updated_1190_questions.pdf

PDF 53 KB Posted

Attached to
1190 Demolistion
Solicitation number
W91ZRU-18-R-6000
Issued by

View the file

Other files

File Type Posted
1190_Demo_abstracts.pdf PDF
B1190_Fences.pdf PDF
1190_Questions.pdf PDF
Bldg1190_HABS_Report_Final.pdf PDF
Sign-In_Sheet.pdf PDF
FTQW_16-2001__Bldg_1190_Demo_SOW_Rev2.pdf PDF
1442.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Do we send out proposal to usaf.ak.168-wg.list.fal-msc-contracting@mail.mil?

All information about the bidding process is located on the 1442 under

INSTRUCTION TO BIDDERS

2. The HABS report provided does not include any information related to the haz-mat survey.

What type of quantity of haz-mat should we anticipate and include in our bid?

Approximately 100-150 CY

3. Is the electrical pole with the transformers east of the building 1190 to be demo’d?

No

4. Please provide fence limits and fence plan for section 01011, part 1, Paragraph A (ii)(d).

See ‘B1190 Fences” attached.

5. What dimensions are the trench drain inside the building that is mentioned in Section 02221, Part 3, Paragraph L? Provide a drawing detail please.

No drawing but measured approx. 45” deep x 42” wide x 130 ft length

6. Is the utilidor from the building to the main line utilidor to be demolished and removed in its entirely?

No Section 01011, part 1, Paragraph A(ii)(a) states, “utilities and utilidor to the main line utilidor”?

Could not find “utilities and utilidor to the main line utilidor” in SOW. Note: “Utilities shall be demolished back to the main line utilidor connection and main line utilidor shall be patched to prevent water/rodent infiltration.”

7. Is there any underground storage tanks, catch basins, or contaminated soils in this project?

No underground storage tanks or catch basins. Soil not previously tested.

8. Is there topsoil and seeding in this project?

Yes, hydroseeding where disturbed.

9. Since funding is not available according to the SF 1442 block 10, is the intention to complete this project by the summer 2018?

A NTP will be issued during the Spring.