7 Story Building 6105 on CP Humphreys

OVERALL FLOOR PLAN – THIRD, FOURTH, FIFTH, SIXTH, and SEVENTH FLOOR

1st Floor (Office)

2nd Floor (Office) 3rd Floor 4th Floor 5th Floor 6th Floor

7th Floor PH Floor

Elevator Total

Dome Camera 0 0 14 14 14 14 14 4 2 76

Bullet Camera 0 0 2 2 2 2 2 1 0 11

Total 0 0 16 16 16 16 16 5 2 87

Remarks:

Planned Amount of Dome Camera in SOW: 90

Planned Amount of Bullet Camera in SOW: 18

The rest of 90 dome & 18 bullet cameras are to be installed after coordinating with COR to ensure that blind spots are covered.

OVERALL FLOOR PLAN – PH Floor