A21._TE_1_-_Deliverable_Schedule.pdf
PDF 16 KB Posted
- Attached to
- FUEL STORAGE TANK ITM&R
- Solicitation number
- W91QVN19R0003
About this file
DELIVERABLE SCHEDULE
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A21._Amendment_02.docx | DOCX document | |
| A21._Amendment_01.pdf | ||
| A21._W91QVN-19-R-0003.docx | DOCX document | |
| A21._Attachment_4_-_Annual_Checklist.pdf | ||
| A21._Attachment_2_-_INVENTORY_MINIMUM_DATA_FIELD.pdf | ||
| A21._Attachment_3_-_Monthly_Checklist.pdf | ||
| A21._TE_2_-_FEI_and_FII_Guide_Lines.pdf | ||
| A21._Attachment_1_-_Final_Fuel_Tank_List.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT#1
DELIVERABLES SCHEDULE
Data No
Title of Data Item
Contract Reference
Frequency As of Date Distribution Type and Quantity
Certificate for
STI SP001 ATS
Inspector
Para 1.6.11.12
One time
2018 first class date in STI SPFA prior to starting actual work
COR and
KO
1 hard copy 1 electronic, (English Version)
Initial Tank
Inventory with STI baseline survey and Pre- Inspection Service report
Para 5.1.1
No later than 30 working days after NTP issued.
(Korean, English
Periodic Monthly/Ann ual Inspection & Preventive maintenance
Report & working Schedule
Para 5.2 thru 5.2.1.2
Monthly
By the end of every month
COR
(Korean, Formal Internal/Form al External Safety
Operational Inspection service report
Para 5.2.1.3
As required
Within 10 working days after completion
(Korean, Service Order Calls Report
(Routine Calls)
Para 5.3.1 thru 5.3.2.6
Within 1 calendar days after completion of call service.
(Korean, Major Repair/Repl acement Parts Works Quotation
Para 5.3.4
Within 7 after repair things were found
(Korean, Major Repair/Repl acement Parts Works
Report
Para 5.3.4.1
Within 3 after repair/replacem ent
(Korean, QCP
Para 5.7.2
Within 30 after award of contract
(Korean,