Attch_1_-_PWS.pdf
PDF 3 MB Posted
- Attached to
- USEUCOM B2308 Badge Relocation
- Solicitation number
- W91WFU-17-T-0020
About this file
Attachment 1 - Performance Work Statement
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combo_Synop_&_Solicit.pdf | ||
| Attch_2_-_DD254.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
31 Aug 2017
EUCOM B2308 Badge Relocation
Part 1
General Information
1. GENERAL: This is a non-personal services contract under which the personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.
1.1 Description of Services/Introduction: This is a non-personal services contract to provide a turn-key
Electronic Security System (ESS) solution for the United States European Command (USEUCOM). The
Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.2 Background: The U.S. Navy’s Space and Naval Warfare Command (SPAWAR) Atlantic Stuttgart Office is providing EUCOM with assistance in providing the necessary changes and additions for the ESS components and devices.
1.3. Scope: The Contractor shall provide non-personal services to include all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, escorting, and all other items necessary for this ESS installation. The contractor shall accomplish a turn-key ESS installation in accordance with EUCOM’s security requirements and the Intelligence Community Directive 705 (ICD 705) and Intelligence Community Standards 705
(ICS 705), Latest Revision, All Volumes.
1.4 Objectives: The objective of this project is to provide a turn-key ESS installation including an Intrusion
Detection System (IDS) and Access Control System (ACS) in accordance with EUCOM’s security requirements and the ICD/ICS 705, ultimately providing EUCOM with a certified special secure area and the security posture necessary for the occupancy of these spaces.
1.5 Period of Performance: The period of performance shall be no longer than nine (9) months from the date of award.
1.6 General Information:
1.6.1 Quality Control Plan (QCP): Reserved.
1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.3 Recognized Holidays: This information is contained in 5152.204-4000 U.S and Host Nation Holidays. US
Holidays Work cannot be performed on U.S. holidays occurring during the normal workweek. When a U.S holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively. Host Nation Holidays Work Can be performed on local Host Nation* holidays occurring during the normal workweek. Local host nation holidays occur in the region/state where contract performance takes place.
Both holidays are listed.
1.6.4 Hours of Operation: The contractor is responsible for conducting business, between the hours of 0730-1730
Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons.
The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.6.5 Training Holidays: USAREUR has historically granted military personnel Training Holidays as compensation for time that they spent in field training. These are typically combined with regular holiday leave schedules (for example, Christmas half days or day on day off schedules). Training Holidays may affect access to military operated facilities. If scheduled work or access to facilities is required, coordination with occupants will be necessary or the work in affected facilities shall be rescheduled after the training holiday. However, announced training holidays or exodus of military personnel may provide the contractor with an opportunity for unrestricted access to facilities and areas. The Contractor shall take full advantage of such opportunities by planning maintenance or actions that are better accomplished when such areas are vacant.
1.6.7 Place of Performance: The work to be performed under this contract will be performed at Patch Barracks, Bldg 2308 and 2302.
1.6.8 Type of Contract: The government will award a Firm-Fixed Price Contract.
1.7 Security Requirements:
1.7.1 Security Program: Contractor personnel performing work under this contract must have a TOP SECRET
SCI clearance at time of the proposal submission, and must maintain the level of security required for the life of the contract. The security requirements are in accordance with the attached DD254.
1.7.2. Personnel Security Clearance Requirements: Contractor personnel performing work under this contract must have an active personnel security clearance at the TOP SECRET SCI level in the Joint Personnel Adjudication System
(JPAS) at time of the proposal submission, and must maintain the level of security required for the life of the contract.
The security requirements are In Accordance With (IAW) the attached DD Form 254, Department Of Defense
Contract Security Classification Specification. The Contractor shall ensure that contractor employees and sub-contractor employees performing services under this contract comply with FAR 52.204-2, Security Requirements when the employee has access to information classified “Confidential,” “Secret,” or “Top Secret.” The Contractor will ensure the employee complies with the Security Agreement (DD Form 441), including the National Industrial
Security Program Operating Manual (DOD 5220.22-M), and any revisions to DOD 5220.22-M, notice of which has been furnished to the Contractor. The contractor needs to send the security clearances of the workers to the
USEUCOM SSO, SMO Code W092AA4 in addition to submitting the Visitor Access Request for the duration of their stay.
1.7.3 Installation Access: See clause 5152-225-4001 -- INSTALLATION CLEARANCE RERQUIREMENTS
(June 2016) in basic contract. USAG Stuttgart Command Policy Memorandum #58, Local national Screening
Program (LNPS) and Installation Access Control. The contractor shall provide an installation pass log within thirty
(30) calendar days after contract award. The pass log shall be updated as employees are added or removed and submitted to the COR within 5 days after changes.
Upon the termination of employment or termination/cancellation of this contract, the Contractor is responsible to collect the installation access passes. The contractor shall collect the installation access passes the same day employment of an individual has expired/terminated, and shall return them to the issuing office within three (3) workdays.”
1.7.3.1 For contractors requiring Common Access Card (CAC): Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled
NACI at the Office of Personnel Management.
1.7.3.2 For contractors that do not require CAC, but require access to a DoD facility or installation: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the
National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database
(TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at
OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.7.3.3 For contractors authorized to accompany the force: Reserved.
1.7.3.4 For Contract Requiring Performance or Delivery in a Foreign Country: DFARS Clause 252.225-7043, Antiterrorism/Force Protection for Defense Contractors Outside the US. The clause shall be used in solicitations and contracts that require performance or delivery in a foreign country. This clause applies to both contingencies and non-contingency support. The key AT requirement is for non-local national contractor personnel to comply with theater clearance requirements and allows the combatant commander to exercise oversight to ensure the contractor’s compliance with combatant commander and subordinate task force commander policies and directives. HSH
1.7.4 Background Checks: See clause 5152.204-4008-Background Checks (June 2016) – U.S. and Host Nation
Contractors. The contractor shall provide an installation pass log within thirty (30) calendar days after contract award.
The pass log shall be updated as employees are added or removed and submitted to the COR within 5 days after changes.
1.7.5 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured IAW AR 190-13, “The Army Physical Security Program.”
1.7.6 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. If applicable, government issued access badges shall not be worn outside designated facilities where visible to the general public. The Contractor shall immediately report suspicious activities to security personnel.
1.7.7 Escort Requirements: The Contractor shall provide all necessary escorts as required to perform the tasking as specified within this PWS and in accordance with the applicable security requirements.
1.7.8 Access and general protection policy and procedures: Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office.
Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition
(FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.7.9 Handling/Access to Classified Information: Reserved.
1.7.10 Threat Awareness Reporting Program: Per AR 381-12 Threat Awareness and Reporting Program
(TARP), contractor employees must receive annual TARP training by a CI agent or other trainer as specified in 2-
4b.
1.8 Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The
Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan, and the
Contractor’s Security Plan [if applicable]. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any incidents of lost or duplicate keys/key cards to the Contracting Officer. In the event keys, other than master keys, are lost or duplicated, the
Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the
Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan [if applicable].
1.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal
Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other
Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.10 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract:
perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.11 Key Personnel: The follow personnel are considered key personnel by the government: Project/Contract
Manager, Project Engineer, Lead Installer. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 0800-1630 Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. Qualifications for all key personnel are listed below:
1.11.1 Special Qualifications: The contractor is responsible for ensuring all technicians possess and maintain the required vendor certifications for this ESS Installation.
1.11.1.1 Project/Contract Manager: Contractor Project/Contract Manager shall have the following qualifications/certifications:
Bachelor of Science degree in Business Administration/Management, Engineering field, or equivalent
Project Management Professional certification
At least six years of experience, managing similar ICD/ICS 705 compliant projects
Lenel Certified
TOP SECRET/SCI clearance
1.11.1.2 Project/Design Engineer: Contractor Project/Design Engineer shall have the following
Bachelor of Science degree in engineering field or equivalent
At least six years of experience on similar ICD/ICS 705 compliant projects
Lenel Certified
1.11.1.3 Lead Installer: Contractor Lead Installer shall have the following qualifications/certifications:
At least six years of Lenel ESS installation experience, performing installs for similar ICD/ICS 705 compliant projects
Lenel Certified
Kaba-Mas Certified
1.11.1.4 System Administrator: Contractor System Administrator/Programmer shall have the following
At least six years of Lenel ESS programming experience, performing installs for similar ICD/ICS 705 compliant projects
Lenel Enterprise Certified
1.11.1.5 Information Assurance (IA) Subject Matter Expert (SME): Contractor IA SME shall have the following
At least six years of Information Assurance experience for similar ICD/ICS 705 compliant projects
CompTIA Advanced Security Practitioner (CASP)
Certified Information Systems Security Professional (CISSP)
1.11.1.6 Other Certifications: Contractor personnel performing any work on any system, component, or device requiring vendor certification shall hold this certification prior to installation. Specifically, contractor personnel performing any work involving the Lenel system, Pelco system, Kaba-Mas or any of these system/device components shall have the proper Lenel, Pelco, Kaba-Mas or applicable certification.
1.12 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are
Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contractor personnel identification shall be easily identifiable through the display of badges IAW AER 27-715 Contractor Identification.
Contractor personnel shall obtain a Stuttgart Community badge and display this badge when working in secure areas.
1.13 Contractor Travel: Reserved.
1.14 Other Direct Costs: Reserved.
1.15 Data Rights: The Government has unlimited rights to all documents/material produced under this contract.
All documents, drawings, and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the
Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.16 Non-Disclosure Requirements Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the
Government or others. Neither the Contractor, nor Contractor personnel, shall divulge, nor release data or information developed, or obtained under performance of this work statement, except to authorize Government personnel or upon written approval of the KO. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall apply, and shall be controlled and protected under the provisions of the Privacy
Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.
The use of propaganda violates DOD Commercial Use of Imagery Guidelines stated at
(http://www.defenseimagery.mil/products/dodimagery/commercialuse.html. The Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any marketing tools to include its company website.
1.16.1 Non-Disclosure Statements: Reserved.
1.17 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5.
The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such
OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.18 Phase In /Phase Out Period: Reserved.
1.19 Safety: The Contractor shall comply with all National Fire Protection Association (NFPA) codes and regulations applicable to this installation.
1.19.1 Safety Plan and Program: Reserved.
1.20 Environmental Compliance: The Contractor shall comply with all host nation environmental requirements.
All removed, unused, or left-over equipment and/or material must be disposed of in compliance with host nation requirements and is the responsibility of the Contractor.
1.20 Environmental Compliance Plan and Program: Reserved.
1.21 Required Training:
1.21.1 Anti-Terrorism (AT) Level I Training: All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 10 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil
1.21.2 AT awareness training for US based contractor personnel traveling overseas: US based contractor employees and associated sub-contractor employees shall receive government provided area of responsibility (AOR) specific AT awareness training as directed by AR 525-13. Specific AOR training content is directed by the combatant commander with the unit ATO being the local point of contact. US based contractor employees and associated sub-contractor employees will submit an Isolated Personnel Report (ISOPREP) prior to deployment, in accordance with AR 525-28, Personnel Recovery. The contractor is required to fill out the survey on NIPRNET at https://prmsglobal.prms.af.mil/prmsconv/Profile/Survey/start.aspx prior to deployment.
USAREUR Travel Portal can be accessed at https://intelshare.intelink.gov/sites/usareur/travel/_layouts/15/start.aspx for use prior to travel to Europe.
http://www.defenseimagery.mil/products/dodimagery/commercialuse.html https://intelshare.intelink.gov/sites/usareur/travel/_layouts/15/start.aspx
1.21.3 OPSEC Training: Per AR 530-1 Operations Security, the contractor employees must complete Level I
OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter. Level I OPSEC training is available at the following website:
http://cdse.edu/catalog/elearning/GS130.html (Duration: 45 minutes).
1.21.4 iWATCH Training: The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract
1.21.5 Information Assurance (IA) Training and Certification:
1.21.5.1 Army Training Certification Tracking System (ATCTS) registration for contractor employees who require access to government information systems: All contractor employees with access to a government info system must be registered in the ATCTS (Army Training Certification Tracking System) at commencement of services, and must successfully complete the DOD Information Assurance Awareness prior to access to the IS and then annually thereafter.
1.21.5.2 For information assurance (IA)/information technology (IT) training: All contractor employees and associated sub-contractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01-M and AR 25-2 within six months of appointment to IA/IT functions.
1.21.5.3 For information assurance (IA)/information technology (IT) certification: Per DoD 8570.01-M , DFARS
252.239.7001 and AR 25-2, the contractor employees supporting IA/IT functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01-M must be completed upon contract
PART 2
DEFINITIONS & ACRONYMS
2. Definitions and Acronyms:
2.1 Definitions:
Contractor - A supplier or vendor awarded a contract to provide specific supplies or service to the government.
The term used in this contract refers to the prime.
Contracting Officer - A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
Contracting Officer's Representative (COR) - An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does
NOT have authority to change the terms and conditions of the contract.
Defective Service - A service output that does not meet the standard of performance associated with the
Performance Work Statement.
Deliverable - Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
Key Personnel - Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
Physical Security - Actions that prevent the loss or damage of Government property.
Quality Assurance - The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
Quality Assurance Surveillance Plan (QASP) - An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
Quality Control - All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
Subcontractor - One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
Work Day - The number of hours per day the Contractor provides services in accordance with the contract.
Work Week - Monday through Friday, unless specified otherwise.
2.2 Acronyms:
ACAS Assured Compliance Assessment Solution
ACOR Alternate Contracting Officer's Representative
ACS Access Control System
AFARS Army Federal Acquisition Regulation Supplement
APL Approved Products List
AR Army Regulation
AT Anti-Terrorism
CCE Contracting Center of Excellence
CFR Code of Federal Regulations
CONUS Continental United States (excludes Alaska and Hawaii)
COR Contracting Officer Representative
COTR Contracting Officer's Technical Representative
COTS Commercial-Off-the-Shelf
DA Department of the Army
DD250 Department of Defense Form 250 (Receiving Report)
DD254 Department of Defense Contract Security Requirement List
DFARS Defense Federal Acquisition Regulation Supplement
DIARMF Defense Information Assurance Risk Management Framework
DISA Defense Information Systems Agency
DMDC Defense Manpower Data Center
DOD Department of Defense eMASS Enterprise Mission Assurance Support Service
ESS Electronic Security System
EUCOM European Command
FAR Federal Acquisition Regulation
HIPAA Health Insurance Portability and Accountability Act of 1996
IA Information Assurance
IDS Intrusion Detection System
KO Contracting Officer
NFPA National Fire Protection Association
OCI Organizational Conflict of Interest
OCONUS Outside Continental United States (includes Alaska and Hawaii)
ODC Other Direct Costs
OPSEC Operational Security
PIPO Phase In/Phase Out
POC Point of Contact
PRS Performance Requirements Summary
PWS Performance Work Statement
QA Quality Assurance
QAP Quality Assurance Program
QASP Quality Assurance Surveillance Plan
QC Quality Control
QCP Quality Control Program
SCAP Security Content Automation Protocol
SPAWAR Space and Naval Warfare Command
SSO Special Security Office
STIG Security Technical Implementation Guide
TE Technical Exhibit
UC Unified Capabilities
USEUCOM United States European Command
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. Government Furnished Items and Services:
3.1 Services: Reserved.
3.2 Facilities: Reserved.
3.3 Utilities: The Government will provide all utilities available in the facility for the contractor’s use in performance of tasks outlined in this PWS. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the faucets, turning off lights, and powering off equipment at the end of the work day.
3.4 Equipment: Reserved.
3.5 Property Management: For all issued GFP for this contract, the contractor shall submit a property management plan within thirty (30) days of contract award to COR and KO that addresses the requirements as listed in FAR Clause 52.245-1, Government Property. Contractor shall ensure GFP is maintained IAW AR 735-5, Policies and Procedures for Property Accountability, in addition to the aforementioned clause.
3.6 Materials: The Government will provide any existing drawings of the places of performance that are available.
3.7 Training: The government will provide training as outlined in section 1.21 of this PWS.
3.8 Common Access Cards (CAC): If required for tasking within this PWS, the Government will provide
Common Access Cards (CAC) via the Trusted Associate Sponsorship System (TASS) (Web site https://www.dmdc.osd.mil/tass/ https://www.dmdc.osd.mil/tass/
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. Contractor Furnished Items and Responsibilities:
4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2 Facility Security Clearance: The contractor shall possess and maintain a TOP SECRET facility clearance from the Defense Security Service IAW DoD 5220.22-M, National Industrial Security Program Operating Manual
(NISPOM) and AR 380-49, Industrial Security Program. The Contractor’s employees, performing work in support of this contract shall have been granted a TOP SECRET/SCI personnel security clearance from the Defense
Industrial Security Clearance Office. The Facility Security Clearance must match the highest security clearance required for personnel. The DD 254, Department Of Defense Contract Security Classification Specification is provided as an attachment in the basic contract.
4.3 Materials: The Contractor shall provide all materials/equipment necessary to meet the requirements of this
PWS.
4.4 Equipment: The Contractor shall provide all vehicles, tools, ladders, safety equipment, testing equipment, lifting and drilling equipment to meet the requirements under this PWS.
4.5 Common Access Cards (CAC): The contractor shall provide the following information: Last, First Middle
Name, Cadency Name, Person identifier (SSN, FIN, or TIN), date of birth, primary email (this email will used to contact the individual) to the COR with 15 calendar days after award. The contractor shall provide a CAC log within the first 30 calendar days after contract award and within 5 calendar days after changes have been made. The
COR will provide the format and content. Note CACs are Government property and must be accounted for.
PART 5
SPECIFIC TASKS
5.1 Basic Services: The contractor shall develop the Installation Design Plan (IDP), and based on the approval (by
Government) of this IDP, shall procure and install ESS devices for this EUCOM Building 2308 Badge Relocation.
The Contractor shall comply with the ICD/ICS 705. In addition, the Contractor shall abide to standards and regulations specified in PWS, Section 6.
5.2 Meetings, Conferences, and Briefings: The Contractor shall attend in-person all the meetings relevant to the
Building 2308 Badge Relocation and closely coordinate access/survey/materials delivery/installation/testing with
Government representative, tenants, Command Security, Special Security Office (SSO) and all other stakeholders.
The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Project Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.
5.3 Coordination Support: Contractor shall work closely with the SPAWAR Government Project Manager, Technical Point of Contact (TPOC), and support the needs of the project at the sponsor level. On-site coordination of meetings, developing agenda items, attending at high-level meetings, generating minutes, and tracking action items shall be required. Support may require a contractor to recommend policies, doctrine, tactics, and procedures at the DoD, Federal, State, and Local level given their past expert opinion or using analysis of actual outcomes.
Project support may require significant coordination and interface with various DoD and non-DoD activities located in and out of OCONUS.
5.4 Plans of Action and Milestone (POA&M): The Contractor shall develop and upkeep a POA&M throughout the life of the contract, to ensure that all deliverables are submitted on time and that the project is aligned with other stakeholders’ efforts.
5.5 IDP Development: The contractor shall develop an Installation Design Plan for the tasking outlined in this
PWS.
5.5.1 The 90%/As-built IDP drawings shall be provided with customization to account for unique elements associated with building 2308. Existing drawings for building 2302 shall be updated to reflect the changes from the relocated equipment. Each design deliverable shall be subject to a SPAWAR TPOC and stakeholder design review approval process, with comments to be incorporated into the next design revision. The contractor shall revise an existing IDP and modify to meet modified Shore Installation Process Handbook (SIPH) format with submittals for approval at conceptual design (30%), equipment specifications (60%), construction (90%), and project completion
(100%) stage. An example of the modified SIPH format will be provided upon request and within ten (10) days after award. The IDP shall be developed to convey the installation and operational provisions of the installation in sufficient detail to ensure no misunderstanding of design intentions or functional capabilities. All other devices and equipment within this building shall be included in this packages for building 2308 to include any equipment that is existing. Each building, if applicable, shall have its own package prepared. If any equipment or devices are not modified by this tasking, the existing IDPs shall be used to be incorporated into this new package. The IDPs shall be created using AutoCAD 2012 or latest version, and provided electronically in PDF and CAD. For the As-built IDP, the contractor shall provide electronically in PDF and CAD format.
5.5.2 The design reviews shall be structured and include at a minimum the following sections for each review.
5.5.2.1 30% Design Review:
020: Vicinity Site Map
040: Floorplan
060: Simplified Block Diagrams
160: Cable Routing Layout
5.5.2.2 60% Design Review
Sections from 30% Review updated as necessary
022: Master Parts List (Excel version)
040: Floorplans and Elevations
070: Cabling Block Diagrams (utilize 060's to begin)
5.5.2.3 90% Design Review
Sections from 60% Review updated as necessary
022: Master Parts List (CAD version)
040: with bubble call outs
070: with bubble call outs
080: Cable Run Sheets
120: Labeling
130: Patch Panel Layouts
140: Power Distribution (if needed)
180: Misc. Install Details
5.6 Materials Procurement: The Contractor shall procure all the equipment/materials listed in the IDP and any other miscellaneous materials required for installation not specifically identified within the IDP to produce an operational and functioning system, in accordance with the EUCOM SSO and the ICD/ICS 705. The Contractor shall provide all procurement and tracking information as required by the SSO.
5.7 Materials Storage/Site Delivery: The Contractor shall store procured installation equipment/materials in the local Contractor provided secure storage facility, in accordance with the ICD/ICS 705. The Contractor shall coordinate and deliver installation equipment/materials in a Just-In-Time manner.
5.8 Installation: The Contractor shall install all equipment/materials in accordance with this PWS and the ICD/ICS
705, All Volumes (Latest Revision). The requested equipment has to be brand name or equal to below:
Installation requirements: The requested equipment is to be brand name or equal to the list of equipment provided in this PWS. Equivalent equipment is acceptable that meet or exceed requirements and specifications of the example parts and requirements within this PWS.
5.8.1 Building 2303
5.8.1.1 Building 2308 1st Floor Room 124 (New Badging Office)
5.8.1.1.1 Procure and install one (1) Lenel Enclosure (LNL-CTX) with one (1) Intelligent Dual Reader
Controller (LNL-2220), and one (1) Dual Reader Module (LNL-1320)
5.8.1.1.2 Procure and install one (1) UL Listed Altronix Power Supply (AL600ULXD) and one (1) Power
Distribution (PD4) module.
5.8.1.1.3 Procure and install one (1) Hoffman Enclosure (CSD16168 or similar) along with sufficient batteries to power all IDS/ACS devices for 8 hours (estimated at 3 Yuasa NP12-12) batteries.
5.8.1.1.4 Procure and install one (1) Lenel Arming Control Unit (LNL-CK) and program the room to an S+
Segment for all IDS devices inside
5.8.1.1.5 Procure and install two (2) Interlogix 360 Degree Motion Detectors (AP 669) and position two of them to cover the windows and the door to room 124
5.8.1.1.6 Procure and install one (1) Magnasphere Level 2 High Security Switch (HSS-L2D-000) on the entrance door
5.8.1.1.7 Procure and install one (1) Lockmaster STC-50 rate door with integrated Lockmaster LKM-7000
Series lock and CDX-10 High Security Combination Lock
5.8.1.1.8 Procure and install one (1) HID PIVClass Card Reader with Keypad (RPK40) and position on the unsecured side of room 124
5.8.1.1.9 Procure and install two (2) STI Momentary Switch as a remote door release/REX located at the two badging workstations
5.8.1.1.10 Procure and install one (1) doorbell chime device on the exterior of Room 124 along with lamented signage to indicate visitors should press doorbell for Badge service. Verbiage to be refined during design.
5.8.1.1.11 Re-locate and install one (1) of the existing Lenel Badging Workstations from B2302, Room 124 to include the workstation, monitor, keyboard, mouse, power cables, Badge Printer, Badging Camera and any other components required to make the badging workstation function in B2308
5.8.1.1.11.1. Connect the workstation in B2308 to ESS Switch in Room 027
5.8.1.1.11.2. Workstation located in the front portion of the B2302 Room 128 is to be removed, secondary workstation is to be left and remain in an operational condition
5.8.1.1.11.3. Include any/all Lenel licensing required to make the secondary badge workstation operational. See
“Building 2302 1st Floor, Room 122” Section for details
5.8.1.1.12 Procure and install one (1) NEW badging workstation in B2308 Room 124
5.8.1.1.12.1. Badging workstation to include Lenel PC, Keyboard/Mouse/Monitor, one (1) Fargo Badge Printer, double sided, laminate (HDP 5000), and badging Camera
5.8.1.1.12.2. Connect the workstation in B2308 to ESS Switch in Room 027
5.8.1.1.12.3. Provide all required software to make the badging workstation operational which should include at a minimum: ID Credential Center Application, Badge Designer Application, Image Capture, and ID
Printing licenses. As well as Microsoft office: Word, Excel, etc.
5.8.1.1.13 Procure and install one (1) Report Printer for shared use between the two badge workstations.
5.8.1.1.14 Procure and install one (1) HID PIVClass Card Reader with Keypad (RPK40) as a Test Reader for users to validate newly created badges
5.8.1.1.15 Procure and install one (1) 24” display in view of the primary badging workstations and display the two indoor Pelco camera feeds to this display
5.8.1.1.15.1. Procure and install one (1) Pelco Network Video Decoder (NET5402-HD)
5.8.1.1.15.2. Procure and install one (1) Pelco Workstation (CPPC) to control and display the video feeds
5.8.1.1.16 Procure and install one (1) Pelco Indoor Fixed Dome Camera, 1080P (IBP221) just outside Room 124 to show people requesting entry/waiting for badging services
5.8.1.1.16.1. Configure display in Room 124 to show this video feed and route to main Pelco DVR storage
5.8.1.1.16.2. Connect to new PoE Switch in Basement Room 027
5.8.1.2 Building 2308 1st Floor Main Hallway (West) – Wing that includes Room 124
5.8.1.2.1 Procure and install one (1) Securitron Maglock (M32 or equivalent) to secure the outer hallway doorway with request to exit device
5.8.1.2.2 Procure and install one (1) HID PIVClass Card Reader with Keypad (RPK40) and position on the unsecured side of the hallway door.
5.8.1.2.2.1. Connect RPK40 to Lenel Modules in Room 124
5.8.1.2.3 Procure and install one (1) STI Momentary Request to Exit Button and one (1) STI latching
Emergency Exit switch
5.8.1.2.4 Procure and install one (1) Pelco Indoor Fixed Dome Camera, 1080P (IBP221) just outside the hallway door to show people entering hallway
5.8.1.2.4.1. Configure display in Room 124 to show this video feed and route to main Pelco DVR storage
5.8.1.2.4.2. Connect to new PoE Switch in Basement Room 027
5.8.1.3 Building 2308 Basement, Room 027
5.8.1.3.1 Procure and install one (1) new Cisco PoE capable switch (SGP2000P or better) and connect the new
Pelco PoE Cameras to the switch
5.8.1.4 Building 2302 1st Floor, Room 122
5.8.1.4.1 Procure and install any/all Lenel licensing required to make the 2nd badge workstation operational.
5.8.1.4.1.1. Badge workstation is existing GFE but only has limited Lenel account rights. Requires the following licenses: ID Credential Center Application, Badge Designer Application, Image Capture, and ID
Printing licenses.
5.9 ESS Signage Requirements:
5.9.1 Contractor shall procure and install USAG-S approved ESS signage at entrances and emergency exits to include LED Status displays, exit card reader usage, emergency alarm annunciation, arming and disarming instructions, and opening and closing procedures.
5.10 Information Assurance (IA) Requirements:
5.10.1 The contractor shall update existing network diagrams and IA artifacts currently uploaded to the Enterprise
Mission Assurance Support Service (eMASS) to include required scans of installed equipment. Artifacts include, but are not limited to, the Boundary Diagram, Hardware/Software Lists, Ports, Protocols, and Services List, Data Flow
Diagram, and all related security checklists and scans to include Defense Information Systems Agency (DISA)
Security Technical Implementation Guides (STIG) checklists, Security Content Automation Protocol (SCAP) Scans, and Assured Compliance Assessment Solution (ACAS) scans for all added/modified network equipment, workstations, servers, and any device with an IP address. Existing artifacts will be made available post-award.
Vulnerability scanner will be provided for use.
5.10.2 Equipment installed must be compatible with the USAG-S Enterprise ESS and must meet the Defense
Information Assurance Risk Management Framework (DIARMF) requirements and latest STIGs.
5.10.3 Any network switch installed shall be on the DISA Unified Capabilities (UC) Approved Products List
(APL)
5.11 Vendor and Equipment Specifications: Specific vendor equipment is specified in this PWS for estimation purposes and quality requirements. Equivalent equipment is acceptable that meet or exceed requirements and specifications of the example parts and requirements within this PWS. Specific quantities of logic boards, devices, and modules are provided as an estimate. The Contract shall procure and install all necessary boards, modules, devices, connectors, media converters, transceivers, network devices, patch panels, and all other supporting devices to ensure an operational and functional end product that meets the security requirements for these spaces.
5.12 System Operational Verification Test (SOVT): The Contractor shall develop and perform the SOVT per
Government specifications and in the latest SOVT Preparation and Execution Guide (SPEG) for all newly installed
ESS and CCTV devices as well as the existing systems transitioned by the Contractor. The SOVT Plan will include procedures for verifying the technical and functional requirements. Contractor shall include test procedures and equipment in accordance to industry best practices and DoD guidelines (PWS Para 6.1).
5.12.1 Fiber Cabling Testing: For fiber optic cabling, Contractor shall perform bi-directional Optical Time
Dispersion Reflectance (OTDR), Power Loss, Chromatic Dispersion (CD) and Polarization Mode Dispersion (PMD) testing, in accordance with PWS Reference 6.1.26. Contractor shall capture and incorporate test results within
Government acceptance SOVT.
5.12.2 CAT6 Cabling Testing: For CAT6 cabling, Contractor shall perform “Permanent or Basic Link” testing in accordance with PWS Reference 6.1.26.
5.12.3 Grounding Testing: For grounding cabling, Contractor shall perform ground resistance test in accordance with PWS Reference 6.1.11 – 6.1.20, 6.1.25, 6.1.26.
5.13 Site Cleanup: The Contractor shall keep the work area clean and dispose of any waste and excess debris, in accordance with Host Nation laws/codes, at the end of each work day. The Contractor shall remove all legacy and unused equipment and/or material from the site and dispose according to site or Defense Reutilization Management
Office (DRMO) requirements.
5.14 Closeout Package: The Contractor shall provide to the Government the final turnover documents electronically via AMRDEC SAFE File Exchange to include:
a) Final documentation of operation and maintenance manuals.
c) Compiled baseline and final project schedules in a single…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .