HospitalPadCDrawings.pdf
PDF 4 MB Posted
- Attached to
- Hospital Pad Federal contract opportunity
- Solicitation number
- W91ZRS-09-B-0010
About this file
HOSPITAL PAD FOR NEDTC DRAWINGS DATED 15 JULY 2009 BY EYP
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W91ZRS09B0010-0002.doc | DOC document | |
| PreBid Conference.pdf | ||
| PreBidSiteVisitsigninRoster.pdf | ||
| 20081566A10STP01C500HospitalOverall.pdf | ||
| 20081566A10STP01C501HospitalDemo.pdf | ||
| W91ZRS09B0010-0001.doc | DOC document | |
| 20081566A10DET01HOSPITALPADC533.pdf | ||
| 20081566A10DET01HOSPITALPADC534.pdf | ||
| 20081566A10STP01C511HospitalLayout.pdf | ||
| 20081566A10DET01HOSPITALPADC535.pdf | ||
| 20081566A10DET01HOSPITALPADC536.pdf | ||
| 20081566A10DET01HOSPITALPADC532.pdf | ||
| HospitalPadAdd1.pdf | ||
| 20081566A10STP01C512HospitalGrading.pdf | ||
| HospitalPadSpecs.pdf | ||
| G5-01_Cover.pdf | ||
| W91ZRS09B0010.doc | DOC document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FUSS & O'NEILL
Disciplines to Deliver
Fi le
P at h:
J
:\D W
G \P
\1
6\ A
\C iv il\
P la n\
A
_S
TP
_0
1.
dw g, L ay ou t:
C
5-
H os pi ta l O ve ra ll
F ri, J ul
0,
- 3
:4
P M
U se r:
sh aw nl
CONSULTANTS:
NEW ENGLAND DISASTER
TRAINING CENTER
Camp Hartell Hospital Pad Windsor Locks, Connecticut
REVISION/SUBMISSIONNO.
KEY PLAN:
DATE
DATE:
SCALE:
EYP PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
2008905.02
07.15.2009
HOSPITAL PAD
SITE LOCATION
1"=100'
DFD
SAL
EMB
C5-00
Fi le
P at h:
J
:\D W
G \P
\1
6\ A
\C iv il\
P la n\
A
_S
TP
_0
1.
dw g, L ay ou t:
C
5-
H os pi ta l D em o F ri, J ul
0,
- 3 :4 r:
sh aw nl
Note: Proposed buildings and proposed building interiors have been show for reference only.
Refer to specific architectural sheets for all information on proposed buildings.
HOSPITAL PAD
SITE PREPARATION
1"=20'
DFD
SAL
EMB
C5-01
CONSULTANTS:
NEW ENGLAND DISASTER
TRAINING CENTER
Camp Hartell Hospital Pad Windsor Locks, Connecticut
REVISION/SUBMISSIONNO.
KEY PLAN:
DATE
DATE:
SCALE:
EYP PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
2008905.02
07.15.2009
P at h:
J
:\D W
G \P
\1
6\ A
\C iv il\
P la n\
A
_S
TP
_0
1.
dw g, L ay ou t:
C
5-
H os pi ta l L ay ou t
F ri, J ul
0,
- 3
:4 r:
sh aw nl
Note: Proposed buildings and proposed building interiors have been show for reference only.
Refer to specific architectural sheets for all information on proposed buildings.
HOSPITAL PAD
SITE PLAN
1"=20'
DFD
SAL
EMB
C5-11
CONSULTANTS:
NEW ENGLAND DISASTER
TRAINING CENTER
Camp Hartell Hospital Pad Windsor Locks, Connecticut
REVISION/SUBMISSIONNO.
KEY PLAN:
DATE
DATE:
SCALE:
EYP PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
2008905.02
07.15.2009
P at h:
J
:\D W
G \P
\1
6\ A
\C iv il\
P la n\
A
_S
TP
_0
1.
dw g, L ay ou t:
C
5-
H os pi ta l G ra di ng
Fr i, Ju l 1 0,
- 3
:4 r:
sh aw nl
Note: Proposed buildings and proposed building interiors have been show for reference only.
Refer to specific architectural sheets for all information on proposed buildings.
HOSPITAL PAD
GRADING PLAN
1"=20'
DFD
SAL
EMB
C5-12
CONSULTANTS:
NEW ENGLAND DISASTER
TRAINING CENTER
Camp Hartell Hospital Pad Windsor Locks, Connecticut
REVISION/SUBMISSIONNO.
KEY PLAN:
DATE
DATE:
SCALE:
EYP PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
2008905.02
07.15.2009
HOSPITAL PAD
GENERAL NOTES
NTS
DFD
HDS
EMB
C5-30
CONSULTANTS:
NEW ENGLAND DISASTER
TRAINING CENTER
Camp Hartell NEDTC Hospital Pad Windsor Locks, Connecticut
REVISION/SUBMISSIONNO.
KEY PLAN:
DATE
DATE:
SCALE:
EYP PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
2008905.02
07.15.2009
FUSS & O'NEILL
Disciplines to Deliver
Fi le
P at h:
J
:\D W
G \P
\1
6\ A
\C iv il\
P la n\
A
_D
E T_
-H
O S
P
IT
A L
P A
D .d w g, L ay ou t:
C 5-
G en er al
Ju l 1
0,
- 3 :4 r:
sh aw nl
1. CONSTRUCTION STANDARDS
2. PLAN IMPLEMENTATION
3. INSTALLATION SCHEDULE
4. FUGITIVE DUST
5. HAY BALE LIFE SPAN
6. CATCH BASINS
7. STOCKPILES
8. TOE OF SLOPE
9. SEDIMENT REMOVAL
10. SOIL STABILIZATION SCHEDULE
11. TEMPORARY SEEDING
12. PERMANENT SEEDING
13. INSPECTION
CONSULTANTS:
NEW ENGLAND DISASTER
TRAINING CENTER
Camp Hartell NEDTC Hospital Pad Windsor Locks, Connecticut
REVISION/SUBMISSIONNO.
KEY PLAN:
DATE
DATE:
SCALE:
EYP PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
2008905.02
07.15.2009
FUSS & O'NEILL
Disciplines to Deliver
Fi le
P at h:
J
:\D W
G \P
\1
6\ A
\C iv il\
P la n\
A
_D
E T_
-H
O S
P
IT
A L
P A
D .d w g, L ay ou t:
C 5-
Ju l 1
0,
- 3 :4 r:
sh aw nl
HOSPITAL PAD
CONSTRUCTION DETAILS
NTS
DFD
HDS
C5-31
CONSULTANTS:
NEW ENGLAND DISASTER
TRAINING CENTER
Camp Hartell NEDTC Hospital Pad Windsor Locks, Connecticut
REVISION/SUBMISSIONNO.
KEY PLAN:
DATE
DATE:
SCALE:
EYP PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
2008905.02
07.15.2009
FUSS & O'NEILL
Disciplines to Deliver
Fi le
P at h:
J
:\D W
G \P
\1
6\ A
\C iv il\
P la n\
A
_D
E T_
-H
O S
P
IT
A L
P A
D .d w g, L ay ou t:
C
Ju l 1
0,
- 3 :4 r:
sh aw nl
HOSPITAL PAD
CONSTRUCTION DETAILS
NTS
DFD
HDS
C5-32
CONSULTANTS:
NEW ENGLAND DISASTER
TRAINING CENTER
Camp Hartell NEDTC Hospital Pad Windsor Locks, Connecticut
REVISION/SUBMISSIONNO.
KEY PLAN:
DATE
DATE:
SCALE:
EYP PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
2008905.02
07.15.2009
FUSS & O'NEILL
Disciplines to Deliver
Fi le
P at h:
J
:\D W
G \P
\1
6\ A
\C iv il\
P la n\
A
_D
E T_
-H
O S
P
IT
A L
P A
D .d w g, L ay ou t:
C
Ju l 1
0,
- 3 :4 r:
sh aw nl
HOSPITAL PAD
CONSTRUCTION DETAILS
NTS
DFD
HDS
C5-33
| 20081566A10_STP_01-C5-00 Hospital Overall |
| 20081566A10_STP_01-C5-01 Hospital Demo |
| 20081566A10_STP_01-C5-11 Hospital Layout |
| 20081566A10_STP_01-C5-12 Hospital Grading |
| 20081566A10_DET_01-HOSPITAL PAD-C5-30 General |
| 20081566A10_DET_01-HOSPITAL PAD-C5-31 |
| 20081566A10_DET_01-HOSPITAL PAD-C5-32 |
| 20081566A10_DET_01-HOSPITAL PAD-C5-33 |
File details come from the government source that posted it. Updated .