W91QVN-19-R-0010-0004.doc

DOC document 208 KB Posted

Attached to
GROUND MAINTENANCE SERVICE IN AREA I
Solicitation number
W91QVN19R0010
Issued by

About this file

TO CHANGE CLINS X005 THRU X006 AND ADD NEW CLINS X007 AND X008

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

A0004

a. The purpose of this amendment is to change CLINs X005 thru X006, and add new CLINs X007 and X008 as shown below table:

FROM
TO
DESCRIPTION
Q’TY
UNIT
DESCRIPTION
EST. Q’TY
UNIT
0005, 1005, 2005, 3005, 4005
Accounting for Contract Service
1
Job
Grass cutting for approximately 60.25 acres at Improved Ground Area in Camp Casey Enclave during APRIL thru OCTOBER IAW Para 5.2.3 of the PWS. Requirements CLIN.
5
Job
0006, 1006, 2006, 3006, 4006
War Hazard Losses is Zero (0)
1
Job
Raking leaves for approximately 60.25 acres at Improved Ground Area in Camp Casey Enclave during OCTOBER thru DCEMBER, IAW Para 5.2.3 of the PWS. Requirements CLIN.
5
Job

0007, 1007, 2007, 3007, 4007

Accounting for Contract Service
1
Job

0008, 1008, 2008, 3008, 4008

War Hazard Losses is Zero (0)
1
Job

b. Add paragraph 5.2.3 in the PWS for CLINs X005 and X006 as the following:

“5.2.3. ADDITIONAL GRASS CUTTING AND RAKING LEAVES:

5.2.3.1. Upon receiving separate delivery order, the Contractor shall provide additional grass cutting and leaf raking services for preparation of Very Important Person (VIP) visits, various event, and to keep Garrison’s appearance standard. The Contractor shall provide all necessary labor, materials, tools, equipment, and transportation required for grass cutting and leaf raking services for the improved ground area (High Visibility) as specified in Attachment 1. The Contractor shall perform grass cutting and leaf raking services to the same standard as Para 5.1.1 and Para 5.1.2.”

c. The closing date is extended from 11 Jan 19, 01:00 PM to 16 Jan 19, 01:00 PM.

d. All other terms and conditions of the solicitation remain the same.

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 11-Jan-2019 01:00 PM to 16-Jan-2019 01:00 PM.

SUPPLIES OR SERVICES AND PRICES

CLIN 0005

The IDC type has changed from N/A to Requirements.

The CLIN description has changed from ACCOUNTING FOR CONTRACT SERVICE to ADDITIONAL GRASS CUTTING (REQUIREMENT).

The CLIN extended description has changed from:

The Department of Army requires Contractor Manpower Reporting (CMR) by 31 October of each calendar year during the life of the contract.

To:

Grass cutting for approximately 60.25 acres at Improvied Ground Area in Camp Casey Enclave during APRIL thru OCTOBER IAW Para 5.2.3 of the PWS

The pricing detail quantity has increased by 4.00 from 1.00 to 5.00.

CLIN 0006

The IDC type has changed from N/A to Requirements.

The CLIN description has changed from ESTIMATED WAR HAZARD LOSSES to ADDITIONAL RAKING LEAVES (REQUIREMENT).

The CLIN extended description has changed from:

is zero (0)

To:

Raking leaves for approximately 60.25 acres at Improved Ground Area in Camp Casey Enclave during OCTOBER thru DCEMBER, IAW Para 5.2.3 of the PWS

The pricing detail quantity has increased by 4.00 from 1.00 to 5.00.

CLIN 1005

The IDC type has changed from N/A to Requirements.

The CLIN description has changed from ACCOUNTING FOR CONTRACT SERVICE to ADDITIONAL GRASS CUTTING (REQUIREMENT).

The CLIN extended description has changed from:

The Department of Army requires Contractor Manpower Reporting (CMR) by 31 October of each calendar year during the life of the contract.

To:

Grass cutting for approximately 60.25 acres at Improvied Ground Area in Camp Casey Enclave during APRIL thru OCTOBER IAW Para 5.2.3 of the PWS

The pricing detail quantity has increased by 4.00 from 1.00 to 5.00.

CLIN 1006

The IDC type has changed from N/A to Requirements.

The CLIN description has changed from ESTIMATED WAR HAZARD LOSSES to ADDITIONAL RAKING LEAVES (REQUIREMENT).

The CLIN extended description has changed from:

is zero (0)

To:

Raking leaves for approximately 60.25 acres at Improved Ground Area in Camp Casey Enclave during OCTOBER thru DCEMBER, IAW Para 5.2.3 of the PWS

The pricing detail quantity has increased by 4.00 from 1.00 to 5.00.

CLIN 2005

The IDC type has changed from N/A to Requirements.

The CLIN description has changed from ACCOUNTING FOR CONTRACT SERVICE to ADDITIONAL GRASS CUTTING (REQUIREMENT).

The CLIN extended description has changed from:

The Department of Army requires Contractor Manpower Reporting (CMR) by 31 October of each calendar year during the life of the contract.

To:

Grass cutting for approximately 60.25 acres at Improvied Ground Area in Camp Casey Enclave during APRIL thru OCTOBER IAW Para 5.2.3 of the PWS

The pricing detail quantity has increased by 4.00 from 1.00 to 5.00.

CLIN 2006

The IDC type has changed from N/A to Requirements.

The CLIN description has changed from ESTIMATED WAR HAZARD LOSSES to ADDITIONAL RAKING LEAVES (REQUIREMENT).

The CLIN extended description has changed from:

is zero (0)

To:

Raking leaves for approximately 60.25 acres at Improved Ground Area in Camp Casey Enclave during OCTOBER thru DCEMBER, IAW Para 5.2.3 of the PWS

The pricing detail quantity has increased by 4.00 from 1.00 to 5.00.

CLIN 3005

The IDC type has changed from N/A to Requirements.

The CLIN description has changed from ACCOUNTING FOR CONTRACT SERVICE to ADDITIONAL GRASS CUTTING (REQUIREMENT).

The CLIN extended description has changed from:

The Department of Army requires Contractor Manpower Reporting (CMR) by 31 October of each calendar year during the life of the contract.

To:

Grass cutting for approximately 60.25 acres at Improvied Ground Area in Camp Casey Enclave during APRIL thru OCTOBER IAW Para 5.2.3 of the PWS

The pricing detail quantity has increased by 4.00 from 1.00 to 5.00.

CLIN 3006

The IDC type has changed from N/A to Requirements.

The CLIN description has changed from ESTIMATED WAR HAZARD LOSSES to ADDITIONAL RAKING LEAVES (REQUIREMENT).

The CLIN extended description has changed from:

is zero (0)

To:

Raking leaves for approximately 60.25 acres at Improved Ground Area in Camp Casey Enclave during OCTOBER thru DCEMBER, IAW Para 5.2.3 of the PWS

The pricing detail quantity has increased by 4.00 from 1.00 to 5.00.

CLIN 4005

The IDC type has changed from N/A to Requirements.

The CLIN description has changed from ACCOUNTING FOR CONTRACT SERVICE to ADDITIONAL GRASS CUTTING (REQUIREMENT).

The CLIN extended description has changed from:

The Department of Army requires Contractor Manpower Reporting (CMR) by 31 October of each calendar year during the life of the contract.

To:

Grass cutting for approximately 60.25 acres at Improvied Ground Area in Camp Casey Enclave during APRIL thru OCTOBER IAW Para 5.2.3 of the PWS

The pricing detail quantity has increased by 4.00 from 1.00 to 5.00.

CLIN 4006

The IDC type has changed from N/A to Requirements.

The CLIN description has changed from ESTIMATED WAR HAZARD LOSSES to ADDITIONAL RAKING LEAVES (REQUIREMENT).

The CLIN extended description has changed from:

is zero (0)

To:

Raking leaves for approximately 60.25 acres at Improved Ground Area in Camp Casey Enclave during OCTOBER thru DCEMBER, IAW Para 5.2.3 of the PWS

The pricing detail quantity has increased by 4.00 from 1.00 to 5.00.

CLIN 0007 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job

ACCOUNTING FOR CONTRACT SERVICE

FFP

The Department of Army requires Contractor Manpower Reporting (CMR) by 31 October of each calendar year during the life of the contract

FOB: Destination

NET AMT

CLIN 0008 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job

ESTIMATED WAR HAZARD LOSSES

FFP

is zero (0)

NET AMT

CLIN 1007 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job
OPTION
ACCOUNTING FOR CONTRACT SERVICE

FFP

The Department of Army requires Contractor Manpower Reporting (CMR) by 31 October of each calendar year during the life of the contract

NET AMT

CLIN 1008 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job
OPTION
ESTIMATED WAR HAZARD LOSSES

FFP

NET AMT

CLIN 2007 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job
OPTION
ACCOUNTING FOR CONTRACT SERVICE

FFP

The Department of Army requires Contractor Manpower Reporting (CMR) by 31 October of each calendar year during the life of the contract

NET AMT

CLIN 2008 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job
OPTION
ESTIMATED WAR HAZARD LOSSES

FFP

NET AMT

CLIN 3007 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job
OPTION
ACCOUNTING FOR CONTRACT SERVICE

FFP

The Department of Army requires Contractor Manpower Reporting (CMR) by 31 October of each calendar year during the life of the contract

NET AMT

CLIN 3008 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job
OPTION
ESTIMATED WAR HAZARD LOSSES

FFP

NET AMT

CLIN 4007 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job
OPTION
ACCOUNTING FOR CONTRACT SERVICE

FFP

The Department of Army requires Contractor Manpower Reporting (CMR) by 31 October of each calendar year during the life of the contract

NET AMT

CLIN 4008 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job
OPTION
ESTIMATED WAR HAZARD LOSSES

FFP

NET AMT

The following have been modified:

PERFORMANCE WORK STATEMENT (PWS)

FOR

GROUND MAINTENANCE SERVICES IN CAMP CASEY ENCLAVE

1. GENERAL: This is a non-personal services contract to provide Grounds Maintenance Services for Camp Casey Enclave. The Government shall not exercise any supervision or control over the contract service providers performing the services herein.

1.1. DESCRIPTION OF SERVICES/INTRODUCTION: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform grounds maintenance at Camp Casey Enclave as defined in this Performance Work Statement (PWS), specified in Part 5 which is Specific Tasks, except for those items specified as government furnished property and services. The Contractor shall perform to the standards of this PWS. During the life of the contract, areas may be increased/decreased with issuing modification due to Relocation Plan of the Camp Casey Enclave.

1.2. BACKGROUND: Area of work, identifying the service areas, is shown on location maps as described in the Attachment 1.

1.3. OBJECTIVES: The Contractor shall ensure all work accomplished maintains and presents a healthy, uniform, clean, neat, and professional appearance to all grounds included and covered by this contract in support of mission requirements for users, residents, and visitors to the installation.

1.4. PERIOD OF PERFORMANCE: The period of performance shall be for one (1) Base Year of 12 months and four (4) 12 months option years. The period of performance reads as follows:

Base Year

1 April 2019 – 31 March 2020

Option Year I

1 April 2020 – 31 March 2021

Option Year II

1 April 2021 – 31 March 2022

Option Year III

1 April 2022 – 31 March 2023

Option Year IV

1 April 2023 – 31 March 2024

1.5. GENERAL INFORMATION:

1.5.1. Hours of Operation: The Contractor shall responsible for conducting business between the hours of 0730 to 1630 or during daylight hours , Monday through Friday except Korean Legal Holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.

1.5.2. Place of Performance: The work to be performed under this contract will be performed at Camp Casey, Hovey, Mobile and North-Castle.

1.5.3. Scheduling: The Contractor must submit a monthly schedule to the COR for approval at least seven (7) calendar days before starting of following month. The schedule shall provide areas, number of workers, and equipment, and a time frame of the ground maintenance. No changes to the schedule shall be made without prior approval by COR.

1.5.4. Quality Control Plan (QCP): The Contractor shall develop and maintain an effective quality control plan to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s QCP is the means by which the Contractor assures that the work complies with the requirement of the contract. An electronic copy of a comprehensive written QCP shall be submitted to the COR within ten (10) Calendar days after award contract. At minimum, the QCP shall include the following:

1.5.4.1. The Contractor’s QCP shall contain, as a minimum, the following items:

1.5.4.1.1. A description of the inspection system to cover all services. Description shall include specifies as to the areas to be inspected on a scheduled and unscheduled basis, frequency of inspections, and the title and organizational placement of the inspector(s).

1.5.4.1.2. A description of the methods to be used for identifying and preventing defects in the quality of service performed.

1.5.4.1.3. A description of how the records will be kept. Records must document all inspections and corrective or preventive actions taken.

1.5.4.2. Records of inspections shall be kept and made available to the Government throughout the contract performance period and for the period after contract completion until final settlement of any claims under this contract.

1.5.5. TYPE OF CONTRACT: The Government will award a Hybrid Contract with Firm Fixed Price CLINs and

Requirement CLINs.

1.5.6. CONTRACTING OFFICER’S REPRESENTATIVE (COR): Use of the COR Management System Tool (CORT Tool which is located inside Wide Area Work Flow https://wawf.eb.mil) for nomination, tracking, documentation, and management of CORs. The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: Assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor's performance and notifies both the KO and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.5.7. SPECIAL QUALIFICATIONS: The Contractor shall maintain all required ROK licenses and qualifications for ground maintenance service within the PWS of this contract. The Contractor shall maintain all required licenses throughout the contract period to perform the work specified hereinafter.

1.5.7.1. Prime Contractor’s Registration: The Prime Contractor shall possess the Special Construction Registration for i) Landscaping and Planting (전문건설업 중 조경식재공사업) or ii) Comprehensive Landscaping Construction Registration (종합건설업중 조경공사업)” issued by the Republic of Korea (ROK) Government.

1.5.7.2. Prime Contractor’s Prior Experience: The Prime Contractor shall have at least three (3) years of past experience in performing same amount of size or larger ground maintenance services within the last five (5) years from the solicitation closing date.

1.5.8. KEY PERSONNEL:

1.5.8.1. CONTRACT MANAGER (CM):

1.5.8.1.1. CM’s Qualification: The CM shall possess “Engineer Landscape Architecture (조경기사)” license.

1.5.8.1.2. The CM shall have at least three (3) years of experience as a CM on the same or similar projects related to this requirement (similar in size and complexity of the work) within the last five (5) years from the solicitation closing date.

1.5.8.1.3. The Contractor shall provide a CM who shall be responsible for the performance of the work. The name of this person and an alternate, who shall act for the Contractor when the manager is absent, shall be designated in writing to the contracting officer. The CM or alternate CM shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The CM shall be available between 0730-1630hrs, Monday through Friday except Korean holidays or when the Government facility is closed for administrative reasons.

1.5.8.1.4. The CM shall be able to read, write, speak, and understand English at a level that will enable them to perform all assigned duties.

1.5.8.1.5. The CM shall fully understand the requirements of this contract and shall report to the COR any problems encountered in any of the facilities covered by this contract. The CM shall demonstrate adequate knowledge of equipment, tools and techniques, and shall be able to recognize situation or circumstance under defined in this PWS that may be hazardous to the facilities or to personnel. Immediately upon recognition of such situation and/or circumstances, the CM shall notify the KO and/or the COR.

1.5.9. IDENTIFICATION OF CONTRACTOR EMPLOYEES: The Contractor’s personnel shall present a neat appearance and be easily recognized as a Contractor. All Contractor personnel shall be identifiable by wearing a clearly visible, readable identification badge and vest with reflective material made of durable material, consisting of the Contractor’s company name, employee’s name in English. These badges shall be consecutively numbered and made accountable by the Contractor. The Contractor shall provide a list of badge numbers and personnel to the Contracting Officer’s Representative no later than ten (10) Calendar days after contract award and shall be updated as changes occur.

1.5.10. CONTRACTOR PERSONNEL CONDUCT: The Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure that personnel present a professional appearance. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor is responsible for ensuring that any Contractor employees providing services under this contract conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove from the job site any employee for reasons of misconduct or security. In accordance with DOD Directive 5500.7-R, “Joint Ethics Regulation”, Contractor employees must avoid being improperly influenced in the execution of their duties under the contract. Particular attention should be paid to acceptance of gifts/ gratuities, and on non- disclosure of sensitive or classified information. The Contractor shall ensure employee conduct complies with 41

U.S. C 423 relative to release of acquisition related information or actions or discussions which may prejudice future competitions. The Contractor shall ensure no Contractor employees conduct political related activities or events on the installation.

1.5.11. BASE PASS:

1.5.11.1. A list of personnel and equipment shall be submitted to the COR for Base Pass and Vehicle Permit processing within ten (10) Calendar days of contract award. All Contractor employees and representatives shall have in their possession a Korean Citizen Identification Card during performance under this contract.

1.5.11.2. The Contractor shall ensure that employees have a current and valid driver’s license before allowing the employee to operate a Contractor-owned vehicle on the base. The Contractor and its employees shall comply with all security requirements imposed by the local installation commander at all times while on the military installation. Any Contractor traffic violations may result in the denial of driving privileges on the installations.

A copy of all licenses shall be provided to the COR ten (10) Calendar days of contract award.

1.5.11.3. All Contractor employees shall abide by all Government installation regulations during performance under this contract.

1.5.11.4. The CM will be authorized escort privileges for people working under this contract and only during hours stated under this contract. If the additional employee require escort privilege to perform contract requirement, the Contractor shall submit the written document with to a COR for approval.

1.5.12. SAFETY:

1.5.12.1. Safety Requirements: The Contractor shall insure that safety precautions are taken during the performance of this contract to protect the lives of Contractor personnel, the property of the U.S. Government, the Republic of Korea, as well as the private individuals and firms who may be exposed to or endangered by the Contractor’s actions to maintain minimal accidents/incident, zero loss of life and minimal damage to property. The Contractor shall submit safety plan to the COR within ten (10) Calendar days after award of this contract. The safety plan shall clearly describe the Contractor’s Safety training, safety method, and practices such as standardized procedures to monitor performance, identify discrepancies, and take corrective action to prevent re-occurrence of any safety issue. The safety plan shall be confirmed and accepted by COR within five (5) Working days if there is any changes after COR review. The safety plan shall comply with EM 385-1-1, the US Army Corps of Engineers Safety and Health Requirements Manual and the Korean Occupational Safety and Health Act (KOSHA). The Contractor shall take measures to protect pedestrians from flying debris during grass cutting, edging, trimming, and sweeping (blowers) operations. The Contractor shall exercise safety and health precautions as necessary to prevent safety hazards to personnel, materials, and equipment. Unsafe practices and/or conditions will be immediately called to the attention of the Contract Manager for remedial or corrective action. Conditions beyond the Contractor’s responsibility will be referred to the COR for corrective action. Contractor’s employees shall be thoroughly indoctrinated on safe operating procedures and precautions essential to the accomplishment of their tasks. Safety measures shall be implemented and adhered to by the Contractor.

1.5.12.2. Accident Investigations, Reports, and Logs: The safety plan shall include a copy of the Contractor’s accident investigation reporting format, and logs. Report all accidents as soon as possible but not more than 30 minutes of accident occurrence to the Contracting Officer/Representative (KO/COR). The Contractor shall thoroughly investigate the accident and submit the findings of the investigation along with appropriate corrective actions to the KO/COR in the accident investigation reporting format as soon as possible but no later than five (5) working days following the accident. Implement corrective actions as soon as reasonably possible. The accident investigation reporting format shall include at a minimum.

(1) Contract Number and Contract Name/Description

(2) Name of Contractor

(3) Date/Time of Accident

(4) Date report was completed

(5) Detail description of events that lead to the accident

(6) Root cause of accident

(7) Corrective action(s) to prevent recurrence

1.5.12.3. The following require immediate accident notification and written accident report:

(1) A fatality

(2) A permanent total or permanent partial disability

(3) The hospitalization of three or more people resulting from a single occurrence

(4) Property damage of $200.00 or more

1.5.12.4. The Contractor shall immediately correct all safety deficiencies upon notification of the deficiencies by the COR/Alternate Contracting Officer’s Representative (ACOR)/ Quality Assurance Representative (QAR), and shall notify the COR of the corrective action to be taken.

1.5.13. ANTITERRORISM AND OPERATIONS SECURITY (OPSEC):

1.5.13.1. AT Level I Training: All Contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training within fourteen (14) calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR within fourteen (14) calendar days after completion of training by all employees and subcontractor personnel. AT level 1 awareness, training is available at the following website: https://atlevel1.dtic.mil/at.

1.5.13.2. Access and General Protection/Security Policy and Procedures: Contractor’s and all associated sub-Contractors’ employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshall Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.

1.5.13.3. iWATCH Training: This standard language is for Contractor employees with an area of performance within an Army controlled installation, facility or area. The Contractor and all associated sub-Contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within thirty (30) calendar days of contract award and within thirty (30) calendar days of new employees commencing performance with the results reported to the COR NLT thirty (30) calendar days after completing the training.

1.5.13.4. For Contracts that Require OPSEC Training: Per AR 530-1, Operations Security, new Contractor employees must complete Level I OPSEC training within 30 calendar days of contract award. All Contractor employees must complete annual OPSEC awareness training.

PART 2

DEFINITIONS, ACRONYMS, AND ABBREVIATIONS

2. DEFINITIONS AND ACRONYSM:

2.1 DEFINITIONS:

2.1.1. Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.2. Contractor Acquired Property: Property acquired, fabricated, or otherwise provided by the Contractor for performing a contract and to which the Government has title.

2.1.3. Contract Manager (CM): A person with authority make on-site decisions on behalf of the Contractor on contract matters.

2.1.4. Contracting Officer (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.5. Contracting Officer’s Representative (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.6. Debris: Includes, but is not limited to paper, cans, bottles, limbs and branches, pine straw and pine cones, leaves, rocks, and other similar items.

2.1.7. Defective Service. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.8. Deliverable. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.9. Equipment. A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale, and does not ordinarily lose its identity or become a component part of another article when put into use. Equipment does not include material, real property, special test equipment or special tooling.

2.1.10. Government Furnished Property. Property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government- furnished property also includes Contractor-acquired property if the Contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.

2.1.11. Government Property. All property owned or leased by the Government. Government property includes both Government-furnished property and Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.

2.1.12. Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.13. Loss of Government Property. Unintended, unforeseen or accidental loss, damage, or destruction of Government property that reduces the Government’s expected economic benefits of the property. Loss of Government property does not include occurrences such as purposeful destructive testing, obsolescence, normal wear and tear, or manufacturing defects. Loss of Government property includes, but is not limited to:

(1) Items that cannot be found after a reasonable search;

(2) Theft

(3) Damage resulting in unexpected harm to property requiring repair to restore the item to usable condition; or

(4) Destruction resulting from incidents that render the item useless for its intended purpose or beyond economical repair.

2.1.14. Material. Property that may be consumed or expended during the performance of a contract, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end-item. Material does not include equipment, special tooling, and special test equipment or real property.

2.1.15. Physical Security. Actions that prevent the loss or damage of Government property.

2.1.16. Property. All tangible property, both real and personal.

2.1.17. Property Administrator. An authorized representative of the KO appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a Contractor.

2.1.18. Property Records. Records created and maintained by the Contractor in support of its stewardship responsibilities for the management of Government property.

2.1.19. Provide. To furnish, as in Government-furnished property, or to acquire, as in Contractor-acquired property.

2.1.20. Pruning: Pruning is selectively removing unwanted growth to make a plant or tree grow or respond in a desired manner.

2.1.21. Quality Assurance. The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.22. Quality Assurance Surveillance Plan. An organized document written by the government specifying the surveillance methodology used for surveillance of Contractor performance.

2.1.23. Quality Control. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.24. Real Property. See Federal Management Regulation 102-71.20 (41 CFR 102-71.20).

2.1.25. Sensitive Property means property potentially dangerous to the public safety or security if stolen, lost, or misplaced, or that shall be subject to exceptional physical security, protection, control, and accountability. Examples include weapons, ammunition, explosives, controlled substances, radioactive materials, hazardous materials or wastes, or precious metals.

2.1.26. Trimming: Cutting of grass and other vegetation around grounds obstacles that prevent mowing.

2.1.27. Unit Acquisition Cost means:

(1) For Government-furnished property, the dollar value assigned by the Government and identified in the contract; and

(2) For Contractor-acquired property, the cost derived from the Contractor’s records that reflect consistently applied generally accepted accounting principles.

2.1.28. Wide Area Work Flow (WAWF): A secure web based system for electronic invoicing, receipt, and acceptance. WAWF allows government vendors to submit and track invoices and receipt/acceptance documents over the web and allows government personnel to process those invoices in a real-time, paperless environment.

2.1.29. Work Day. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.30. Work Week. Monday through Friday, unless specified otherwise.

2.1.31. Vegetation: 6 inches or over height of grass and bush and tree shoots.

2.2. ACRONYMS:

ACOR

Alternate Contracting Officer's Representative

AFARS

Army Federal Acquisition Regulation Supplement

AR

Army Regulation

CAP

Contractor Acquired Property

CFR

Code of Federal Regulations

CM

Contract Manager

COR

Contracting Officer Representative

DA

Department of the Army

DFARS Defense Federal Acquisition Regulation Supplement

DOD

Department of Defense

FAR

Federal Acquisition Regulation

GFP

Government-Furnished Property

KO

Contracting Officer

OCI

Organizational Conflict of Interest ODC Other Direct Costs

PA

Property Administrator PIPO Phase In/Phase Out POC Point of Contact

PRS

Performance Requirements Summary PWS Performance Work Statement

QA

Quality Assurance

QASP

Quality Assurance Surveillance Plan

QC

Quality Control

QCP

Quality Control Plan TE Technical Exhibit WAWF Wide Area Work Flow

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES

3.1. GENERAL: The Government may provide office and storage spaces to be used for keeping contractor’s equipment and utilities such as water, electricity, and heat without charge.

3.2. The Government does not, by providing such office and storage space and such utilities, assume any liability for damage to or loss of Contractor’s property or for injury or death of any person resulting from fire, theft or any other cause. Contractor shall indemnify the Government from any and all such potential liability.

3.3. If the Government facility is not available for this contract, the Contractor shall coordinate with the COR the erection of any temporary facility (s) before, during and after the performance of the contract. The Contractor shall obtain an approved U.S Government Real Estate Permit from Camp Casey Real Property Engineers. The Contractor shall also obtain an approved EANC Form 69, (Construction Permit), before erecting any temporary facility(s). The Contractor shall obtain all of the necessary Real Estate Permits required by the Government prior to the release of the site-area to the Contractor. The COR may assist the Contractor with any required information concerning the process of obtaining the Real Estate Permits. The temporary facility(s) shall be a metal connex type trailer. Trailer(s) must have the necessary utility hook-ups. The Government is not responsible for any erection of facilities or expenses of any required utility hook-ups. The Contractor shall be responsible for all expenses.

3.4. All reasonable quantities of water and electricity shall be furnished at no charge to the Contractor for work performed on USFK installations. Coordination shall be made with the COR for locations of water and electrical supply points. Temporary connections shall be made and removed at the Contractor’s own expense, regardless of distance or accessibility of existing service. Experienced craftsmen shall make all connections and they shall be coordinated with COR. The Contractor shall pay for costs for repair of utility systems damaged by the Contractor

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1. GENERAL: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2. The Contractor shall furnish a sufficient number of vehicles suitable for the transportation of personnel, materials, and equipment for use in the performance of this contract. The contractor’s motor vehicles shall be operated and maintained in accordance with applicable local vehicle standards, USFK Regulation 190-1, Army installation regulations, and shall be maintained in a serviceable condition. The Contractor shall display its company name, and telephone number on all vehicles to be used in the performance of grounds maintenance activities.

4.3. The Contractor shall furnish all the equipment and its related items, such as fuel oil and gasoline for use in Vehicles and equipment necessary to perform grounds maintenance services.

4.4. Equipment for execution of this contract is the responsibility of the contractor. All equipment used under this contract will be inspected by the COR/QAE prior to its use. If the equipment is at any time deemed unsafe or unserviceable by the COR/QAE, the Contractor shall remove equipment from the post within 24 hours or have it repaired to provide a safe and continuing operation. The Contractor is responsible for ensuring that the equipment shall be of the appropriate type for the work to be accomplished, that it is in a safe operating condition, hat it is used In a safe manner, and that it is used in a safe environment and condition. The Contractor shall submit a list of equipment as a part of technical proposal.

4.5. The Contractor shall comply with the provisions of the Army Regulation 420-1, Chapter 25, Section VIII, located on the Web Page, http://www.apd.army.mil/. The Contractor shall provide suitable fire extinguishers at any material storage area and/or office area used or constructed by the Contractor.

4.6. ENVIRONMENTAL COMPLIANCE: The Contractor shall comply with all federal, state, local and installation environmental laws, rules and plans. The Contractor shall use and store all materials, chemicals, and equipment used in the performance of services on the installation in accordance with industry standards, local, federal and state laws, and according to manufactures' recommendations. The Contractor will submit Material Safety Data Sheets (MSDS) for COR approval on all materials 15 days prior to use. The Contractor shall make all environmental and hazardous material records available at the beginning of the next duty day after the Government’s request to view the records.

PART 5

SPECIFIC TASKS

5. SPECIFIC TASKS

5.1. FIRM FIXED PRICED PORTION OF WORK: The Contractor shall provide the following firm fixed priced ground maintenance services in accordance with the following provisions and technical specifications.

5.1.1. GRASS CUTTING:

5.1.1.1. The Contractor shall provide all necessary labor, materials, tools equipment and transportation required for grass cutting services.

5.1.1.2. The Contractor shall mow the grass at the designated areas as specified in Attachment #1.

5.1.1.3. The Contractor shall mow grass only when the minimum height of six (6) inches is reached or exceeded for High Visibility (Improved Grounds) and Common Areas (Semi-Improved Grounds) during greenery season (April thru October). The contractor shall set the mower height to three (3) inches for all areas.

5.1.1.4. Before operating weed eaters, power mowers, or riding mowers, the Contractor shall clear the area of any wire, bottles, cans, rocks, stones, loose trash or any other debris which may cause damage to real property, vehicles and injury to personnel. The Contractor shall dispose of these items off base at the Contractor’s expense.

5.1.1.5. The Contractor shall ensure the cut grass presents an even and uniform appearance.

5.1.1.6. Concurrent with each mowing cycle, the Contractor shall trim and edge the grass along building, structures, curbs, sidewalks, walks, ditch-lines, tree plant beds, hedges, fences, shrubs, wear outlets, signs, valve boxes, driveways, and roadways. The Contractor shall trim the grass so that its height does not exceed height of the adjacent mowed grass.

5.1.1.7. The Contractor shall trim grass around trees, shrubs, flower beds, facilities, fence lines, ditch-lines, and any ground protrusions concurrently with mowing. The Contractor shall trim carefully to ensure trees, shrubs, flowers, facilities, and protrusions are not damaged, and shall ensure that the height of the trimmed grass does not exceed height of the adjacent mowed grass.

5.1.1.8. The Contractor shall edge all sidewalks and curbs concurrently with mowing, to ensure there is a clean ½ (Half) inch to 1 (one)-inch break line between the grass and concrete, with no overlapping of grass. The Contractor shall remove all weeds from cracks in sidewalks, pads, ditch-lines, pavement, and curbs joints.

5.1.1.9. Any areas damaged by the Contractor shall be repaired by the Contractor at no additional cost to the Government, to the satisfaction of the Contracting Officer or COR.

5.1.1.10. The Contractor shall remove grass cuttings from cracks and expansion joints in sidewalks, curbs, pavements, ditch-lines, and gutters at the end of each workday and after each grass cutting cycle. At the end of each day of grass cutting services, the Contractor shall remove all grass cuttings from the installation.

5.1.1.11. When cutting grass around the fuel tank areas identified, the Contractor shall not use grass cutting equipment powered by electrical motors or internal combustion engines. The Contractor shall trim the grass so that its height does not exceed height of the adjacent mowed grass.

5.1.1.12. The Contractor shall ensure all streets, parking lots, sidewalks, pads, and curbs are free of yard debris immediately after grass cutting. The Contractor shall remove all grass cuttings or other yard debris discharged on streets, parking lots, sidewalks, pads, and curbs generated by grass mowing activities.

5.1.2. RAKING LEAVES.

5.1.2.1. The Contractor shall provide all necessary labor, materials, tools, equipment, and transportation required for raking leaves and debris from the Improved ground area (High Visibility) and Semi-improved ground area (Common area) as specified in Attachment #1.

5.1.2.2. The Contractor shall rake and collect all the fallen leaves and debris by performing two (2) times per year for improved ground area, and one (1) time per year for semi-improved area, and remove the collective materials from the installation at the end of each workday. Debris is defined as paper products, cans, bottles, cigarette butts, wood scraps, fallen branches, plastic products, cloth products, food stuffs and other articles discarded and considered trash.

5.2. REQUIREMENTS PORTION OF WORK: Upon receipt of written Task Order from the Contracting Officer, the Contractor shall provide services in accordance with the following provisions and technical specifications

5.2.1. CLEARING PERIMETER FENCE.

5.2.1.1. Upon receiving separate delivery order, the Contractor shall provide all necessary labor, materials, tools, equipment, and transportation for clearing security clear zone along the perimeter fence lines specified in

Attachment #1.

5.2.1.2. The Contractor shall remove arrow root vines from the fence, and cut and trim all the trees and bushes on 2 meters in and outside of the perimeter fence alongside 2ID installation boundaries for Camp Casey Enclave.

5.2.1.3. Branches of trees extending over the clear zones shall be pruned to provide a clear height of three (3) meters above ground level.

5.2.1.4. All cut and trimmed trees & bushes, and arrow root vines shall be removed from the 2ID installation.

5.2.2. CLEANING CASEY CREEK.

5.2.2.1. Upon receiving separate delivery order, the Contractor shall provide all necessary labor, materials, tools, equipment, and transportation for cleaning of designated areas in Casey creek. The Casey creek area within U.S.

Government property is specified in Attachment #1.

5.2.2.2. The Contractor shall cut and remove bushes and trees including all plant growth at an average twenty (20) meter width of stream beds and both sides of the stream banks, and remove accumulated dirt, debris, rubbish, weeds, brush and other materials which may retard flow of the Casey creek in Camp Casey and Hovey.

5.2.2.3. All cut bushes and trees, and taken out debris shall be removed from the 2ID installation.

5.2.3. ADDITIONAL GRASS CUTTING AND RAKING LEAVES:

5.2.3.1. Upon receiving separate delivery order, the Contractor shall provide additional grass cutting and leaf raking services for preparation of Very Important Person (VIP) visits, various event, and to keep Garrison’s appearance standard. The Contractor shall provide all necessary labor, materials, tools, equipment, and transportation required for grass cutting and leaf raking services for the improved ground area (High Visibility) as specified in Attachment 1. The Contractor shall perform grass cutting and leaf raking services to the same standard as Para 5.1.1 and Para 5.1.2.

5.3. CONTRACTOR MANPOWER REPORTING (CMR):

5.3.1. The Contractor shall report ALL Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the ground maintenance service in Casey Enclave.

The Contractor shall completely fill in all required data fields using the following web address:

http://www.ecmra.mil/, and then click on "Department of the Army CMRA" or the icon of the DoD organization that is receiving or benefitting from the contracted services.

5.3.2. Reporting inputs shall be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2019. Contractors may direct questions to the help desk by clicking on "Send an email" which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component's CMR website".

PART 6

APPLICABLE PUBLICATIONS

6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)

6.1. The Contractor shall abide by all applicable regulations, publications, manuals, and local policies and procedures. Any such changes to documents which cause a change in performance within the meaning of the “Changes” clause will be not implemented by the Contractor unless or until a change order or modification to the contract is issued by the KO. Any Contractor provided publications are to be procured and maintained at Contractor’s expense

PUBLICATION
DESCRIPTION
TM 5-630
Land Management
TB 420-22
Roads, Grounds, Pest Control Refuse Collection-Hand Book
AR 190-5
Motor Vehicles Traffic Supervision
AR 200-1
Environmental Protection and Enhancement
AR 385-10
Army Safety Program
EM 385-1-1
Safety and Health Requirements Manual

PART 7

ATTACHMENT/TECHNICAL EXHIBIT LIST

7. ATTACHMENT/TECHNICAL EXHIBIT LIST

7.1. ATTACHMENT 1: Location Maps for Ground Maintenance

ATTACHMENT 1-1: Grass Cutting & Leaf Raking for Camp Casey

ATTACHMENT 1-2: Grass Cutting & Leaf Raking for other area

ATTACHMENT 1-3: Clearing Fence and Cleaning Creek for Camp Casey

ATTACHMENT 1-4: Clearing Fence and Cleaning Creek for other area

7.2. ATTACHMENT 2: Performance Requirement Summary (PRS):

7.3. ATTACJ,EMT 3: Deliverables Schedule

(End of Summary of Changes)

File details come from the government source that posted it.