RFP# W91QVN-18-R-0219 Technical Exhibits
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91QVN-18-R-0219__Bulk_Waste_Service.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USAG Humphreys Bulk, Construction/Demolition, Commercial, and Institutional Waste Management
Technical Exhibits.
Technical Exhibit (TE) 1--Area Map.
Technical Exhibit (TE) 2 - Estimated Workload Data.
The following are the approximate average amounts of the waste types collected annually from previous years (historical data).
a. Concrete & Asphalt (1200 ton)
b. Wood (250 ton)
c. General Mixed Refuse (100 ton)
Below are pictures that represent the accumulated amounts of Construction/Demolition and General Mixed Refuse (Bulk) waste that are currently being stored at the current bulk transfer facility and DPW construction laydown yard as of the dates listed in the respective pictures:
Current DPW Laydown Yard:
Assorted refuse as of 30MAY2018
Construction/Demolition waste as of 30MAY2018
Current DPW Laydown Yard:
Assorted and Construction/Demolition Waste as of 30MAY2018
West Bulk Transfer Facility: As of 24JUL2018
West Bulk Transfer Facility: As of 24JUL2018
South Bulk Transfer Facility: As of 15JUN2018
Technical Exhibit (TE) 3 Pick-Up Locations: Below are the building numbers to be serviced. Additional building numbers shall be added as the need for service becomes known.
12001
12002
12003
12005
12006
12008
12009
12050
12051
12053
12054
12055
12058
12312
12313
12355
12400
12401
12408
12409
12410
12412
12421
12422
12600
12601
12700
12701
12703
12710
12711
12712
1019A
1039A
1039B
2014A
7117C
7127C
7138C
7217C
7218C
7219C
7220C
7221C
7248C
7249C
In addition to the above listed locations, the following are targeted pick-up locations that must be serviced:
1) West Bulk Transfer Facility
2) South Bulk Transfer Facility
3) Current DPW lay down yard
4) Behind the Post Exchange (PX)
5) Behind the Commissary
6) New DPW lay down yard
Army Family Housing locations:
AFH050: 5653,5800, 5801, 5802, 5803, 5804, 5805, 5806, 5807, 5808, 5809, 5810, 5811, 5812, 5813, 5814, 5815, 5816, 5817, 5818, 5819, 5820, 5821, 5822, 5823, 5824, 5825, 5826, 5827
AFH060 and AFH070: 5600, 5601, 5602, 5603, 5604, 5605, 5606, 5607, 5608, 5609, 5610 5611, 5612, 5613, 5614, 5615, 5616, 5617, 5618, 5619, 5620, 5621 5622, 5623, 5624, 5625, 5626, 5627, 5628, 5629, 5630, 5631, 5632, 5633, 5634, 5635, 5636, 5637, 5638, 5639, 5640, 5641, 5642, 5643,5644, 5645, 5646, 5647, 5648, 5649, 5650, 5651, 5652, 5654, 5655, 5657, 5600
All sites are annotated on the map included in Technical Exhibit (TE) 2--Area Map.
Technical Exhibit (TE) 4 - Special Services/Events: “On Demand-Requirements”
Major USAG Humphreys installation events that may require refuse removal support will be planned, AT LEAST two (2) weeks in advance and the Contractor shall provide the services necessary to support the event. The Contractor shall deliver these additional collections services, on an as requested/needed/contingency basis, at the event or locations for the period of time specified by the COR/ACOR-as prescribed by the KO.
For Directorate of Plans, Training, Mobilizations, and Security (DPTMS):
· Key Resolve: 01 through 31 MAR 2019 (subject to change)
· Ulchi Freedom Guardian: 01 through 31 AUG 2019
· Key Resolve: winter/spring
· Ulchi Freedom Guardian: summer/fall
· Key Resolve: winter/spring
· Ulchi Freedom Guardian: summer/fall
· Key Resolve: winter/spring
· Ulchi Freedom Guardian: summer/fall
· Key Resolve: winter/spring
· Ulchi Freedom Guardian: summer/fall
For the Directorate of Family, Morale, Welfare, and Recreation (DFMWR):
· October 27: Spooky Hallow/Trunk-a-Treat
· December 07: Community Tree Lighting Ceremony
· February 04: Super Bowl Parties
· April 06: Month of the Military Child Community Carnival
· April 21: “Eggstravaganza”
· May 18: Spring Fest
· July 04: Celebrate Independence
· September 7: Fall Fest
· September 28: Oktoberfest
2020 (Projected)
· February: Super Bowl Parties
· April: Month of the Military Child Community Carnival
· April: “Eggstravaganza”
· May: Spring Fest
· July 04: Celebrate Independence
· September: Fall Fest
· September: Oktoberfest
2021 (Projected)
· February: Super Bowl Parties
· April: Month of the Military Child Community Carnival
· April: “Eggstravaganza”
· May: Spring Fest
· July 04: Celebrate Independence
· September: Fall Fest
· September 28: Oktoberfest
2022 (Projected)
· February: Super Bowl Parties
· April: Month of the Military Child Community Carnival
· April: “Eggstravaganza”
· May: Spring Fest
· July 04: Celebrate Independence
· September: Fall Fest
· September 28: Oktoberfest
2023 (Projected)
· February: Super Bowl Parties
· April: Month of the Military Child Community Carnival
· April: “Eggstravaganza”
· May: Spring Fest
· July 04: Celebrate Independence
· September: Fall Fest
· September/October: Oktoberfest image1.emf image2.emf
Bulk Debris pick up locations.pdf
!7
PX
West Bulk Transfer Facility
South Bulk Transfer Facility
Commissary
New DPW Construction Laydown Yard
Current Construction Laydown Yard
657B
12404
12113
12713
12702
882T
5306T5420T
6321T
740T
738T
739T
6326T
6324T
3040T
3020T
6320T
6005T
726T
6002T
6704T 6702T
2002T
6004T
12423
6001T
12211
12205
12208
12202
8210T
8204T
8224T
7211T
7110T
7440T
7241T
7231T
7430T
7130T
7120T
6706T
1235T
8300T
8310T
2110T
7300T
123T
1052C
5230T
12107
68026810
12413
12387
12382
12392
6120T
5555 5556
6322T
12420
10038
53005420
12400
12600
12120
12410
12601
12106
12100
12412
PMO
12055
12710
12103
1220312200
12206 12209
69106918
12375
12110
12401
12001 12002
12700
12385
12058
12388
12921290
12006
12005
12059
365 367
12409
12008
484483
2105 2106
11271137
12380
56305625
5637 5639
5624 5612
564056355631 5600
5605 5603
58235822
58035817
58185816
5824 5826
5810 5808
12711
12701
10652091
12301
12302
1032 1045
2251 1293
12321
2014A
12300
12312
12310
12703
12712
12050
12054
12003
83078314 8305
1039A
5420A
55065517
12313 12306
12422 12421
West Flood Gate
Daechu Flood Gate 3
Daechu Flood Gate 2
Dodo Flood Gate 1
UNCLASSIFIED
µ
0 0.5 10.25 Miles
Legend !7 New Refuse Site
Dumpster Enclosures Installation Boundary
REFUSE COLLECTION FACILITY MAP