HospitalPadAdd1.pdf

PDF 5 KB Posted

Attached to
Hospital Pad Federal contract opportunity
Solicitation number
W91ZRS-09-B-0010
Issued by
Department of the Army Connecticut Army National Guard

About this file

HOSPITAL PAD ADD !

View the file

Other files for this federal contract opportunity

Other files attached to Hospital Pad, newest first.
File Type Posted
W91ZRS09B0010-0002.doc DOC document
PreBid Conference.pdf PDF
PreBidSiteVisitsigninRoster.pdf PDF
20081566A10DET01HOSPITALPADC533.pdf PDF
20081566A10DET01HOSPITALPADC534.pdf PDF
20081566A10STP01C511HospitalLayout.pdf PDF
20081566A10STP01C500HospitalOverall.pdf PDF
20081566A10STP01C501HospitalDemo.pdf PDF
W91ZRS09B0010-0001.doc DOC document
20081566A10DET01HOSPITALPADC535.pdf PDF
20081566A10DET01HOSPITALPADC536.pdf PDF
20081566A10DET01HOSPITALPADC532.pdf PDF
20081566A10STP01C512HospitalGrading.pdf PDF
HospitalPadSpecs.pdf PDF
G5-01_Cover.pdf PDF
W91ZRS09B0010.doc DOC document
HospitalPadCDrawings.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 1 – Hospital Pad for the NEDTC ADD1 - 1

EYP/

Einhorn Yaffee Prescott Architecture & Engineering, P.C.

The Argus Building 412 Broadway P.O. Box 617 Albany, New York 12201-0617 Telephone: (518) 431-3300 Fax: (518) 431-3333

To: All Plan Holders

New England Disaster Training Center The Departments of the Army and the Air Force, National Guard Bureau Hospital Pad for the NEDTC East Granby & Windsor Locks, Connecticut

EYP Project Number: 2008905.02

ADDENDUM NUMBER 1 – September 4, 2009

This Addendum forms a part of the Contract Documents and modifies the original Project Manual dated July 10, 2009 and the Drawings dated July 15, 2009.

PROJECT MANUAL

DRAWINGS

Replace with attached revised drawings dated September 4, 2009.

1. C5-00 Hospital Pad Overall Plan

2. C5-01 Hospital Pad Site Preparation

3. C5-11 Hospital Pad Site Plan

4. C5-12 Hospital Pad Grading Plan

5. C5-32 Hospital Pad Construction Details

6. C5-33 Hospital Pad Construction Details

Add drawings dated September 4, 2009.

1. C5-34 Hospital Pad Construction Details

2. C5-35 Hospital Pad Construction Details

3. C5-36 Hospital Pad Construction Details

END OF ADDENDUM NUMBER 2

File details come from the government source that posted it. Updated .