A02_Drawing_files___147078___Title.pdf

PDF 178 KB Posted

Attached to
Repair building No. 512, Camp Casey
Solicitation number
W91QVN16R0146
Issued by

About this file

Drawing_Title

View the file

Other files

File Type Posted
W91QVN16R0146_Final.docx DOCX document
A02_Drawing_files___147078___ELEC.pdf PDF
A03_Submittal_Register___147078.xls XLS spreadsheet
A02_Drawing_files___147078___CIVIL.pdf PDF
A02_Drawing_files___147078___MECH.pdf PDF
A02_Drawing_files___147078___ARCH.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TITLE SHEET

T-1

FEWR NO. 147078, CAMP CASEY

REPAIR BUILDING S-512

REPAIR BLDG S-512

CAMP CASEYYI, SC

147078

SCHEDULE OF DRAWINGS

RING NO. REF. NO.REVISION STATUSDWG. NO. SHT. NO.REF. NO.

T - 1

RING NO.

CIVIL

C - 1

M - 1

M - 2

M - 3

MECHANICAL

ELECTRICAL

A - 1

A - 2

A - 3

ARCHITECTURAL

DESCRIPTION OF DRAWINGS

TITLE SHEET

DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REVISION STATUS

TITLE SHEET

T-1

A - 4

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

E - 1

E - 2

E - 3

GENERAL NOTES AND SCOPE OF WORK

MECHANICAL MATERIAL INDICATIONS & SYMBOLS AND ABBREVIATIONS

LEGEND, GENERAL NOTES AND SCOPE OF WORKS

GROUND FLOOR LIGHTING/POWER PLAN

LIGHTING FIXTURE DETAIL & SCHEDULE

GROUND FLOOR LIGHTNING PROTECTION PLANE - 4

PROJECT LOCATION MAP

ELEVATIONS AND DETAILS

SECTIONS AND DETAIL

DETAILS

EXISTING / REMOVAL FLOOR PLANS & GENERAL NOTES

NEW GROUND FLOOR PLANS & SCOPE OF WORKS

INTERIOR FINISH SCHEDULE, DOOR/LOUVER SCHEDULE & DETAILS

A - 5

A - 6

GROUND FLOOR PLAN AND MECHANICAL EQUIPMENT SCHEDULE

File details come from the government source that posted it. Updated .