| File | Type | Posted |
|---|---|---|
| W91QVN18R0160_Solicitation.pdf | ||
| W91QVN18R0160_Drawing.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal Register
| TITLE: | REPLACE EXISTING OVERHEAD UTILITIES WITH UNDERGROUND | SUBMITTAL REGISTER | |||||||||||||||
| JOB NAME: | PACKAGE #8, DEMOLISH OVERHEAD LINES, EQUIPMENT, STREET LIGHTING CIRCUITS | ||||||||||||||||
| LOCATION: | K16 ARMY AIRFIELD, KOREA | ||||||||||||||||
| CONTRACT NO: | |||||||||||||||||
| CONTRACTOR: | |||||||||||||||||
| CONTRACTOR SCHEDULE DATES | SOURCE OF MATERIAL | APPROVING AUTHORITY | |||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (o) | (p) | (q) | (r) | |||
| Line | Activity # | Trans-mittal # | Specification Section | SD # | Submittal Description | Item Submitted | Paragraph # | Classification: GOVT or A/E Revwr | Submit | Approval Needed By | Material Needed By | Local | Offshore | Action Code | Date Of Action | Sent To Contractor | Remarks |
| 1 | 01 30 00 | 01 | Preconstruction Submittals | View location map | 1.4 | G | |||||||||||
| 2 | 01 30 00 | 01 | Preconstruction Submittals | Progress and completion pictures | 1.5 | ||||||||||||
| 3 | 01 32 01.00 10 | 01 | Preconstruction Submittals | Preliminary Project Schedule | 3.4.1 | G | |||||||||||
| 4 | 01 32 01.00 10 | 01 | Preconstruction Submittals | Initial Project Schedule | 3.4.2 | G | |||||||||||
| 5 | 01 32 01.00 10 | 01 | Preconstruction Submittals | Initial Project Schedule | 3.4.2 | G | |||||||||||
| 6 | 01 32 01.00 10 | 01 | Preconstruction Submittals | Periodic Schedule Updates | 3.4.3 | G | |||||||||||
| 7 | 01 33 00 | 01 | Preconstruction Submittals | Submittal register | 1.8 | G | |||||||||||
| 8 | 01 35 26 | 01 | Preconstruction Submittals | SAFETY PLAN /ACCIDENT PREVENTION PLAN (APP) | 1.6 | ||||||||||||
| 9 | 01 35 26 | 01 | Preconstruction Submittals | Activity Hazard Analysis (AHA) | 1.7 | ||||||||||||
| 10 | 01 35 26 | 01 | Preconstruction Submittals | Crane Critical Lift Plan | 1.6.1 | ||||||||||||
| 11 | 01 35 26 | 01 | Preconstruction Submittals | Crane Operators | 1.5.1.2 | ||||||||||||
| 12 | 01 35 26 | 06 | Test Reports | Notifications and Reports | 1.11 | ||||||||||||
| 13 | 01 35 26 | 06 | Test Reports | Accident Reports | 1.11.2 | ||||||||||||
| 14 | 01 35 26 | 06 | Test Reports | Crane Reports | 1.11.3 | ||||||||||||
| 15 | 01 35 26 | 06 | Test Reports | Certificate of Compliance | 1.11.4 | ||||||||||||
| 16 | 01 35 26 | 07 | Certificates | Confined Space Entry Permit | 1.8 | ||||||||||||
| 17 | 01 35 26 | 07 | Certificates | Hot work permit | 1.8 | ||||||||||||
| 18 | 01 35 26 | 07 | Certificates | License Certificates | 1.13 | ||||||||||||
| 19 | 01 45 00.00 10 | 01 | Preconstruction Submittals | Quality Control Plan | 3.2 | G | |||||||||||
| 20 | 01 50 00 | 01 | Preconstruction Submittals | Construction site plan | 1.4 | G | |||||||||||
| 21 | 01 50 00 | 01 | Preconstruction Submittals | Traffic control plan | 3.4.1 | G | |||||||||||
| 22 | 01 50 00 | 01 | Preconstruction Submittals | Temporary Power Services Diagram | 3.3.4 | ||||||||||||
| 23 | 01 50 00 | 06 | Test Reports | Backflow Preventer Tests | 1.5 | G | |||||||||||
| 24 | 01 50 00 | 07 | Certificates | Backflow Prevention Training Certificate | 1.5.2 | G | |||||||||||
| 25 | 01 50 00 | 07 | Certificates | Backflow Preventers | 1.5.1 | ||||||||||||
| 26 | 01 58 00 | 02 | Shop Drawings | Construction Project Sign | 1.2.1 | G | |||||||||||
| 27 | 01 78 00 | 03 | Product Data | As-Built Record of Equipment and Materials | 1.3.2 | ||||||||||||
| 28 | 01 78 00 | 03 | Product Data | Equipment-in-Place List | 1.3.4 | ||||||||||||
| 29 | 01 78 00 | 03 | Product Data | Warranty Management Plan | 1.6.1 | ||||||||||||
| 30 | 01 78 00 | 03 | Product Data | Warranty Tags | 1.6.5 | ||||||||||||
| 31 | 01 78 00 | 03 | Product Data | Spare Parts Data | 1.4 | ||||||||||||
| 32 | 01 78 00 | 08 | Manufacturer’s Instructions | Preventative Maintenance | 1.5 | ||||||||||||
| 33 | 01 78 00 | 08 | Manufacturer’s Instructions | Condition Monitoring (Predictive Testing) | 1.5 | ||||||||||||
| 34 | 01 78 00 | 08 | Manufacturer’s Instructions | Inspection | 1.5 | ||||||||||||
| 35 | 01 78 00 | 08 | Manufacturer’s Instructions | Instructions | 1.6.1 | ||||||||||||
| 36 | 01 78 00 | 10 | Operation and Maintenance Data | Operation and Maintenance Manuals | 1.7 | ||||||||||||
| 37 | 01 78 00 | 11 | Closeout Submittals | Record Drawings | 1.3.1 | ||||||||||||
| 38 | 01 78 00 | 11 | Closeout Submittals | Interim Form DD1354 | 1.9 | G | |||||||||||
| 39 | 01 78 00 | 11 | Closeout Submittals | Checklist for Form DD1354 | 1.9 | G | |||||||||||
| 40 | 02 41 00 | 01 | Preconstruction Submittals | Existing Conditions | 1.11 | G | |||||||||||
| 41 | 02 41 00 | 07 | Certificates | Demolition Plan | 1.2.1 | G | |||||||||||
| 42 | 02 41 00 | 07 | Certificates | Deconstruction Plan | 1.2.1 | G | |||||||||||
| 43 | 02 41 00 | 07 | Certificates | Notification | 1.7 | G | |||||||||||
| 44 | 02 41 00 | 11 | Closeout Submittals | Receipts | 3.3.4 | ||||||||||||
| 45 | 26 05 48.00 10 | 02 | Shop Drawings | Lighting Fixtures in Buildings | 3.2 | ||||||||||||
| 46 | 26 05 48.00 10 | 02 | Shop Drawings | Equipment Requirements | 1.3 | ||||||||||||
| 47 | 26 05 48.00 10 | 03 | Product Data | Lighting Fixtures in Buildings | 3.2 | G | |||||||||||
| 48 | 26 05 48.00 10 | 03 | Product Data | Equipment Requirements | 1.3 | G | |||||||||||
| 49 | 26 05 48.00 10 | 03 | Product Data | Contractor Designed Bracing | 1.2.4 | G | |||||||||||
| 50 | 26 08 00 | 06 | Test Reports | Acceptance tests and inspections | 3.1 | ||||||||||||
| 51 | 26 08 00 | 07 | Certificates | Qualifications | 1.4.1 | G | |||||||||||
| 52 | 26 08 00 | 07 | Certificates | Acceptance test and inspections procedure | 1.4.3 | G | |||||||||||
| 53 | 26 20 00 | 02 | Shop Drawings | Motor control centers | 2.23 | ||||||||||||
| 54 | 26 20 00 | 03 | Product Data | Transformers | 2.19 | G | |||||||||||
| 55 | 26 20 00 | 03 | Product Data | Motor controllers | 2.21 | G | |||||||||||
| 56 | 26 20 00 | 03 | Product Data | Metering | 2.34 | ||||||||||||
| 57 | 26 20 00 | 03 | Product Data | CATV outlets | 2.26.1 | ||||||||||||
| 58 | 26 20 00 | 03 | Product Data | Surge protective devices | 2.36 | ||||||||||||
| 59 | 26 20 00 | 06 | Test Reports | 600-volt wiring test | 3.5.2 | ||||||||||||
| 60 | 26 20 00 | 06 | Test Reports | Grounding system test | 3.5.5 | ||||||||||||
| 61 | 26 20 00 | 06 | Test Reports | Transformer tests | 3.5.3 | ||||||||||||
| 62 | 26 20 00 | 09 | Manufacturer’s Field Reports | Transformer factory tests | 2.38.1 | ||||||||||||
| 63 | 26 20 00 | 10 | Operation and Maintenance Data | Electrical Systems | 1.5.1 | ||||||||||||
| 64 | 26 20 00 | 10 | Operation and Maintenance Data | Metering | 2.34 | ||||||||||||
| 65 | 26 28 01.00 10 | 03 | Product Data | Fault Current Analysis | 2.14 | ||||||||||||
| 66 | 26 28 01.00 10 | 03 | Product Data | Protective Device Coordination Study | 2.14 | ||||||||||||
| 67 | 26 28 01.00 10 | 03 | Product Data | Equipment | 2.1 | ||||||||||||
| 68 | 26 28 01.00 10 | 03 | Product Data | System Coordinator | 1.4.1 | ||||||||||||
| 69 | 26 28 01.00 10 | 03 | Product Data | Protective Relays | 3.3.5 | ||||||||||||
| 70 | 26 28 01.00 10 | 03 | Product Data | Installation | 3.2 | ||||||||||||
| 71 | 26 28 01.00 10 | 06 | Test Reports | Field Testing | 3.3 | ||||||||||||
| 72 | 26 28 01.00 10 | 07 | Certificates | Devices and Equipment | 1.6 | ||||||||||||
| 73 | 26 56 00 | 02 | Shop Drawings | Luminaire drawings | 1.4.1.1 | ||||||||||||
| 74 | 26 56 00 | 03 | Product Data | Luminaires | 2.2 | ||||||||||||
| 75 | 26 56 00 | 03 | Product Data | Lamps | 2.2.1 | ||||||||||||
| 76 | 26 56 00 | 03 | Product Data | Ballasts | 2.2.2 | ||||||||||||
| 77 | 26 56 00 | 03 | Product Data | Lighting contactor | 2.3 | ||||||||||||
| 78 | 26 56 00 | 03 | Product Data | Time switch | 2.4 | ||||||||||||
| 79 | 26 56 00 | 03 | Product Data | Photocell switch | 2.5 | ||||||||||||
| 80 | 26 56 00 | 03 | Product Data | Aluminum poles | 2.6.2 | ||||||||||||
| 81 | 26 56 00 | 03 | Product Data | Steel poles | 2.6.3 | ||||||||||||
| 82 | 26 56 00 | 03 | Product Data | Brackets | 2.7 | ||||||||||||
| 83 | 26 56 00 | 03 | Product Data | Auxiliary instant-on quartz system | 2.9 | ||||||||||||
| 84 | 26 56 00 | 05 | Design Data | Design Data for luminaires | 1.4.3 | ||||||||||||
| 85 | 26 56 00 | 05 | Design Data | Pressure treated wood pole quality | 1.4.2 | ||||||||||||
| 86 | 26 56 00 | 05 | Design Data | Operating test | 3.2 | ||||||||||||
| 87 | 27 10 00 | 02 | Shop Drawings | Telecommunications drawings | 1.6.1.1 | G | |||||||||||
| 88 | 27 10 00 | 02 | Shop Drawings | Telecommunications Space Drawings | 1.6.1.2 | G | |||||||||||
| 89 | 27 10 00 | 03 | Product Data | Telecommunications cabling | 2.3 | G | |||||||||||
| 90 | 27 10 00 | 03 | Product Data | Patch panels | 2.4.5 | G | |||||||||||
| 91 | 27 10 00 | 03 | Product Data | Telecommunications outlet/connector assemblies | 2.5 | G | |||||||||||
| 92 | 27 10 00 | 03 | Product Data | Equipment support frame | 2.4.2 | G | |||||||||||
| 93 | 27 10 00 | 03 | Product Data | Connector blocks | 2.4.3 | G | |||||||||||
| 94 | 27 10 00 | 03 | Product Data | Spare Parts | 1.10.3 | ||||||||||||
| 95 | 27 10 00 | 06 | Test Reports | Telecommunications cabling testing | 3.5.1 | G | |||||||||||
| 96 | 27 10 00 | 07 | Certificates | Telecommunications Contractor | 1.6.2.1 | G | |||||||||||
| 97 | 27 10 00 | 07 | Certificates | Key Personnel | 1.6.2.2 | G | |||||||||||
| 98 | 27 10 00 | 07 | Certificates | Manufacturer Qualifications | 1.6.2.3 | G | |||||||||||
| 99 | 27 10 00 | 07 | Certificates | Test plan | 1.6.3 | G | |||||||||||
| 100 | 27 10 00 | 09 | Manufacturer’s Field Reports | Factory reel tests | 2.12.1 | G | |||||||||||
| 101 | 27 10 00 | 10 | Operation and Maintenance Data | Telecommunications cabling and pathway system | 1.10.1 | G | |||||||||||
| 102 | 27 10 00 | 11 | Closeout Submittals | Record Documentation | 1.10.2 | G | |||||||||||
| 103 | 31 00 00 | 01 | Preconstruction Submittals | Shoring | 3.5 | G | |||||||||||
| 104 | 31 00 00 | 01 | Preconstruction Submittals | Dewatering Work Plan | 1.3.3 | G | |||||||||||
| 105 | 31 00 00 | 01 | Preconstruction Submittals | Blasting | 1.3.2 | G | |||||||||||
| 106 | 31 00 00 | 03 | Product Data | Utilization of Excavated Materials | 3.9 | G | |||||||||||
| 107 | 31 00 00 | 03 | Product Data | Rock Excavation | 1.3.1.2 | ||||||||||||
| 108 | 31 00 00 | 03 | Product Data | Opening of any Excavation or Borrow Pit | 3.4 | ||||||||||||
| 109 | 31 00 00 | 03 | Product Data | Shoulder Construction | 3.15 | ||||||||||||
| 110 | 31 00 00 | 03 | Product Data | Structural Backfill | 2.7 | ||||||||||||
| 111 | 31 00 00 | 06 | Test Reports | Testing | 3.18 | ||||||||||||
| 112 | 31 00 00 | 06 | Test Reports | Borrow Site Testing | 2.1 | ||||||||||||
| 113 | 31 00 00 | 07 | Certificates | Testing | 3.18 | ||||||||||||
| 114 | 32 12 16 | 03 | Product Data | Mix Design | 2.3 | G | |||||||||||
| 115 | 32 12 16 | 03 | Product Data | Contractor Quality Control | 3.10 | G | |||||||||||
| 116 | 32 12 16 | 03 | Product Data | Material Acceptance | 3.11 | G | |||||||||||
| 117 | 32 12 16 | 03 | Product Data | Job Mix Formula | 2.3.1 | ||||||||||||
| 118 | 32 12 16 | 06 | Test Reports | Aggregates | 2.1 | G | |||||||||||
| 119 | 32 12 16 | 06 | Test Reports | QC Monitoring | 3.10.3.10 | ||||||||||||
| 120 | 32 12 16 | 07 | Certificates | Asphalt Cement Binder | 2.2 | ||||||||||||
| 121 | 32 12 16 | 07 | Certificates | Testing Laboratory | 3.6 | ||||||||||||
| 122 | 32 16 13 | 03 | Product Data | Concrete | 2.1 | ||||||||||||
| 123 | 32 16 13 | 06 | Test Reports | Field Quality Control | 3.8 | ||||||||||||
| 124 | 32 31 13 | 02 | Shop Drawings | Fence Assembly | 1.3 | G | |||||||||||
| 125 | 32 31 13 | 02 | Shop Drawings | Location of Gate, Corner, End, and Pull Posts | 3.17.1 | G | |||||||||||
| 126 | 32 31 13 | 02 | Shop Drawings | Gate Assembly | 1.3 | G | |||||||||||
| 127 | 32 31 13 | 02 | Shop Drawings | Gate Hardware and Accessories | 2.17 | G | |||||||||||
| 128 | 32 31 13 | 02 | Shop Drawings | Erection/Installation Drawings | 1.3 | G | |||||||||||
| 129 | 32 31 13 | 03 | Product Data | Fence Assembly | 1.3 | ||||||||||||
| 130 | 32 31 13 | 03 | Product Data | Gate Assembly | 1.3 | ||||||||||||
| 131 | 32 31 13 | 03 | Product Data | Gate Hardware and Accessories | 2.17 | ||||||||||||
| 132 | 32 31 13 | 03 | Product Data | Zinc Coating | 2.2 | ||||||||||||
| 133 | 32 31 13 | 03 | Product Data | PVC Coating | 1.5.1 | ||||||||||||
| 134 | 32 31 13 | 03 | Product Data | Aluminum Alloy Coating | 1.5.1 | ||||||||||||
| 135 | 32 31 13 | 03 | Product Data | Fabric | 2.3 | ||||||||||||
| 136 | 32 31 13 | 03 | Product Data | Stretcher Bars | 2.12 | ||||||||||||
| 137 | 32 31 13 | 03 | Product Data | Concrete | 2.20 | ||||||||||||
| 138 | 32 31 13 | 03 | Product Data | GATE POSTS | 2.15 | ||||||||||||
| 139 | 32 31 13 | 07 | Certificates | Certificates of Compliance | 1.5.2 | G | |||||||||||
| 140 | 32 31 13 | 08 | Manufacturer’s Instructions | Fence Assembly | 1.3 | ||||||||||||
| 141 | 32 31 13 | 08 | Manufacturer’s Instructions | Gate Assembly | 1.3 | ||||||||||||
| 142 | 32 31 13 | 08 | Manufacturer’s Instructions | Hardware Assembly | 1.3 | ||||||||||||
| 143 | 32 31 13 | 08 | Manufacturer’s Instructions | Accessories | 1.3 | ||||||||||||
| 144 | 33 70 02.00 10 | 02 | Shop Drawings | Detail Drawings | 1.4.1 | G | |||||||||||
| 145 | 33 70 02.00 10 | 02 | Shop Drawings | As-Built Drawings | 1.4.2 | ||||||||||||
| 146 | 33 70 02.00 10 | 03 | Product Data | Fault Current Analysis | 2.19.4 | G | |||||||||||
| 147 | 33 70 02.00 10 | 03 | Product Data | Protective Device | 2.19 | G | |||||||||||
| 148 | 33 70 02.00 10 | 03 | Product Data | Coordination Study | 2.19.5 | G | |||||||||||
| 149 | 33 70 02.00 10 | 03 | Product Data | Material and Equipment | 2.1 | ||||||||||||
| 150 | 33 70 02.00 10 | 03 | Product Data | Installation Requirements | 3.2 | ||||||||||||
| 151 | 33 70 02.00 10 | 06 | Test Reports | Factory Tests | 2.17 | ||||||||||||
| 152 | 33 70 02.00 10 | 06 | Test Reports | Field Testing | 3.12 | ||||||||||||
| 153 | 33 70 02.00 10 | 06 | Test Reports | Operating Tests | 3.12.13 | ||||||||||||
| 154 | 33 70 02.00 10 | 06 | Test Reports | Cable Installation | 3.3.1.4 | ||||||||||||
| 155 | 33 70 02.00 10 | 07 | Certificates | Material and Equipment | 2.1 | ||||||||||||
| 156 | 33 70 02.00 10 | 07 | Certificates | Cable Joints | 3.4 | ||||||||||||
| 157 | 33 70 02.00 10 | 07 | Certificates | Installation Engineer | 3.13.2 | ||||||||||||
| 158 | 33 70 02.00 10 | 10 | Operation and Maintenance Data | Operation and Maintenance Manuals | 3.13.1 | ||||||||||||
| 159 | 33 82 00 | 02 | Shop Drawings | Telecommunications Outside Plant | 1.6.1.1 | G | |||||||||||
| 160 | 33 82 00 | 02 | Shop Drawings | Telecommunications Entrance Facility Drawings | 1.6.1.2 | G | |||||||||||
| 161 | 33 82 00 | 03 | Product Data | Cable splices, and connectors | 2.5 | ||||||||||||
| 162 | 33 82 00 | 03 | Product Data | Closures | 2.3 | ||||||||||||
| 163 | 33 82 00 | 03 | Product Data | Building protector assemblies | 2.2.1 | G | |||||||||||
| 164 | 33 82 00 | 03 | Product Data | Protector modules | 2.2.2 | ||||||||||||
| 165 | 33 82 00 | 03 | Product Data | Cross-connect terminal cabinets | 2.4 | G | |||||||||||
| 166 | 33 82 00 | 03 | Product Data | Spare Parts | 1.8.2 | ||||||||||||
| 167 | 33 82 00 | 06 | Test Reports | Pre-installation tests | 3.5.1 | ||||||||||||
| 168 | 33 82 00 | 06 | Test Reports | Acceptance tests | 3.5.2 | ||||||||||||
| 169 | 33 82 00 | 07 | Certificates | Telecommunications Contractor | 1.6.2.1 | G | |||||||||||
| 170 | 33 82 00 | 07 | Certificates | Key Personnel | 1.6.2.2 | G | |||||||||||
| 171 | 33 82 00 | 08 | Manufacturer’s Instructions | Building protector assembly installation | 2.2.1 | ||||||||||||
| 172 | 33 82 00 | 08 | Manufacturer’s Instructions | Fiber Optic Splices | 3.1.10.2 | ||||||||||||
| 173 | 33 82 00 | 09 | Manufacturer’s Field Reports | Factory Reel Test Data | 2.16.1 | ||||||||||||
| 174 | 33 82 00 | 11 | Closeout Submittals | Record Documentation | 1.8.1 |