Technical_Exhibit_1_Performance_Requirements_Summary_FINAL.docx

DOCX document 16 KB Posted

Attached to
ANC World War I Exhibit Project
Solicitation number
W91QV1-16-R-0027
Issued by

About this file

Technical Exhibit 1 Performance Requirements Summary

View the file

Other files

File Type Posted
W91QV1-16-R-0027-0004.pdf PDF
W91QV1-16-R-0027-0003.pdf PDF
W91QV1-16-R-0027-0002.pdf PDF
W91QV1-16-R-0027-0001.pdf PDF
W91QV1-16-R-0027.pdf PDF
Technical_Exhibit_2_Deliverables_Schedule_FINAL.docx DOCX document
Technical_Exhibit_3.pdf PDF
Technical_Exhibit_4.pdf PDF
W91QV1-16-R-0027.pdf PDF
Technical_Exhibit_5.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 1

7.1 Performance Requirements Summary

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

7.1 The Contractor shall perform in accordance the following performance-based criteria.

Performance Objective
Standard
Performance Threshold
Method of surveillance

PRS#1

Contractor personnel shall provide satisfactory fixture design for ANC/ABMC. Section 1.3.1

Contractor meets all delivery deadlines, does not exceed exhibit budget, meets CMH and Army regulations and produces complete drawing sets.
Contractor meets 95% of delivery deadlines, any deviation from this must be reported to COR. Contractor cannot exceed the exhibit budget without KO permission and cost overrun cannot exceed 10% of the exhibit budget.

100 percent inspection.

PRS#2

Contractor personnel shall provide satisfactory graphic design for ANC/ABMC. Section 1.3.2

Contractor meets all delivery deadlines, does not exceed exhibit budget, meets CMH and Army regulations and produces complete drawing sets
Contractor meets 95% of delivery deadlines, any deviation from this must be reported to COR. Contractor cannot exceed the exhibit budget without KO permission and cost overrun cannot exceed 10% of the exhibit budget.

100 percent inspection

PRS#3

Contractor personnel shall provide satisfactory lighting design for ANC/ABMC. Section 1.3.3

Contractor meets all delivery deadlines, does not exceed exhibit budget, meets CMH and Army regulations and produces complete drawing sets
Contractor meets 95% of delivery deadlines, any deviation from this must be reported to COR. Contractor cannot exceed the exhibit budget without KO permission and cost overrun cannot exceed 10% of the exhibit budget

100 percent inspection

PRS#4 Contractor personnel shall provide satisfactory project management for ANC/ABMC. Section 1.3.4, 1.3.5

Contractor shall meet set budget requirements, shall set schedule, set shipping, meetings, et.
Contractor shall meet all deadlines that they negotiate with CMH. Deviation is only allowed with written permission from the COR.
100 percent inspection

PRS#5 Contractor personnel shall provide satisfactory exhibit fabrication for ANC/ABMC. Section 1.3.6, 1.3.7, 1.3.8

Contractor shall fabricate exhibits based on design plans, contractor shall host CMH for two inspections of fabricated components, fabricator shall provide samples.
Contractor shall be allowed to deviate from drawings so long as the deviation does not produce an product that deviated in appearance from the designed product. Fabricator shall not be more than 5 business days late on two inspections; fabricator shall provide 90% of samples on time and 10% of samples less than 10 working days after their due date.
100 percent inspection.

Periodic Surveillance for set inspections

PRS#5 Contractor personnel shall provide satisfactory exhibit installation for ANC/ABMC. Section 1.3.9, 1.3.10

Contractor shall meet all installation deadlines. All exhibits shall match designs. Contractor shall leave building in a clean condition.
Must meet all standards 100%
100 percent inspection

Types of Surveillance to select from:

Random Sampling: Appropriate for frequently recurring tasks. Evaluate randomly selected samples of the lot to determine the acceptability of the entire lot.

Random Inspection Guide, Method of surveillance, Lot size, Sample size, Performance requirement, Sampling procedure, Inspection procedure

100 Percent Inspection: Appropriate for tasks that occur infrequently. Inspect and evaluate performance each time task is performed

Periodic Surveillance: Evaluation of samples selected on other than 100% or statistically random basis. (I.e. monthly, quarterly, semi-annually etc.)

Validated Customer Complaint: Complaints must be validated.

File details come from the government source that posted it. Updated .