SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

a. The purpose of this amendment is to accomplish the following:

(1) Change quantity of CLINs 0001AA, 1001AA, 2001AA, 3001AA, and 4001AA as shown below table.

(2) Add new CLIN 0001AC, 1001AC, 2001AC, 3001AC, 4001AC as shown below table.

CLINS
DESCRIPTION
FROM
TO
Q’ty/Unit
Q’ty/Unit
0001AA, 1001AA, 2001AA, 3001AA, 4001AA
Grass Cutting for Improved Area
2,081.24 Acres
421.75/ Acres
0001AC, 1001AC, 2001AC, 3001AC, 4001AC
Grass Cutting for Semi-Improved Area
Zero(0)/ Acres
1,659.49/ Acres

(3) Change the paragraph 5.1.1.3. as shown below table.

Paragraph 5.1.1.3 of PWS

FROM
Grass shall be cut to the height not lower than 1.5 inches, and maintained at no higher than 3 inches at Improved ground area, and no higher than 6 inches at non-improved ground area
TO
The Contractor shall set the mower height to three (3) inches for all areas, and maintained no higher than six (6) inches at Improved ground area (High Visibility) and Semi-improved ground area (Common area), and no higher than seven (7) inches at Fire Breaks and Ranges, and Unimproved ground area

b. The closing date of the solicitation is extended from 13:00 hours on 28 Dec 2018 to 13:00 hours on 4 January 2019.

c. The Attachment #1-1 and Attachment #1-2 are revised. (See attachments)

d. All other terms and conditions of the solicitation remain the same.

SUMMARY OF CHANGES

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 28-Dec-2018 01:00 PM to 04-Jan-2019 01:00 PM.

SUPPLIES OR SERVICES AND PRICES

SUBCLIN 0001AA

The pricing detail quantity has decreased by 1,659.49 from 2,081.24 to 421.75.

SUBCLIN 1001AA

The pricing detail quantity has decreased by 1,659.49 from 2,081.24 to 421.75.

SUBCLIN 2001AA

The pricing detail quantity has decreased by 1,659.49 from 2,081.24 to 421.75.

SUBCLIN 3001AA

The pricing detail quantity has decreased by 1,659.49 from 2,081.24 to 421.75.

SUBCLIN 4001AA

The pricing detail quantity has decreased by 1,659.49 from 2,081.24 to 421.75.

SUBCLIN 0001AC is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

0001AC

1,659.49
Acre

SEMI-IMPROVED AREA (FIRM-FIXED PRICE)

FFP

Approximately 237.07 Acres in Cp Casey Enclave during APRIL THRU OCTOBER.

FOB: Destination

NET AMT

SUBCLIN 1001AC is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

1001AC

1,659.49
Acre
OPTION
SEMI-IMPROVED AREA (FIRM-FIXED PRICE)

FFP

NET AMT

SUBCLIN 2001AC is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

2001AC

1,659.49
Acre
OPTION
SEMI-IMPROVED AREA (FIRM-FIXED PRICE)

FFP

NET AMT

SUBCLIN 3001AC is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

3001AC

1,659.49
Acre
OPTION
SEMI-IMPROVED AREA (FIRM-FIXED PRICE)

FFP

NET AMT

SUBCLIN 4001AC is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

4001AC

1,659.49
Acre
OPTION
SEMI-IMPROVED AREA (FIRM-FIXED PRICE)

FFP

NET AMT

The following have been modified:

PERFORMANCE WORK STATEMENT (PWS)

FOR

GROUND MAINTENANCE SERVICES IN CAMP CASEY ENCLAVE

1. GENERAL: This is a non-personal services contract to provide Grounds Maintenance Services for Camp Casey Enclave. The Government shall not exercise any supervision or control over the contract service providers performing the services herein.

1.1 DESCRIPTION OF SERVICES/INTRODUCTION: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform grounds maintenance at Camp Casey Enclave as defined in this Performance Work Statement (PWS), specified in Part 5 which is Specific Tasks, except for those items specified as government furnished property and services. The Contractor shall perform to the standards of this PWS. During the life of the contract, areas may be increased/decreased with issuing modification due to Relocation Plan of the Camp Casey Enclave.

1.2. BACKGROUND: Area of work, identifying the service areas, is shown on location maps as described in the Attachment 1.

1.3. OBJECTIVES: The Contractor shall ensure all work accomplished maintains and presents a healthy, uniform, clean, neat, and professional appearance to all grounds included and covered by this contract in support of mission requirements for users, residents, and visitors to the installation.

1.4. PERIOD OF PERFORMANCE: The period of performance shall be for one (1) Base Year of 12 months and four (4) 12 months option years. The period of performance reads as follows:

Base Year

1 April 2019 – 31 March 2020

Option Year I

1 April 2020 – 31 March 2021

Option Year II

1 April 2021 – 31 March 2022

Option Year III

1 April 2022 – 31 March 2023

Option Year IV

1 April 2023 – 31 March 2024

1.5. GENERAL INFORMATION:

1.5.1. Hours of Operation: The Contractor shall work between the hours of 0730 to 1630 or during daylight hours, Monday through Friday except Korean Legal Holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.

1.5.2. Place of Performance: The work will be performed at Camp Casey, Hovey, Mobile and North-Castle.

1.5.3. Work Schedule: The Contractor shall submit a monthly schedule to the COR for approval at least seven (7) calendar days before starting work of following month. The schedule shall provide areas to be work on, number of workers, equipment, and a time frame of the ground maintenance. No changes to the schedule shall be made without prior approval of theCOR.

1.5.4. Quality Control Plan (QCP): The Contractor shall develop and maintain an effective quality control plan to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s QCP is the means by which the Contractor assures that the work complies with the requirement of the contract. An electronic copy of a comprehensive written QCP shall be submitted to the COR within ten (10) Calendar days after contract award.

1.5.4.1. The Contractor’s QCP shall contain, as a minimum, the following items:

1.5.4.1.1. A description of the inspection system to cover all services. Description shall specifies the areas to be inspected on a scheduled and unscheduled basis, frequency of inspections, the title and organizational placement of the inspector(s).

1.5.4.1.2. A description of the methods to be used for identifying and preventing defects in the quality of service performed.

1.5.4.1.3. A description of how the records will be kept. Records must document all inspections and corrective or preventive actions taken.

1.5.4.2. Records of inspections shall be kept and made available to the Government throughout the contract performance period and after contract completion until final settlement of any claims under this contract.

1.5.5. TYPE OF CONTRACT: The Government will award a Requirements with Firm Fixed Price CLINs.

1.5.6. CONTRACTING OFFICER’S REPRESENTATIVE (COR): The COR monitors all technical aspects of the contract and assists in contract administration. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.5.7. SPECIAL QUALIFICATIONS: The Contractor shall maintain all required ROK licenses and qualifications for ground maintenance service within the PWS of this contract. The Contractor shall maintain all required licenses throughout the contract period to perform the work specified hereinafter.

1.5.7.1. Prime Contractor’s Registration: The Prime Contractor shall possess the Special Construction Registration for i) Landscaping and Planting (전문건설업 중 조경식재공사업) or ii) Comprehensive Landscaping Construction Registration (종합건설업중 조경공사업)” issued by the ROK Government.

1.5.7.2. Prime Contractor’s Prior Experience: The Prime Contractor shall have at least three (3) years of prior experience in ground maintenance services.

1.5.8. CONTRACT MANAGER (CM): The Contractor shall provide a CM who shall be responsible for the performance of the work. The CM shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The CM shall stay at jobsite for full eight (8) hours, between 0730-1630hrs, Monday through Friday through the life of the contract except Korean holidays or when the Government facility is closed for administrative reasons. The CM shall be a prime contractor’s employee who evaluated in accordance with FAR 52.212-2 for the life of contract.

1.5.8.1.The CM shall have at least three (3) years of experience as a CM in Ground Maintenance service and the CM shall possess current and valid license in Engineer Landscape Architecture (조경기사).

1.5.8.2. The CM shall be able to read, write, speak, and understand English at a level that will enable them to perform all assigned duties.

1.5.8.3. The CM shall fully understand the requirements of this contract and shall report to the COR any problems encountered in any of the facilities covered by this contract. The CM shall demonstrate adequate knowledge of equipment, tools and techniques, and shall be able to recognize situation or circumstance under defined in this PWS that may be hazardous to the facilities or to personnel. Immediately upon recognition of such situation and/or circumstances, the CM shall notify the KO and/or the COR.

1.5.9. IDENTIFICATION OF CONTRACTOR EMPLOYEES: The Contractor’s personnel shall present a neat appearance and be easily recognized as a Contractor. All Contractor personnel shall be identifiable by wearing a clearly visible, readable identification badge and vest with reflective material made of durable material, consisting of the Contractor’s company name, employee’s name in English. These badges shall be consecutively numbered and made accountable by the Contractor. The Contractor shall provide a list of badge numbers and personnel to the Contracting Officer’s Representative no later than ten (10) Calendar days after contract award and shall be updated as changes occur.

1.5.10. CONTRACTOR PERSONNEL CONDUCT: The Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure that personnel present a professional appearance. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor is responsible for ensuring that any Contractor employees providing services under this contract conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove from the job site any employee for reasons of misconduct or security. In accordance with DOD Directive 5500.7-R, “Joint Ethics Regulation”, Contractor employees must avoid being improperly influenced in the execution of their duties under the contract. Particular attention should be paid to acceptance of gifts/ gratuities, and on non- disclosure of sensitive or classified information. The Contractor shall ensure employee conduct complies with 41

U.S. C 423 relative to release of acquisition related information or actions or discussions which may prejudice future competitions. The Contractor shall ensure no Contractor employees conduct political related activities or events on the installation.

1.5.11. BASE PASS:

1.5.11.1. A list of personnel and equipment shall be submitted to the COR for Base Pass and Vehicle Permit processing within ten (10) Calendar days of contract award. All Contractor employees and representatives shall have in their possession a Korean Citizen Identification Card during performance under this contract.

1.5.11.2. The Contractor shall ensure that employees have a current and valid driver’s license before allowing the employee to operate a Contractor-owned vehicle on the base. The Contractor and its employees shall comply with all security requirements imposed by the local installation commander at all times while on the military installation. Any Contractor traffic violations may result in the denial of driving privileges on the installations.

A copy of all licenses shall be provided to the COR ten (10) Calendar days of contract award.

1.5.11.3. All Contractor employees shall abide by all Government installation regulations during performance under this contract.

1.5.11.4. The CM will be authorized escort privileges for people working under this contract and only during hours stated under this contract. If the additional employee require escort privilege to perform contract requirement, the Contractor shall submit the written document to a COR for approval.

1.5.12. SAFETY:

1.5.12.1. Safety Requirements: The Contractor shall insure that safety precautions are taken during the performance of this contract to protect the lives of Contractor personnel, the property of the U.S. Government, the Republic of Korea, as well as the private individuals and firms who may be exposed to or endangered by the Contractor’s actions to maintain minimal accidents/incident, zero loss of life and minimal damage to property. The Contractor shall submit safety plan to the COR within ten (10) Calendar days after award of this contract. The safety plan shall clearly describe the Contractor’s Safety training, safety method, and practices such as standardized procedures to monitor performance, identify discrepancies, and take corrective action to prevent re-occurrence of any safety issue. The safety plan shall be confirmed and accepted by COR within five (5) Working days if there is any changes after COR review. The safety plan shall comply with EM 385-1-1, the US Army Corps of Engineers Safety and Health Requirements Manual and the Korean Occupational Safety and Health Act (KOSHA). The Contractor shall take measures to protect pedestrians from flying debris during grass cutting, edging, trimming, and sweeping (blowers) operations. The Contractor shall exercise safety and health precautions as necessary to prevent safety hazards to personnel, materials, and equipment. Unsafe practices and/or conditions will be immediately called to the attention of the Contract Manager for remedial or corrective action. Conditions beyond the Contractor’s responsibility will be referred to the COR for corrective action. Contractor’s employees shall be thoroughly indoctrinated on safe operating procedures and precautions essential to the accomplishment of their tasks. Safety measures shall be implemented and adhered to by the Contractor.

1.5.12.2. Accident Investigations, Reports, and Logs: The safety plan shall include a copy of the Contractor’s accident investigation reporting format, and logs. Report all accidents as soon as possible but not more than 30 minutes of accident occurrence to the Contracting Officer/Representative (KO/COR). The Contractor shall thoroughly investigate the accident and submit the findings of the investigation along with appropriate corrective actions to the KO/COR in the accident investigation reporting format as soon as possible but no later than five (5) working days following the accident. Implement corrective actions as soon as reasonably possible. The accident investigation reporting format shall include at a minimum.

· Contract Number and Contract Name/Description

· Name of Contractor

· Date/Time of Accident

· Date report was completed

· Detail description of events that lead to the accident

· Root cause of accident

· Corrective action(s) to prevent recurrence

1.5.12.3. The following require immediate accident notification and written accident report:

· A fatality

· A permanent total or permanent partial disability

· The hospitalization of three or more people resulting from a single occurrence

· Property damage of $200.00 or more

1.5.12.4. The Contractor shall immediately correct all safety deficiencies upon notification of the deficiencies by the COR/Alternate Contracting Officer’s Representative (ACOR)/ Quality Assurance Representative (QAR), and shall notify the COR of the corrective action to be taken.

1.5.13. ANTITERRORISM AND OPERATIONS SECURITY (OPSEC)

1.5.13.1. AT Level I Training: All Contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training within fourteen (14) calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR within fourteen (14) calendar days after completion of training by all employees and subcontractor personnel. AT level 1 awareness, training is available at the following website: https://atlevel1.dtic.mil/at.

1.5.13.2. Access and General Protection/Security Policy and Procedures: Contractor’s and all associated sub-Contractors’ employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshall Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.

1.5.13.3. iWATCH Training: This standard language is for Contractor employees with an area of performance within an Army controlled installation, facility or area. The Contractor and all associated sub-Contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within thirty (30) calendar days of contract award and within thirty (30) calendar days of new employees commencing performance with the results reported to the COR NLT thirty (30) calendar days after completing the training.

1.5.13.4. For Contracts that Require OPSEC Training: Per AR 530-1, Operations Security, new Contractor employees must complete Level I OPSEC training within 30 calendar days of contract award. All Contractor employees must complete annual OPSEC awareness training.

2. DEFINITIONS AND ACRONYSM:

2.1. DEFINITIONS:

2.1.1. Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.2. Contractor Acquired Property: Property acquired, fabricated, or otherwise provided by the Contractor for performing a contract and to which the Government has title.

2.1.3. Contract Manager (CM): A person with authority make on-site decisions on behalf of the Contractor on contract matters.

2.1.4. Contracting Officer (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.5. Contracting Officer’s Representative (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.6. Debris: Includes, but is not limited to paper, cans, bottles, limbs and branches, pine straw and pine cones, leaves, rocks, and other similar items.

2.1.7. Defective Service. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.8. Deliverable. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.9. Equipment A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale, and does not ordinarily lose its identity or become a component part of another article when put into use. Equipment does not include material, real property, special test equipment or special tooling.

2.1.10. Government Furnished Property. Property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government- furnished property also includes Contractor-acquired property if the Contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.

2.1.11. Government Property. All property owned or leased by the Government. Government property includes both Government-furnished property and Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.

2.1.12. Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.13. Loss of Government Property. Unintended, unforeseen or accidental loss, damage, or destruction of Government property that reduces the Government’s expected economic benefits of the property. Loss of Government property does not include occurrences such as purposeful destructive testing, obsolescence, normal wear and tear, or manufacturing defects. Loss of Government property includes, but is not limited to:

Items that cannot be found after a reasonable search;

Theft

Damage resulting in unexpected harm to property requiring repair to restore the item to usable condition; or

Destruction resulting from incidents that render the item useless for its intended purpose or beyond economical repair.

2.1.14. Material. Property that may be consumed or expended during the performance of a contract, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end-item. Material does not include equipment, special tooling, and special test equipment or real property.

2.1.15. Physical Security. Actions that prevent the loss or damage of Government property.

2.1.16. Property. All tangible property, both real and personal.

2.1.17. Property Administrator. An authorized representative of the KO appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a Contractor.

2.1.18. Property Records. Records created and maintained by the Contractor in support of its stewardship responsibilities for the management of Government property.

2.1.19. Provide. To furnish, as in Government-furnished property, or to acquire, as in Contractor-acquired property.

2.1.20. Pruning: Pruning is selectively removing unwanted growth to make a plant or tree grow or respond in a desired manner.

2.1.21. Quality Assurance. The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.22. Quality Assurance Surveillance Plan. An organized document written by the government specifying the surveillance methodology used for surveillance of Contractor performance.

2.1.23. Quality Control. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.24. Real Property. See Federal Management Regulation 102-71.20 (41 CFR 102-71.20).

2.1.25. Sensitive Property means property potentially dangerous to the public safety or security if stolen, lost, or misplaced, or that shall be subject to exceptional physical security, protection, control, and accountability. Examples include weapons, ammunition, explosives, controlled substances, radioactive materials, hazardous materials or wastes, or precious metals.

2.1.26. Trimming: Cutting of grass and other vegetation around grounds obstacles that prevent mowing.

2.1.27. Unit Acquisition Cost means:

For Government-furnished property, the dollar value assigned by the Government and identified in the contract; and

For Contractor-acquired property, the cost derived from the Contractor’s records

2.1.28. Wide Area Work Flow (WAWF): A secure web based system for electronic invoicing, receipt, and acceptance. WAWF allows government vendors to submit and track invoices and receipt/acceptance documents over the web and allows government personnel to process those invoices in a real-time, paperless environment.

2.1.29. Work Day. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.30. Work Week. Monday through Friday, unless specified otherwise.

2.1.31. Vegetation: 6 inches or over height of grass and bush and tree shoots.

2.2. ACRONYMS:

ACOR

Alternate Contracting Officer’s Representative

AFARS

Army Federal Acquisition Regulation Supplement

AR

Army Regulation

CAP

Contractor Acquired Property

CFR

Code of Federal Regulations

COR

Contracting Officer Representative

DA

Department of the Army

DFARS

Defense Federal Acquisition Regulation Supplement

DOD

Department of Defense

FAR

Federal Acquisition Regulation

GFP

Government-Furnished Property

KO

Contracting Officer

OCI

Organizational Conflict of Interest ODC Other Direct Costs

PA

Property Administrator

PIPO

Phase In/Phase Out

POC

Point of Contact

PRS

Performance Requirements Summary

PWS

Performance Work Statement

QA

Quality Assurance

QASP

Quality Assurance Surveillance Plan

QC

Quality Control

QCP

Quality Control Plan

TE

Technical Exhibit

WAWF

Wide Area Work Flow

3. GOVERNMENT FURNISHED ITEMS AND SERVICES

3.1. GENERAL: The Government may provide office and storage spaces to be used for keeping contractor’s equipment and utilities such as water, electricity, and heat without charge.

3.2. The Government does not, by providing such office and storage space and such utilities, assume any liability for damage to or loss of Contractor’s property or for injury or death of any person resulting from fire, theft or any other cause. Contractor shall indemnify the Government from any and all such potential liability.

3.3. If the Government facility is not available for this contract, the Contractor shall coordinate with the COR the erection of any temporary facility (s) before, during and after the performance of the contract. The Contractor shall obtain an approved U.S Government Real Estate Permit from Camp Casey Real Property Engineers. The Contractor shall also obtain an approved EANC Form 69, (Construction Permit), before erecting any temporary facility(s). The Contractor shall obtain all of the necessary Real Estate Permits required by the Government prior to the release of the site-area to the Contractor. The COR may assist the Contractor with any required information concerning the process of obtaining the Real Estate Permits.

The temporary facility(s) shall be a metal connection type trailer. Trailer(s) must have the necessary utility hook-ups.

The Government is not responsible for any erection of facilities or expenses of any required utility hook-ups.

The Contractor shall be responsible for all expenses.

3.4. All reasonable quantities of water and electricity shall be furnished at no charge to the Contractor for work performed on USFK installations. Coordination shall be made with the COR for locations of water and electrical supply points. Temporary connections shall be made and removed at the Contractor’s own expense, regardless of distance or accessibility of existing service. Experienced craftsmen shall make all connections and they shall be coordinated with COR. The Contractor shall pay for costs for repair of utility systems damaged by the Contractor

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1. GENERAL: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2. The Contractor shall furnish a sufficient number of vehicles suitable for the transportation of personnel, materials, and equipment for use in the performance of this contract. The contractor’s motor vehicles shall be operated and maintained in accordance with applicable local vehicle standards, USFK Regulation 190-1, Army installation regulations, and shall be maintained in a serviceable condition. The Contractor shall display its company name, and telephone number on all vehicles to be used in the performance of grounds maintenance activities.

4.3. The Contractor shall furnish all the equipment and its related items, such as fuel oil and gasoline for use in Vehicles and equipment necessary to perform grounds maintenance services.

4.4. Equipment for execution of this contract is the responsibility of the contractor. All equipment used under this contract will be inspected by the COR/QAE prior to its use. If the equipment is at any time deemed unsafe or unserviceable by the COR/QAE, the Contractor shall remove equipment from the post within 24 hours or have it repaired to provide a safe and continuing operation. The Contractor is responsible for ensuring that the equipment shall be of the appropriate type for the work to be accomplished, that it is in a safe operating condition, that it is used in a safe manner, and that it is used in a safe environment and condition. The Contractor shall submit a list of equipment as a part of technical proposal.

4.5. The Contractor shall comply with the provisions of the Army Regulation 420-1, Chapter 25, Section VIII, located on the Web Page, http://www.apd.army.mil/. The Contractor shall provide suitable fire extinguishers at any material storage area and/or office area used or constructed by the Contractor.

4.6. ENVIRONMENTAL COMPLIANCE: The Contractor shall comply with all federal, state, local and installation environmental laws, rules and plans. The Contractor shall use and store all materials, chemicals, and equipment used in the performance of services on the installation in accordance with industry standards, local, federal and state laws, and according to manufactures' recommendations. The Contractor will submit Material Safety Data Sheets (MSDS) for COR approval on all materials 15 days prior to use. The Contractor shall make all environmental and hazardous material records available at the beginning of the next duty day after the Government’s request to view the records.

5. SPECIFIC TASKS:

5.1. FIRM FIXED PRICED PORTION OF WORK (CLINs X001 – X002): The Contractor shall provide scheduled ground maintenance services in accordance with the following:

5.1.1. GRASS CUTTING:

5.1.1.1. The Contractor shall provide all necessary labor, materials, tools equipment and transportation required for grass cutting services.

5.1.1.2. The Contractor shall mow the grass at the designated areas as specified in Attachment #1 during greenery Season (April thru October).

5.1.1.3. The Contractor shall set the mower height to three (3) inches for all areas, and maintained no higher than six (6) inches at Improved ground area (High Visibility) and Semi-improved ground area (Common area), and no higher than seven (7) inches at Fire Breaks and Ranges, and Unimproved ground area.

5.1.1.4. Before operating weed eaters, power mowers, or riding mowers, the Contractor shall clear the area of any wire, bottles, cans, rocks, stones, loose trash or any other debris which may cause damage to real property, vehicles and injury to personnel. The Contractor shall dispose of these items off base at the Contractor’s expense.

5.1.1.5. The Contractor shall ensure the cut grass presents an even and uniform appearance.

5.1.1.6. Concurrent with each mowing cycle, the Contractor shall trim and edge the grass along building, structures, curbs, sidewalks, walks, ditch-lines, tree plant beds, hedges, fences, shrubs, wear outlets, signs, valve boxes, driveways, and roadways. The Contractor shall trim the grass so that its height does not exceed height of the adjacent mowed grass.

5.1.1.7. The Contractor shall trim grass around trees, shrubs, flower beds, facilities, fence lines, ditch-lines, and any ground protrusions concurrently with mowing. The Contractor shall trim carefully to ensure trees, shrubs, flowers, facilities, and protrusions are not damaged, and shall ensure that the height of the trimmed grass does not exceed height of the adjacent mowed grass.

5.1.1.8. The Contractor shall edge all sidewalks and curbs concurrently with mowing, to ensure there is a clean ½ (Half) inch to 1 (one)-inch break line between the grass and concrete, with no overlapping of grass. The Contractor shall remove all weeds from cracks in sidewalks, pads, ditch-lines, pavement, and curbs joints.

5.1.1.9. Any areas damaged by the Contractor shall be repaired by the Contractor at no additional cost to the Government, to the satisfaction of the Contracting Officer or COR.

5.1.1.10. The Contractor shall remove grass cuttings from cracks and expansion joints in sidewalks, curbs, pavements, ditch-lines, and gutters at the end of each workday and after each grass cutting cycle. At the end of each day of grass cutting services, the Contractor shall remove all grass cuttings from the installation.

5.1.1.11. When cutting grass around the fuel tank areas identified, the Contractor shall not use grass cutting equipment powered by electrical motors or internal combustion engines. The Contractor shall trim the grass so that its height does not exceed height of the adjacent mowed grass.

5.1.1.12. The Contractor shall ensure all streets, parking lots, sidewalks, pads, and curbs are free of yard debris immediately after grass cutting. The Contractor shall remove all grass cuttings or other yard debris discharged on streets, parking lots, sidewalks, pads, and curbs generated by grass mowing activities.

5.1.2. RAKING LEAVES:

5.1.2.1. The Contractor shall provide all necessary labor, materials, tools, equipment, and transportation required for raking leaves and debris from the designated area as specified in Attachment #1 during October thru December.

5.1.2.2. The Contractor shall rake and collect all the fallen leaves and debris such that there is no more than a total of thirty six (36) square inches of coverage any given area of one square yard, and remove the collective materials from the installation at the end of each workday. Debris is defined as paper products, cans, bottles, cigarette butts, wood scraps, fallen branches, plastic products, cloth products, food stuffs and other articles discarded and considered trash.

5.2. REQUIREMENTS PORTION OF WORK (CLINs X0003-X004): Upon receipt of written Task Order from the Contracting Officer, the Contractor shall provide services in accordance with the following:

5.2.1. CLEARING PERIMETER FENCE:

5.2.1. Upon receiving separate delivery order, the Contractor shall provide all necessary labor, materials, tools, equipment, and transportation for clearing security clear zone along the perimeter fence lines specified in Attachment #1.

5.2.1.2. The Contractor shall remove arrow root vines from the fence, and cut and trim all the trees and bushes on 2 meters in and outside of the perimeter fence alongside 2ID installation boundaries for Camp Casey Enclave.

5.2.1.3. Branches of trees extending over the clear zones shall be pruned to provide a clear height of three (3) meters above ground level.

5.2.1.4. All cut and trimmed trees & bushes, and arrow root vines shall be removed from the 2ID installation.

5.2.2. CLEANING CASEY CREEK:

5.2.2.1. Upon receiving separate delivery order, the Contractor shall provide all necessary labor, materials, tools, equipment, and transportation for cleaning of designated areas in Casey creek. The Casey creek area within U.S. Government property is specified in Attachment #1.

5.2.2.2. The Contractor shall cut and remove bushes and trees including all plant growth at an average twenty (20) meter width of stream beds and both sides of the stream banks, and remove accumulated dirt, debris, rubbish, weeds, brush and other materials which may retard flow of the Casey creek in Camp Casey and Hovey.

5.2.2.3. All cut bushes and trees, and taken out debris shall be removed from the 2ID installation.

5.3. CONTRACTOR MANPOWER REPORTING (CMR):

5.3.1. The Contractor shall report ALL Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the ground maintenance service in Casey Enclave. The Contractor shall completely fill in all required data fields using the following web address: http://www.ecmra.mil/, and then click on "Department of the Army CMRA" or the icon of the DoD organization that is receiving or benefitting from the contracted services.

5.3.2. Reporting inputs shall be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2019. The Contractor may direct questions to the help desk by clicking on "Send an email" which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component's CMR website".

6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)

6.1. The Contractor shall abide by all applicable regulations, publications, manuals, and local policies and procedures. Any such changes to documents which cause a change in performance within the meaning of the “Changes” clause will be not implemented by the Contractor unless or until a change order or modification to the contract is issued by the KO. Any Contractor provided publications are to be procured and maintained at Contractor’s expense

PUBLICATION
DESCRIPTION
TM 5-630
Land Management
TB 420-22
Roads, Grounds, Pest Control Refuse Collection-Hand Book
AR 190-5
Motor Vehicles Traffic Supervision
AR 200-1
Environmental Protection and Enhancement
AR 385-10
Army Safety Program
EM 385-1-1
Safety and Health Requirements Manual

7. ATTACHMENT/TECHNICAL EXHIBIT LIST

7.1. ATTACHMENT #1: LOCATION MAPS FOR GROUND MAINTENANCE (it will be attached when the solicitation issued by separately)

Attachment 1-1: Grass Cutting for Camp Casey

Attachment 1-2: Grass Cutting for other area

Attachment 1-3: Raking Leaves for Camp Casey

Attachment 1-4: Raking Leaves for other area

Attachment 1-5: Clearing Fence and Cleaning Creek for Camp Casey

Attachment 1-6: Clearing Fence and Cleaning Creek for other area

7.2. ATTACHMENT #2: PERFORMANCE REQUIREMENT SUMMARY (PRS)

7.3. ATTACHMENT #3: DELIVERABLES SCHEDULE

ATTACHMENT #2

PERFORMANCE REQUIREMENTS SUMMARY

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

PERFORMANCE OBJECTIVE
STANDARD
AQL
METHOD OF SURVEILLANCE
REMEDY
Para 5.1.1. Grass Cutting
Grass height shall not be higher than specified in PWS, and cut grass shall present an even and uniform appearance.
98%
Random and periodic inspection
Re-performance of the work within 24 hours of notification
Para 5.1.2. Raking Leaves
Fallen leaves and debris shall not over 36 inches of coverage any given area of one square yard
98%
Random and periodic inspection
Re-performance of the work within 24 hours of notification
Para 5.2.1. Clearing Perimeter Fence
All of arrow root vines shall be removed from the fence, and all the trees and bushes shall be cut and trimmed on 2 meters in and outside of the perimeter fence
98%
Final Inspection
Re-performance of the work within 24 hours of notification
Para 5.2.2. Cleaning Casey Creek
All of bushes and trees shall be cut and removed from the Casey Creek
98%
Final Inspection
Re-performance of the work within 24 hours of notification
Para 1.5.8. Contract Manager
The CM shall be a prime contractor’s employee and the CM shall stay at jobsite between 0730-1630 hours, Monday through Friday for the life of contract
98%
Random or periodic or annual inspection

ATTACHMENT #3

DELIVERABLES SCHEDULE

DELIVERABLE
FREQUENCY
# OF COPIES
MEDIUM/FORMAT
SUBMIT TO

1.5.3

Monthly Schedule At least seven (7) calendar days before starting of following month

Excel Spreadsheet thru E-mail
COR

1.5.4

Quality Control Program (QCP) Within ten (10) calendar days of the award of this contract.

One electronic copy
Electronic PDF format thru E-mail
COR

1.5.12.1

Safety Plan

within ten (10) calendar days of the award of this contract
One electronic copy
Electronic PDF format thru E-mail
COR

1.5.13.1

AT Level I Training Certificate

within fourteen (14) calendar days after contract start date
One electronic copy
Electronic PDF format thru E-mail
COR
1.5.13.3 iWATCH Training Result
Within thirty (30) calendar days of the award of this contract
One electronic copy
Electronic PDF format thru E-mail
COR

1.5.13.4

OPSEC Training Result

Within thirty (30) calendar days of the award of this contract
One electronic copy
Electronic PDF format thru E-mail
COR

(End of Summary of Changes)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04

EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

SEE NEXT PAGES

1. CONTRACT ID CODE

PAGE OF PAGES

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

14-Dec-2018

16B. UNITED STATES OF AMERICA

15C. DATE SIGNED

15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)

(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code)

X

W91QVN19R0010

9B. DATED (SEE ITEM 11)

26-Nov-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Dec-2018

CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

SERVICES DIV, UNIT #15289

APO AP 96271

UNITED STATES

W91QVN

7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

See Item 6

FACILITY CODE

EMAIL:

TEL:

File details come from the government source that posted it.