PreBid Conference.pdf
PDF 45 KB Posted
- Attached to
- Hospital Pad Federal contract opportunity
- Solicitation number
- W91ZRS-09-B-0010
About this file
PRE-BID/SITE VISIT POWERPOINT
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W91ZRS09B0010-0002.doc | DOC document | |
| PreBidSiteVisitsigninRoster.pdf | ||
| 20081566A10DET01HOSPITALPADC533.pdf | ||
| 20081566A10DET01HOSPITALPADC534.pdf | ||
| 20081566A10STP01C511HospitalLayout.pdf | ||
| 20081566A10STP01C500HospitalOverall.pdf | ||
| 20081566A10STP01C501HospitalDemo.pdf | ||
| W91ZRS09B0010-0001.doc | DOC document | |
| 20081566A10DET01HOSPITALPADC535.pdf | ||
| 20081566A10DET01HOSPITALPADC536.pdf | ||
| 20081566A10DET01HOSPITALPADC532.pdf | ||
| HospitalPadAdd1.pdf | ||
| 20081566A10STP01C512HospitalGrading.pdf | ||
| HospitalPadSpecs.pdf | ||
| G5-01_Cover.pdf | ||
| W91ZRS09B0010.doc | DOC document | |
| HospitalPadCDrawings.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hospital Pad
PRE-BID/Site Visit CONFERENCE 10 Sep 09 @ 1000 HRS
Camp Hartell, Windsor Locks, CT 06096
KEY PLAYERS
• CW2 Karlene Falk – KO
• LT Cameron Sprague – COR
• Jim Cavanna - Engineer
• Hugh Graham – Construction Specialist
• Al Boudreau
• Rich Gruft - A&E
What is different from Proposal
• In the invitation for bid (IFB) process, a public bid opening occurs when the bids are due
– there can be no discussion
– no correction of Mistakes in most cases
– Award is always to the low responsible bidder
• In the Request for Proposal (RFP) process, a written proposal will be provided in addition to pricing.
– The Govt will award based on best value criteria
– There can be clarifications, discussions and/or negotiations
– After closing, the process is “closed” and information will be not be available until time of award
WHAT IS THE
CONTRACT PERIOD?
CONTRACT PERIOD IS 180
CALENDAR DAYS AFTER
RECEIPT OF NTP
1 Oct 2009 through 1 Apr 2010 is the mandatory performance period
HOW CAN I BE AWARDED THE
CONTRACT??
• SUBMIT ALL THE INFORMATION
REQUIRED IN THE IFB!!
• BE SURE TO CAREFULLY READ
THROUGH THE SF 1442 AND SF 30’s
DISCLAIMER
THE FOLLOWING IS A BRIEF OVERVIEW
OF THE BID REQUIREMENTS
OFFERORS ARE STRONGLY CAUTIONED
TO CAREFULLY READ THE
REQUIREMENTS OF THE
SOLICITATION AND COMPLY
ACCORDINGLY
VOLUME 1
• SECTION 00010 - OFFEROR PORTION OF
SF1442
• SECTION 00010 – INSERT ALL REQUIRED
PRICING
• SECTION 00100 – ADDITIONAL
INSTRUCTIONS
• SECTION 00600 - COMPLETE AND INSERT
REPRESENTATIONS AND CERTIFICATIONS
• SECTION 00800 ADDITIONAL INSTRUCTIONS
AND GENERAL DECISION
• SUBCONTRACTING PLAN IF REQUIRED
(Large Business only)
BID DUE DATE
• BID DUE NLT 1100HRS
(11:00PM) 22 SEPT 2009 to 360 Broad St, Hartford, CT 06105 RM 323 ATTN: Karlene Falk
WHAT IF I HAVE A
QUESTION?
• QUESTIONS MUST BE SUBMITTED IN
WRITING VIA EMAIL ONLY TO:
KARLENE.FALK@US.ARMY.MIL
mailto:KARLENE.FALK@US.ARMY.MIL
QUESTIONS ???
SITE VISIT FOLLOWS THIS BRIEFING
| Hospital Pad |
| KEY PLAYERS |
| What is different from Proposal |
| WHAT IS THE CONTRACT PERIOD? |
| HOW CAN I BE AWARDED THE CONTRACT?? |
| DISCLAIMER |
| VOLUME 1 |
| BID DUE DATE |
| WHAT IF I HAVE A QUESTION? |
| QUESTIONS ??? |
File details come from the government source that posted it. Updated .