RFI_2_Replace_Boilers_Bldgs_P-46_&_P-3.pdf
PDF 166 KB Posted
- Attached to
- Replace Boilers Buildings P-46 & P-3 Federal contract opportunity
- Solicitation number
- W91SMC-17-B-0002
About this file
Response to Questions #2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI_1_Replace_Boilers_Bldgs_P-46_&_P-3.pdf | ||
| W91SMC-17-B-0002-0003-_Solicitation_Amendment_3.pdf | ||
| SBSA_Pre-Bid_Slides_-_Replace_Boilers.pdf | ||
| Site_Visit_Minutes_01_Jun_17.pdf | ||
| W91SMC-17-B-0002-0002-_Solicitation_Amendment_2.pdf | ||
| Site_Visit_Sign-In_-_Replace_Boilers.pdf | ||
| W91SMC-17-B-0002-0001-_Solicitation_Amendment_1.pdf | ||
| W91SMC-17-B-0002_-_Solicitation.pdf | ||
| Attachment_-_Existing_Plans_for_P-46.pdf | ||
| Scope_of_Work_(SOW)_-_Replace_Boilers_P-46_and_P-3.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT DCFT172004
SOLICITATION/IFB # W91SMC-17-B-0002/REPLACE BOILERS BLDGS P-46 & P-3
REQUEST FOR INFORMATION (RFI) #2 20 JUN 2017
Q1. The existing UH-1, 2 & 3 unit heater steam coils do not have a control valve. Are control valves to be added on these existing unit heaters? If control valves are to be added, should they be 2-way or 3-way?
A1. No valves added to unit heaters.
Q 2. AHU-1 has an existing 2-position, 2-way control valve on the AHU steam coil. Is this existing steam coil and control valve the correct size for hot water?
A2. The SOW requires the contractor to size all components for the transition from steam to hot water in Building 3. (See Paragraph 1.3.2 of the SOW)