Project Description_WA NP OLYM 12(8).pdf
PDF 287 KB Posted
- Solicitation number
- 69056726B000010
About this file
This document is a presolicitation notice for a federal construction contract project located at Hurricane Ridge in Olympic National Park, Clallam County, Washington, approximately 11 miles south of Port Angeles. The primary objective is to construct a rockfall mitigation system to protect the roadway and park infrastructure from falling rock hazards.
The estimated price range for this project is between $2,000,000 and $5,000,000, with a tentative solicitation date in Winter 2026/2027 and a tentative fixed completion date of Fall 2027. The scope of work, specified using FP-24 standards in US customary units, includes multiple construction divisions: Project Requirements (construction survey and staking, quality control and assurance, sampling and testing, construction schedules, erosion and sediment control, and dust control); Earthwork (clearing and grubbing of 0.3 acres, removal of structures and obstructions including relocation of a 125 linear foot concrete barrier, and excavation and embankment of 720 cubic yards); Slope Reinforcement and Retaining Walls (contractor-designed retaining walls, 1,260 square feet of soil nail retaining walls, and 102 linear feet of roadside rockfall protection fence); Aggregate and Base Courses (18 cubic yards of roadway aggregate); and Incidental Construction (240 linear feet of culverts, 1 end section, 1 inlet, 2 crash cushions, 210 linear feet of concrete barriers, rental equipment, general labor, 25 square feet of sign system, temporary traffic control including 1,200 hours of flagger services). The contractor must provide construction schedules, quality assurance programs, and temporary traffic control measures throughout the project duration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WA NP OLYM 12(8)_Preliminary Plans.pdf | ||
| WA NP OLYM 12(8)_Prelim Letter.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hurricane Ridge Rockfall, Hurricane Ridge Rockfall Mitigation MP 9.4
Olympic National Park
Clallam County, Washington
The primary objective of the project is to construct a rockfall mitigation system.
Project Location: This project is located approximately 11 Miles S of Port Angeles, WA.
Estimated Price Range between $2,000,000 and $5,000,000
Tentative Solicitation Date: Winter of 2026/ 2027
Tentative Fixed Completion Date: Fall 2027
DESCRIPTION OF WORK in US CUSTOMARY UNITS
USING FP-24 SPECS
O n e S ch ed u le
S ch
N am e
A
DIVISION 150 – Project Requirements
152 Construction Survey & Staking (yes/no) Yes
153 Contractor Quality Control and Assurance
(yes/no) Yes
154 Contractor Sampling & Testing (yes/no) Yes
155 Schedules for Construction Contracts (construction schedules)
(yes/no) Yes
157 Soil Erosion & Sediment Control (erosion control devices)
158 Watering for Dust Control LPSM
DIVISION 200 – Earthwork
201 Clearing & Grubbing 0.3 ACRE
O n e S ch ed u le
S ch
N am e
A
203 Removal of Structures & Obstructions (relocate concrete barrier) 125 LNFT
204 Excavation & Embankment 720 CUYD
DIVISION 250 – Slope Reinforcement and Retaining Walls
257 Contactor-Designed Retaining Walls (contractor completed designs) LPSM
259 Soil Nail Retaining Walls 1260 SQFT
265 Roadside Rockfall Protection, Fence 102 LNFT
269 Temporary Roadside Rockfall Protection, Fence LPSM
DIVISION 300 – Aggregate and Base Courses
302 Roadway Aggregate Method 1 18 CUYD
DIVISION 600 – Incidental Construction
602 Culverts 240 LNFT
602 End Section 1 EACH
604 Inlets 1 EACH
617 Crash Cushion 2 EACH
618 Concrete Barriers 210 LNFT
622 Rental Equipment (yes/no) Yes
623 General Labor (yes/no) Yes
633 Sign System 25 SQFT
635 Temporary Traffic Control LPSM
635 Temporary Traffic Control (Flagger) 1200 HOUR