Solicitation.pdf
PDF 546 KB Posted
- Attached to
- Drop Arm Barrier at Osan AB
- Solicitation number
- W91QVN19R0085
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91QVN19R0085-0002.pdf | ||
| W91QVN19R0085-0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W91QVN19R0085 22-Jan-2019
b. TELEPHONE NUMBER
315-755-3394
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 01 Feb 2019
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W91QVN9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MS. KANG, SU-CHONG
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
F3J3C28330AW01
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
CONSTRUCTION & SUPPLY DIV, UNIT #15289
APO AP 96271
UNITED STATES
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE F3J3C2 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
51 SFS/SFOI
OSAN AB
APO AP 96278
TEL: FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
NAICS:
332999
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF15
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W91QVN19R0085
Section SF 1449 - CONTINUATION SHEET
SOW
1. Scope of Work:
1.1. Six (6) Delta Scientific IP500 (M) Quick Deployment Crash Beam Drop-Arm Barriers or Equal will be installed/configured in accordance with Manufacturer’s recommended procedures, the Unified Facilities Criteria (UFC) 4-022-02, and US Army Corps of Engineers (USACE) Protective Design Center (PDC) requirements.
1.2. The contractor shall furnish all management, supervision, labor, equipment, material, transportation, and supplies required to supply and install six (6) Delta Scientific IP500(M) Quick Deployment Crash Beam Drop-Arm Barriers or Equal at Osan AB (OAB), Republic of Korea (ROK). The contractor shall configure the system as described and shown in this Statement of work (SOW). The system shall include all required equipment necessary.
2. Delta Scientific IP500(M) Quick Deployment Crash Beam Drop-Arm Barriers or Equal Project Overview:
2.1. The contractor shall provide all necessary equipment, labor, and tools required to provide and six Delta Scientific IP500(M) Quick Deployment Crash Beam Drop-Arm Barriers or Equal. The contractor shall be responsible for providing and installing any additional items not explicitly specified in this SOW as required for a complete and fully operational system as specified within this SOW.
2.2. The barriers shall be non-proprietary and shall be available through multiple distribution channels.
Systems/components that are commercially available equipment shall be accepted.
2.3. The contractor shall be responsible for coordinating all construction work in conjunction with this SOW’s specifications including, but not limited to, ground work, electrical work and supplies. Any additional requirements shall be installed.
2.4. Six (6) Delta Scientific IP500(M) Quick Deployment Crash Beam Drop-Arm Barriers or Equal: At a minimum, the following equipment shall be provided and installed at OAB, including but not limited to:
2.4.1. Modular in construction and configured for expedited deployment and, as needed, retrieval and relocation.
2.4.2. Raised and lowered manually with the weight of the drop arm being balanced by a counter-balance system.
2.4.3 An above grade, transportable assembly.
2.4.4. Rigid crash beam hinged at one end, raised and lowered manually.
2.4.5. K4 rated in accordance with Department of State specification for vehicle crash testing of perimeter barriers and gates SD-SDT-02.01.
2.4.6. When in the down/locked position the beam shall present a formidable obstacle to approaching vehicles.
2.4.7. Upon vehicle impact, the force shall first be absorbed by the beam assembly and then transmitted to the concrete-filled barrier containers.
2.4.8. Height of the Barrier shall nominally be 34 inches as measured from the roadway surface to the center line of the crash beam drop arm.
2.4.9. The standard clear opening shall be 180 inches as measured inside to inside of the concrete-filled barrier containers.
2.4.10. All external surfaces of the barrier assembly shall have a rust inhibiting painted surface.
2.4.11. The insides of the concrete-filled barrier containers shall be asphalt emulsion coated for corrosion protection.
2.4.12. The drop arm beam shall be furnished with red reflective tape sufficient to provide alternate 20 inch bands on the drop arm.
2.4.13. Complete installation by vendor to ensure system is fully operational.
2.4.14. The barrier shall be provided with a locking pin with padlock locking point to secure the Barrier in the guard position. Padlock to be furnished by others.
2.4.15 Finish. Coatings shall be standard white paint. The drop-arm must include reflective tape.
2.4.16. The Barrier system shall be crated or mounted on skids as necessary to prevent damage from handling. The shipping container(s) shall be of sufficient structural integrity to enable the assembly to be lifted and transported by overhead crane or forklift without failure.
2.4.17. Vendor must supply complete manufacturers installation instructions/drawing diagrams.
2.4.18. Example Product:
NOTE: The exact sites where the six Delta Scientific IP500(M) Quick Deployment Crash Beam Drop-Arm Barriers or Equal are to be installed shall be coordinated with Receiving Officer (RO) to ensure appropriate positioning.
2.5. Removal and Disposition of Existing ground/pavement: The contractor shall be responsible for the leveling the ground underneath the pods to be flat, level, and stable to ensure the system operates as required per the manufacturer’s instructions.
2.6. Materials – All materials furnished by the contractor shall be new.
2.7. Damage to underground conduit/infrastructure: .Approval is required prior to initiation on of work, contractor shall use cable locating devices such as scanner to trace the line of electric cables. Contractor shall take extra care to ensure that the conduit/infrastructure is not crushed from the use of heavy equipment over the conduit. If the conduit is found to be damaged, the contractor shall replace the conduit at their own expense.
2.7.1. If Rigid Metal Conduit (RMC) damaged, RMC conduit shall be steel, hot-dipped galvanized inside and outside. When tested in accordance with ASTM A90, zinc coating of rigid metal conduit shall be a minimum of 1.5 ounces per square foot inside and out. Electrical metallic tubing (EMT) and intermediate metal conduit (IMC) shall be steel, galvanized on the outside and protected on the inside with a suitable corrosion-resistant material. Fittings shall be rain-tight. Set screw and pressure cast fittings will not be permitted. Steel compression fittings will be allowed.
2.7.2. If Flexible conduit is damaged, it shall be liquid-tight. All conduit ends shall be reamed to remove burrs and sharp edges. Where conduit is threaded in the field, a standard conduit-cutting die with a 3/4 inch taper per foot shall be used. All PVC conduit terminations shall be fitted with bushings or bell ends. All metal conduit terminations shall be fitted with a grounding type bushing except for conduit used for duct cable casing that does not terminate in a ground box.
2.8. Transportation/Site Access & Security. The contractor shall be responsible for the transportation of personnel and the materials to the work site. Access to the site and material storage shall be coordinated with RO. The contractor shall be responsible for the security and condition of any materials or equipment stored on site prior to government acceptance.
2.9. The contractor shall coordinate all activities, including but not limited to site preparation, system installations, and systems inspection and acceptance with the RO. The contractor may request access to the sites prior to scheduled installation to conduct site investigations or preparations by coordinating in advance with the RO. Any pre-installation site investigations requested by the contractor shall be conducted at no additional cost to the government and shall not delay the schedule of installations.
DELIVERY & PAYMENT INSTRUCTION
(Addendum to FAR 52.212-4 Contract Terms and Conditions-Commercial Items)
1. INSPECTION AND ACCEPTANCE: Receiving Officer or his authorized representative at the respective delivery point shall conduct inspection for condition, quality, quantity count, and final acceptance of the supplies delivered under this contract.
2. SHIP/DELIVER TO.
51st Security Forces Squadron/S5X Osan Air Base
Receiving Officer is TSgt Michael Stark, (DSN) 784-9542, (Commercial) 031-661-9542 email at michael.stark.5@us.af.mil
3. INSPECTION AND ACCEPTANCE: Proposed item shall meet the O&MA Specifications as specified in the terms and conditions. Inspection for condition, quality, quantity count, and final acceptance of the supplies delivered under this purchase/delivery order shall be conducted by Receiving Officer or his authorized representative at the final destination point in Korea.
4. PAYMENT: Partial payment is authorized. All requests for payment, invoice, and payment status will be referred to address in block 18a on SF1449 or block 15 on DD1155. All problems with payment of accounts will be directed to the same office. Telephone inquiries may be made between 8 am and 11 am, Monday through Friday in
Korea Standard Time. Phone: (011-822) 7913-4570. Payment will be made NET 30 days from date of receipt of invoice in paying office or acceptance of materials/services by the Receiving Officer in Korea, whichever is later.
5. NOTICE TO RECEIVING OFFICER (KOREA); Upon receipt and acceptance of supplies/services, the receiving report shall be submitted electronically through Wide Area Work Flow-Receipt and Acceptance (WAWF) at the web site https://wawf.eb.mil/.
CAUTIONS: Failure to provide a completed receiving report in a timely manner may result in a loss of a discount and/or incur interest penalties, in which event the Receiving Officer is required to furnish a reason for the delay.
6. RECEIVING OFFICER’S NOTIFICATION TO PURCHASING ACTIVITY OF NON-RECEIPT, DAMAGE OR NON-CONFORMANCE: The Receiving Officer shall notify the Purchasing Office promptly after date of delivery specifies in the order, of supplies not received, damaged in transit, or not conforming to specifications of the purchase order. Only under extenuating circumstances should such notification be made later than 15 days after specified date of delivery.
7. INVOICE SUBMITTAL: The Contractor shall submit the invoice IAW 252.232-7003 Electronic Submission of Payment Request and Receiving Report. The invoice shall be submitted electronically through Wide Area Work Flow-Receipt and Acceptance (WAWF) at the web site https://wawf.eb.mil/.
WIDE AREA WORK FLOW (WAWF) ARMY ELECTRONIC INVOICING INSTRUCTIONS
Invoices for goods received or services rendered under this contract shall be submitted electronically through Wide Area Work Flow – Receipt and Acceptance (WAWF):
The vendor shall self-register at the web site https://wawf.eb.mil. Vendor training is available on the internet at https://wawftraining.eb.mil. If you are experiencing technical problems with Wide Area Workflow, please contact below service center.
Customer Service Center
CONUS ONLY: 1-866-618-5988
COMMERCIAL: 801-605-7095
DSN: 388-7095
FAX COMMERCIAL: 801-605-7453
FAX DSN: 388-7453
CSCASSIG@CSD.DISA.MIL
A separate invoice will be prepared for every modification.
For Supplies: Select the Create Invoice and Receiving Report COMBO within WAWF as the invoice type. The Invoice and Receiving Report COMBO prepares the Material Inspection and Receiving Report, DD Form 250, and the Invoice at the same time.
Select the invoice type within WAWF as specified below. Back up documentation (such as timesheets, etc.) can be included and attached to the invoice in WAWF.
Attachments created in any Microsoft Office product are attachable to the invoice in WAWF.
The following information, regarding invoice routine DODAAC’s, must be e entered for completion of the invoice in WAWF:
WAWF Invoice Type: COMBO Issuing Office DODAAC W91QVN Admin Office DODAAC W91QVN Inspector DODAAC (if applicable) F3J3C2 Ship To DODAAC (for Combo), F3J3C2 Service Acceptor DODAAC (for 2 in 1), Service Approver DODAAC (for Cost Voucher) (if applicable)
Acceptor DODAAC (if applicable) F3J3C2 Paying Office DODAAC F87700
QUOTATION INSTRUCTIONS
(ADDENDUM TO FAR 52.212-1, INSTRUCTIONS TO THE OFFEROR(S))
1. Proposal shall be submitted to the Federal Business Opportunities (FBO) website (https://www.fbo.gov/) of if FBO is not available, email to suchong.kang.ln@mail.mil and anthony.s.mosley.civ@mail.mil with the evidence document such as screen shot. The FBO unavailability is limited to only FBO server problem not individual failure/problem. The Government requests all questions be emailed to Ms. Kang, Su Chong, Contract Specialist, email: suchong.kang.ln@mail.mil and anthony.s.mosley.civ@mail.mil within 3 calendar days after the site orignation is conducted. The electronic proposal shall be submitted by the closing date and time of the solicitation.
Partial quote will not be accepted.
2. The offeror(s) shall submit the following requirements IAW paragraph 1 above. A failure to submit the following requirements will be grounds for determining the offer to be incomplete and ineligible for contract award.
2.1. Technical Proposal
2.1.1. Specifications and Technical Approach: The offeror shall provide their technical approach for achieving the contract requirements. The offeror shall provide a brief discussion of the requirements for purchasing and installing all 6 Brand name or Equal barriers. The offeror shall clearly identify its understanding of the required purchase, install and deliverable that are required to achieve the contract requirements specified in the SOW. In addition the offeror shall identify any limiting factors associated with the proposed technical approach along with mitigation strategies for such and all assumptions made when developing its response. The offeror shall provide K4 rating certification of proposed item, proposed barrier shall be crash tested and certified by a certifying agency such as Department of State, Department of Defense, ASTM IAW SOW paragraph 2.4.5.
Note: The Offeror shall submit detailed information that conforms to FAR Provision 52.211-6 if proposing Equal products***
2.2. Price Proposal. The offeror shall break out their pricing by CLIN.
2.3. Past Performance (see DFARS 252.213-7000 Notice to Prospective Suppliers on Use of Past Performance Information Retrieval System--Statistical Reporting in Past Performance Evaluations): This factor will be evaluated as acceptable or unacceptable basis. In determining the acceptability, each quoter shall be required to submit Past Performance Information within the last three (3) years in accordance with responses received to FAR 52.212-1, Instructions to Quoters - Commercial Items. The Government reserves the right to obtain past performance from any reasonable source available, including Government databases in order to evaluate past performance. Quotes having no relevant performance history will be given a neutral rating. The neutral rating will be considered as acceptable basis.
3. Site Visit:
One site visit is scheduled as listed below. Interested vendors are highly encouraged to attend the site visit.
The site visit will be conducted at Osan Air Base.
All persons under escort in the site visit area must bring valid Korean Identification Card or Driver's License, or Passport. (Personnel that do not have their identification card shall not be given access.)
Participants will meet at--
Date: 25 January 2019 Time: 1000 hours Location to meet: Morin Gate VCC, Osan Air Base
POC:
TSgt Michael Stark, email: michael.stark.5@us.af.mil, (DSN) 784-9542 (Commercial) 0503-384-9542 Capt Taylor Blain, email: taylor.blain.1@us.af.mil, (DSN) 784-9531 (Commercial) 0503-384-9531
4. Quotation shall be valid no less than 60 calendar days.
5. The terms “Quotation” and “Quoter” shall be substituted for “Offer” and “Offeror” in this solicitation.
BASIS OF AWARD
Award will be made to the responsible offeror(s) submitting the lowest priced, technically acceptable (LPTA) offer(s) that satisfies all terms and conditions of this solicitation. The Government intends to evaluate proposals and award a contract without discussions with offerors, if it is determined to be most advantageous to the Government.
This solicitation is be issued in accordance with FAR SubPart 13 – Simplified Acquisition Procedures.
Factor A: Technical Capability:
The Government will evaluate the offeror’s proposal against Government’s minimum requirements as specified on the solicitation to determine whether the proposal is acceptable or unacceptable using the ratings and descriptions outlined in table below.
Technical Acceptable/Unacceptable Ratings Rating Description Acceptable Proposal meets the minimum requirements of the solicitation Unacceptable Proposal does not meet the minimum requirements of the solicitation
Factor B: Price: The Offeror’s CLIN prices will be evaluated for reasonableness.
Factor C: Past Performance (see DFARS 252.213-7000 Notice to Prospective Suppliers on Use of Past Performance Information Retrieval System--Statistical Reporting in Past Performance Evaluations): This factor will be evaluated as acceptable or unacceptabe basis. In determining the acceptability, each quoter shall be required to submit Past Performance Information within the last three (3) years in accordance with responses received to FAR 52.212-1, Instructions to Quoters - Commercial Items. The Government reserves the right to obtain past performance from any reasonable source available, including Government databases in order to evaluate past performance. Quotes having no relevant performance history will be given a neutral rating. The neutral rating will be considered as acceptable basis.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 6 Each Drop Arm Barrier
FFP
Model: IP500(M) or equal Manufacturer: Delta Scientific Corporation Barrier Rating: K4
FOB: Destination MFR PART NR: Null
PURCHASE REQUEST NUMBER: F3J3C28330AW01
PSC CD: 6350
NET AMT
CLAUSES INCORPORATED BY REFERENCE
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
OCT 2018
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters
OCT 2018
52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018 52.212-5 Contract Terms and Conditions Required to Implement
Statutes or Executive Orders--Commercial Items
OCT 2018
52.222-50 Alt I Combating Trafficking in Persons (MAR 2015) Alternate I MAR 2015 52.225-14 Inconsistency Between English Version And Translation Of
Contract
FEB 2000
52.232-40 Providing Accelerated Payments to Small Business Subcontractors
DEC 2013
52.247-34 F.O.B. Destination NOV 1991 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
OCT 2016
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism
OCT 2015
252.211-7003 Item Unique Identification and Valuation MAR 2016 252.211-7008 Use of Government-Assigned Serial Numbers SEP 2010 252.225-7012 Preference For Certain Domestic Commodities DEC 2017 252.225-7041 Correspondence in English JUN 1997 252.225-7993 (Dev) Prohibition on Providing Funds to the Enemy (Deviation
2015-O0016)
SEP 2015
252.229-7000 Invoices Exclusive of Taxes or Duties JUN 1997 252.232-7008 Assignment of Claims (Overseas) JUN 1997
252.232-7010 Levies on Contract Payments DEC 2006 252.233-7001 Choice of Law (Overseas) JUN 1997 252.243-7001 Pricing Of Contract Modifications DEC 1991
CLAUSES INCORPORATED BY FULL TEXT
52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND VEGETATION (APR 1984)
The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation. If the Contractor's failure to use reasonable care causes damage to any of this property, the Contractor shall replace or repair the damage at no expense to the Government as the Contracting Officer directs. If the Contractor fails or refuses to make such repair or replacement, the Contractor shall be liable for the cost, which may be deducted from the contract price.
(End of clause)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://acquisition.gov/far/index.html http://www.acq.osd.mil/dpap/dars/dfars/
(End of provision)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://acquisition.gov/far/index.html http://www.acq.osd.mil/dpap/dars/dfars/
252.225-7043 ANTITERRORISM/FORCE PROTECTION POLICY FOR DEFENSE CONTRACTORS
OUTSIDE THE UNITED STATES (JUN 2015)
(a) Definition. United States, as used in this clause, means, the 50 States, the District of Columbia, and outlying areas.
(b) Except as provided in paragraph (c) of this clause, the Contractor and its subcontractors, if performing or traveling outside the United States under this contract, shall--
(1) Affiliate with the Overseas Security Advisory Council, if the Contractor or subcontractor is a U.S. entity;
(2) Ensure that Contractor and subcontractor personnel who are U.S. nationals and are in-country on a non-transitory basis, register with the U.S. Embassy, and that Contractor and subcontractor personnel who are third country nationals comply with any security related requirements of the Embassy of their nationality;
(3) Provide, to Contractor and subcontractor personnel, antiterrorism/force protection awareness information commensurate with that which the Department of Defense (DoD) provides to its military and civilian personnel and their families, to the extent such information can be made available prior to travel outside the United States; and
(4) Obtain and comply with the most current antiterrorism/force protection guidance for Contractor and subcontractor personnel.
(c) The requirements of this clause do not apply to any subcontractor that is--
(1) A foreign government;
(2) A representative of a foreign government; or
(3) A foreign corporation wholly owned by a foreign government.
(d) Information and guidance pertaining to DoD antiterrorism/force protection can be obtained from HQDA-AT; telephone, DSN 222-9832 or commercial (703) 692-9832.
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
COMBO
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
F3J3C2
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC F87700 Issue By DoDAAC W91QVN Admin DoDAAC W91QVN Inspect By DoDAAC F3J3C2 Ship To Code F3J3C2 Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) ____ Service Acceptor (DoDAAC) ____ Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____
(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
TSgt Michael Stark at michael.stark.5@us.af.mil
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
TSgt Michael Stark at michael.stark.5@us.af.mil
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
5152.229-4012 TAX EXEMPTION, CUSTOMS, REPUBLIC OF KOREA
(a) EXEMPTION: This clause is in implementation of Article IX of the Status of Forces Agreement between the Republic of Korea and the United States of America granting contractors exemption from Republic of Korea customs duties and other such charges. At the time this contract is awarded, the Contractor shall certify to the Contracting Officer that all materials, supplies, and equipment to be imported for the contract have been proposed to the Government exclusive of customs duties and other such charges and; further, that the contract price includes no customs duty whatsoever. It shall indicate to the Contracting Officer the total amount of customs duties excluded from the contract price. The USFK Contracting Officer will verify the amount of customs duty that would otherwise be applicable to the contract and will issue USFK Form(s) 75 to the Contractor. The contractor will submit the original USFK Form 75 to the governing ROK Customs Office at the time of import declaration. The Chief of the Customs Office will review the USFK Form 75 and will exempt the Contractor from customs duties and other such charges. During the review process the customs office will post on the Contractor's Import Permit the anticipated submission date for a completed USFK Form 76, which will be prepared by the Contracting Officer and given to the contractor immediately after contract performance. The Contractor will submit the original USFK Form 76 to the governing ROK Customs Office no later than the date posted on the Import Permit. If the USFK Form 76 is not submitted by the anticipated date, the ROK Customs Office will immediately collect the customs duties and other such charges previously exempted.
(b) If for any reason the Contractor has paid customs duties on materials, supplies, or equipment prior to award of this contract and desires to use such materials, supplies, or equipment for performance of this contract, the Contractor must exclude such duties from the contract price and may obtain refund of such previously paid duties by submitting a completed USFK Form 76 to the governing ROK Customs Office.
(c) Refund: Any Contractor that requires refund of customs duties and other such charges on items used for USFK contracts, can claim refund of such charges by submitting a copy of a completed USFK Form 76 to the governing ROK Customs Office
(d) This entire clause is inapplicable to contracts, or any portions of contracts, funded by the Republic of Korea.
5152.229-4013 TAX EXEMPTION, SPECIAL EXCISE TAX, REPUBLIC OF KOREA
This clause is in implementation of Article XVI of the Status of Forces Agreement between the Republic of Korea and the United States, granting Contractors exemption from Republic of Korea Special Excise Taxes. At the time this contract is awarded the Contractor shall indicate to the Contracting Officer which items will be purchased for the contract that are subject to Special Excise Tax. It shall indicate the name of the item, the number of units to be purchased, the cost per unit without tax, the percentage of tax, the tax amount per unit, the total tax, and the manufacturer of the item. The Contracting Officer will verify the reasonableness of the quantities claimed and ensure that the Contractor has certified that the contract price excludes Special Excise Tax on those items subject to the tax. The contractor shall purchase the special-excise-taxed items from the manufacturer, tax-inclusive. For construction and single-delivery type supply and service contracts, the contractor shall employ the following procedure: At the time it purchases the items it shall present the manufacturer with a notification letter requesting refund of the Special Excise Tax. (Copies of this letter can be obtained from the 411th CSB, Korea Contracting Officer.) The manufacturer will endorse the letter to the manufacturer's District Tax Office which will make refund to the manufacturer. The manufacturer will make subsequent refund to the Contractor. Requests for refund under requirements-type contracts will be submitted monthly and will be accompanied by copies of the USFK delivery orders issue
5152.229-4014 TAX EXEMPTION, VALUE ADDED TAX, REPUBLIC OF KOREA
This clause implements Article XVI of the Status of Forces Agreement between the Republic of Korea and the United States of America, which exempts contractors from paying the Republic of Korea Value-Added Taxes.
When the contractor submits an offer, it shall certify to the Contracting Officer that all the costs in the offer will be exclusive of any Value-Added Tax; and further, that the proposed contract price includes no Value-Added Tax. The contractor shall also indicate the amount and type of Value-Added Taxes excluded from the contract price. If supplies and/or services which the contractor purchases for this contract include Value-Added Taxes, it can obtain a full refund for the amount of the Value-Added Tax by submitting to the ROK District Tax Office tax invoices which the contractor receives when it purchases materials and/or services for this contract. The contractor must submit a copy of the USFK contract with its first tax invoice submission. Subsequent tax invoice submissions must be accompanied by a letter which references the USFK contract submitted with the first tax invoice submission.
5152.229-4015 TAX EXEMPTION, POL PRODUCTS, REPUBLIC OF KOREA
(a) This clause is in implementation of Article XVI of the Status of Forces Agreement between the Republic of Korea and the United States of America, granting Contractors exemption from Republic of Korea taxes for petroleum products (POL) utilized on USFK acquisitions in the Republic of Korea. At the time this contract is awarded, the Contractor shall make a final nomination in writing of its point of purchase for POL products to be used on this contract. If the Contractor intends to purchase directly from an oil company refinery, it may nominate any of the three ROK oil companies below which have agreed to sell to Contractor FOB refinery at the SET-exempt price.
List of Oil Companies and their Respective Tax Offices
(1) Hyundai Oil Refinery Co., Ltd.: Dong-Inchon District Tax Office ATTN: POL Tax Administrator Inchon City, Korea
(2) SK Corporation: Ulsan District Tax Office ATTN: POL Tax Administrator Ulsan City, Kyongsan Nam Do, Korea
(3) LG Caltex Company: Yosu District Tax Office ATTN: POL Tax Administrator Yosu City, Chonla Nam Do, Korea
(b) If the contractor instead intends to purchase its POL products from an individual gasoline station, the Contracting Officer will advise the contractor as to which individual gasoline stations will sell to it at the SET-exempt price. The contractor shall specify from which of those stations it will purchase. In addition to specifying the oil company/gas station, the Contractor shall state the estimated quantity and the amount of POL to be purchased from each refinery/gas station. The USFK Contracting Officer will verify the reasonableness of the amounts of POL products claimed for use on the contract and, based on this verification, the USFK Responsible Officer will issue USFK POL Tax Exemption Coupons. If the Contractor wishes to purchase from an individual gas station, it will be required to make advance payment for the amount of POL covered by the coupons. Advance payment will be at the SET-exempt price and will be made to the gas station(s) previously nominated. Representatives from the nominated gas station(s) shall be present at the issuing session. They will collect the advance payments, mark “paid” on the back of the original copy of the coupons issued, and provide the purchasing Contractor with tax invoices to be used by the Contractor to obtain SET refund from its governing ROK District Tax Office. All coupons for construction contracts will be issued at the time of award. Coupons for requirements-type contracts will be issued on a delivery order increment basis or on a monthly basis. Pre-selected oil company refineries will sell their POL products at the SET-exempted prices upon presentation of the coupons. Individual gas stations, which have previously collected POL payment in advance will accept the pre-paid USFK POL Tax Exemption Coupons from contractors and will provide the POL amounts reflected on tendered coupons without any further charge.
File details come from the government source that posted it.