflicting
Channelizing devices
See Note 2
Portable traffic barrier
NOTE:
4.
3.
2.
1.
stored in the buffer space.
Do not allow equipment, materials, or vehicles to be parked or
Requirements, Section 156.
For project specific minimum width, refer to Special Contract protect the barrier ends with a crash cushion. Include
Terminate barrier ends outside the work zone clear zone or
Place barrier according to the AASHTO Roadside Design Guide.
devices may be changed to fit field conditions as approved.
Install signs and other devices for single lane closure according spacing
Device
(optional)
BUFFER SPACE
TAPER AREA
TAPER AREA (
(optional)
BUFFER SPACE
VARIABLE WORK SPACE
(See Length and Spacing Table)
Approach speed based on the regulatory posted speed, not the advisory speed.* to Standard 635-6, 7, 8, or 9. Final location and spacing of reflectors on barrier at 25 ft intervals.
See Note 3
10' min.
(50' - 100')
50' - 100')
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
LENGTH
SPACE
BUFFER
WIDTH
CLEAR ZONE
WORK ZONE
RATE
FLARE
BARRIER
CONCRETE
1:16
1:16
1:16
1:16
1:14
1:12
1:10
1:9
1:8
1:8
1:8
MPH
FEET
SPACING IN FEET
FEET
See Note 2
See Note 2
WITH TEMPORARY BARRIER
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
635-13
:1 u n e
S td p w w o r k
\d m s
\S td
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
See post detail (typ.)
Breakaway holes
See table for hole size parallel to sign face.
Field drill holes through post
Bottom of sign panel
Post�
Local tangent
< 10
" diameter4 1Attach sign panels with a minimum of two a minimum lateral distance of 1 ft behind the face of lateral offset of 2 ft may be used. In areas with curbs, 6" x 6" or larger.
Use 7 ft minimum spacing between posts for sign posts and 6 ft minimum mounting height for secondary sign.
use 7 ft minimum mounting height for main sign
NOTE:
90°
93°
WOOD POST SELECTION TABLE
X X
0.75X
H
H
X
0.2X0.6X 0.2X
Y
H
D
H
D
H
D
Long side of post
D
7.
6.
5.
4.
3.
2.
1.
In areas where lateral distance is limited, a minimum
D = Post embedment depth for average soil conditions.
Select post lengths to fit field conditions.
H1 and H2 = Overall post length.
bolts per post.
In pedestrian locations, or in areas with obstructed views, the curb may be used.
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
E d g e o f s h o u ld e r
E d g e o f tr a v e le d w a y
State standards may be used as an alternative if approved.
S e e N o te m in
S e e N o te m in
See Note 4
6' - 12'
On tangent alignment
200'
"X"
WIDTH AREA
OF POSTS
NUMBER POST SIZE D HOLE SIZE
(SQFT)
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
(INCH) (INCH) (INCH)
Diamond ≤ 48"
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
> 30'
> 17'
12' - 16'
> 13'
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
1.5
1.5
1.5
1.5
WOOD POSTS
SIGN INSTALLATION
TEMPORARY TRAFFIC CONTROL
635-14
:1 u n e
S td
-1 p w
-w o rk \d m s
\S td
-1
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
W
3W
H
W 4
W 4 W 4
W
W 6
W
W
W m in
6' (min.)
m in
W
W of curb
Front face
** See Note 3
* See Note 2 pavement
Edge of
6' (min.)
m in shoulder
Edge of
6' (min.)
m in pavement
Edge of
POST TYPE
POST
SINGLE
POST
DOUBLE
POST
TRIPLE
POST
QUADRUPLE
POST SIZE TABLE
MAXIMUM SIGN AREA (SQFT)
4" x 4"
SIZE
POST
4" x 6"
6" x 6"
2" 12 ga.
2" 12 ga.
Class B
10 ga.
2" x 2"
10*
10*
10*
10*
24**
H /5 o r m a x
H /5 o r m a x m a x
H /5 o r
SINGLE POST DOUBLE POST TRIPLE POST QUADRUPLE POST
(min.)
2'
W
ROADSIDE SIGN IN RURAL DISTRICT
WITHOUT SHOULDER WITH SHOULDER
WITH ADVISORY SPEED PLAQUE
OR RESIDENTIAL DISTRICT
ROADSIDE SIGN IN BUSINESS
Wood
U-Channel Steel
Steel
Square Tubular
Resistant Steel
Corrosion m a x
W
W
W
(typ.)2" max.
(typ.)
2" max.
(typ.)
2" max.
NOTES:
additional information.
Refer to Section 2A.18 of the MUTCD, latest edition, for
U-channel steel and square tubular steel posts.
Refer to Detail E633-04 for bracing details for wood, for wood, U-channel steel and square tubular steel posts.
Refer to Detail E633-03 for breakaway support details for corrosion resistant steel posts.
Refer to Detail E633-02 for breakaway support details according to manufacturer's recommendations.
panel area is equal to 24 square feet, use slip base
For square tabular steel double posts for which the sign feet or less but W is over 4 feet, use double posts.
steel posts for which the sign panel area is 10 square
For U-channel, square tubular, and corrosion resistant
Uniform Traffic Control Devices" (MUTCD), latest edition.
Locate and set sign height according to the "Manual on
7.
6.
5.
4.
3.
2.
1.
STOP
SPEED
LIMIT
M PH
NO SCALE
APPROVED FOR USESIGN STRUCTURES
FP-24, FP-14
EFLHD DETAIL
:4
J u n e
S h e t
S ta n d a r d s a n d
D e ta il s \E
F L
H D
D e ta il D r a w in g s \F
P
\6
P e r m a n e n t T r a f f ic
C o n tr o l\ s t6 d e ta il .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
E633-01
06/2024
PROJECT
NUMBER
SHEET
WA NP OLYM 12(8) J.3
NPS PMIS No. 335141,NPS Drawing No. 149/198715
Sign panel
4''Existing ground
Existing ground m in m in m a x
S e e N o te
Traffic flow
Tr af fic fl ow
Tr af fic fl ow
U-CHANNEL STEEL POST SQUARE TUBULAR STEEL POST WOOD POST
POST SIZE HOLE DIAMETER
6'' x 6''
1.5''
2''
3'
4'
4'
D
BREAKAWAY SIGN SUPPORT
t o s p li c e o v e r la p
Existing ground
(MIN.)
(D) m in
(See Table)
Holes (See Table) m a x th is fa ce o f p os t)
(M ou nt si gn p an el on th is fa ce o f p os t)
(M ou nt si gn p an el on
(See Notes 5 and 6)
Galvanized steel corner bolt
(See Notes 5 and 6)
Anchor 12 ga. min.
U-channel sign post
Square tubular sign post
Wood sign post
Stub bolts, nuts and washers
" dia. galvanized 16
Four
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
latest edition, for additional information.
Refer to Section 2A.18 of the MUTCD, details.
Refer to Detail E633-04 for sign bracing details.
Refer to Detail E633-01 for sign mounting latest edition of the MUTCD.
Signs and Markings" as specified in the standards in the "Standard Highway
For sign punching details, see the blank position.
Maintain the post assembly in a plumb accept the post size specified.
manufacturer's recommendations to
Size the anchor according to the to the manufacturer's recommendations.
the anchor with a corner bolt according
Attach the square tubular steel post to per post.
line. Do not place more than one splice line and 18 inches above the ground steel posts entirely between the ground
Position splice overlap on U-channel non-breakaway signs.
barrier. Do not place holes in posts of the clear zone or shield with approved
Place non-breakaway signs outside apart.
cannot be spaced a minimum of 7 feet if multiple posts are required and posts posts are considered to be non-breakaway
Signs requiring 6- by 6-inch wood signs placed behind protective barriers.
Breakaway sign support is not required for m a x
STATE PROJECT
WOOD POST DATA TABLE
4'' x 6''
4'' x 4'' Not Required
NOTES:
NO SCALE
APPROVED FOR USE
FP-24, FP-14
EFLHD DETAIL
:0
J u n e
S h e
S ta n d a r d s a n d
D e ta il s \E
F L
H D
D e ta il D r a w in g s \F
P
\6
P e r m a n e n t T r a f f ic
C o n tr o l\ s t6 d e ta il .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
WOOD AND STEEL POSTS
BREAKAWAY SIGN SUPPORT
06/2024
E633-03
PROJECT
NUMBER
SHEET
WA NP OLYM 12(8) J.4
NPS PMIS No. 335141,NPS Drawing No. 149/198715
WITH BATTEN WITHOUT BATTEN
1 (typ.)
1'' x 3'' Wood batten
Sign panel
Sign panel
NOTES:
Sign panel sign bracing " Galvanized steel 8
WOOD POST
Sign panel
Sign post
Sign bracing
" to 2"2 t o
6.
5.
4.
3.
2.
1.
SQUARE TUBULAR STEEL POST
U-CHANNEL STEEL POST
TOLERANCES
BRACING INSTALLATION
Square tubular sign post
Wood sign post (typ.)
U-channel sign post
" x 0.012" (±) Shim plate2
" x 32
Sign bracing (Stringer) hex nut, and washer
" dia. galvanized round head bolt, 16 head bolt, nut, and washers (typ.)
" dia. x 1" long galvanized hex 4 head bolt, nut, and washers (typ.)
" long galvanized hex 2
" dia. x 38 nut and washer " dia. galvanized bolt, 16 with nylon insert lock nut " dia. galvanized steel bolt 16 in sign panel (typ.)
" dia. hole 16
Field drill latest edition, for additional information.
Refer to Section 2A.18 of the MUTCD, details.
Refer to Detail E633-01 for sign mounting and the steel washer.
the sign panel's retroreflective sheeting
Use neoprene or nylon washers between vertical spacings not to exceed 30 inches.
Use wood battens bolted to post at latest edition of the MUTCD.
Signs and Markings" as specified in the standards in the "Standard Highway
For sign punching details, see the blank when specified or as directed.
braces on signs with widths of 36 inches of 48 inches or greater. Install sign
Install sign braces on signs with widths
NO SCALE
APPROVED FOR USE
E633-04
FP-24, FP-14
EFLHD DETAIL
:0
J u n e
S h e
S ta n d a r d s a n d
D e ta il s \E
F L
H D
D e ta il D r a w in g s \F
P
\6
P e r m a n e n t T r a f f ic
C o n tr o l\ s t6 d e ta il .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
06/2024
SIGN BRACING
PROJECT
NUMBER
SHEET
WA NP OLYM 12(8) J.5
NPS PMIS No. 335141,NPS Drawing No. 149/198715
Proj-Num#12:
WA NP OLYM 12(8)
| W157-21#1: E.2 |
| NPS#12: NPS PMIS No. 335141,NPS Drawing No. 149/198715 |
| Proj-Num#13: |
WA NP OLYM 12(8)
| 602-1#1: F.2 |
| NPS#13: NPS PMIS No. 335141,NPS Drawing No. 149/198715 |
| Proj-Num#1: |
WA NP OLYM 12(8)
| 602-2: F.3 |
| NPS#1: NPS PMIS No. 335141,NPS Drawing No. 149/198715 |
| Proj-Num#2: |
WA NP OLYM 12(8)
| 602-3: F.4 |
| NPS#2: NPS PMIS No. 335141,NPS Drawing No. 149/198715 |
| Proj-Num#5: |
WA NP OLYM 12(8)
| 635-1: I.3 |
| NPS#5: NPS PMIS No.: 335141, NPS Drwg No. OLYM 149/198715 |
| Proj-Num: |
WA NP OLYM 12(8)
| 635-9: I.4 |
| NPS: NPS PMIS No.: 335141, NPS Drwg No. OLYM 149/198715 |
| Proj-Num#8: |
WA NP OLYM 12(8)
| 635-13: I.5 |
| NPS#8: NPS PMIS No.: 335141, NPS Drwg No. OLYM 149/198715 |
| Proj-Num#9: |
WA NP OLYM 12(8)
| 635-14: I.6 |
| NPS#9: NPS PMIS No.: 335141, NPS Drwg No. OLYM 149/198715 |
| Proj-Num1: |
WA NP OLYM 12(8)
| 604-1: F.6 |
| NPS1: NPS PMIS No. 335141,NPS Drawing No. 149/198715 |
| Proj-Num2: |
WA NP OLYM 12(8)
| 604-3: F.7 |
| NPS2: NPS PMIS No. 335141,NPS Drawing No. 149/198715 |
| Proj-Num3: |
WA NP OLYM 12(8)
| 602-4: F.5 |
| NPS3: NPS PMIS No. 335141,NPS Drawing No. 149/198715 |
File details come from the government source that posted it. Updated .