W91QVN-19-R-0301-0003.pdf
PDF 206 KB Posted
- Solicitation number
- W91QVN-19-R-0301
About this file
Amendment 0003
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 5
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
25-Oct-2019
4. REQUISITION/PURCHASE REQ. NO. 5. P ROJECT NO.(If applicable)
6. ISSUED BY CODE W91QVN 7. ADMINISTERED BY (Ifother than item6) CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
SERVICES DIV, UNIT #15289
APO AP 96271
UNITED STATES
See Item 6
8. NAME AND ADDRESS OF CONT RACT OR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICIT AT ION NO.
W91QVN19R0301
X 9B. DATED (SEE ITEM 11)
27-Sep-2019
10A. MOD. OF CONT RACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. T HIS ITEM ONLY APPLIES TO AMENDMENT S OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt ofthis amendment prior to the hour and date specified in the solicitation or as amended by one ofthe following methods:
(a) By completing Items 8 and 15, and returning 1 copies ofthe amendment; (b) By acknowledging receipt ofthis amendment on each copy ofthe offer submitted;
or (c) By separate letter or telegramwhich includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. Ifby virtue ofthis amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegramor letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNT ING AND APPROPRIAT ION DAT A (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICAT IONS OF CONT RACTS/ORDERS.
IT MODIFIES T HE CONT RACT /ORDER NO. AS DESCRIBED IN ITEM 14.
A. T HIS CHANGE ORDER IS ISSUED PURSUANT T O: (Specify authority) THE CHANGES SET FORT H IN ITEM 14 ARE MADE IN THE
CONT RACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED TO REFLECT THE ADMINIST RAT IVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO T HE AUT HORIT Y OF FAR 43.103(B).
C. T HIS SUPPLEMENTAL AGREEMENT IS ENT ERED INT O PURSUANT TO AUT HORIT Y OF:
D. OTHER (Specify type of modification and authority)
E. IMPORT ANT : Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT /MODIFICAT ION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See Continuation Page
Except as provided herein, all terms and conditions ofthe document referenced in Item9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONT RACTING OFFICER (Type or print)
TEL: EMAIL:
15B. CONT RACT OR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNIT ED ST AT ES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
25-Oct-2019
EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
30-105-04 ST ANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W91QVN19R0301
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
NARRATIVE AMENDMENT 0003
The purpose of this amendment is to respond to questions the following also applies.
a. Section 13L. ADDITIONAL SOLICITATION REQUIREMENTS: has been changed from four (4) to five (5) as follows: one (1) original (un-redacted) and five (5) redacted for six (6) totals.
From:
ADDITIONAL SOLICITATION REQUIREMENTS: Sealed offers in original and 4 copies to perform the work required to
To:
ADDITIONAL SOLICITATION REQUIREMENTS: Sealed offers in original and 5 copies to perform the work required to
b. The number of Handholds (HHs) has increased from 12 to 18 see the question 3 in government response to Questions.
c. Three attachments added to solicitation package and section J # 13 A, B and C Daegu Combined
Files and Attachment #14 Government response to Questions. There are no files associated with Attachment # 7 through Attachment # 11.
d. Revised Attachment 2 EDP Daegu 25 Oct 19 attached.
e. All other terms and conditions remains unchanged.
SECTION A - SOLICITATION/CONTRACT FORM
The number of offeror copies required has increased by 1 from 4 to 5.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
LIST OF ATTACHMENTS
List of Attachments
Attachment # 1: Past Performance Questionnaire
Attachment # 2: Daegu Engineering Design Plan
Attachment # 3: Daegu Air Base OSP Maps
Attachment # 4: Consolidated Man-hole-Hand hole Drawings
Attachment # 5: Daegu EAL Template
Attachment # 6 Price Sheet
Attachment # 7: No attached File
Attachment # 8: No Attached File
Attachment # 9: No Attached File
Attachment # 10: No Attached File
Attachment # 11: No Attached File
Attachment # 12: Government Response to Questions
Attachment # 13: A Daegu Combined Files
Attachment # 13: B Daegu Combined Files
Attachment # 13: C Daegu Combined Files
Attachment # 14: GOVT Response to Questions
(End of Summary of Changes)
| SUMMARY OF CHANGES |
| a. Section 13L. ADDITIONAL SOLICITATION REQUIREMENTS: has been changed from four (4) to five (5) as follows: one (1) original (un-redacted) and five (5) redacted for six (6) totals. |
| From: |
| To: |
b. The number of Handholds (HHs) has increased from 12 to 18 see the question 3 in government response to Questions.
File details come from the government source that posted it.