Fence Solicitations Q_A UPDATED 18AUG2020.xlsx
XLSX spreadsheet 9 KB Posted
- Attached to
- Fence Replacement at CJAGMTC Federal contract opportunity
- Solicitation number
- W91364-20-B-0002
About this file
This document contains a solicitation for fence replacement services at Camp James A. Garfield Joint Military Training Center in Ravenna, Ohio. The scope of work involves removing and replacing approximately 6,175 linear feet of existing perimeter security fence with new posts, fabric, top rail, outriggers, bottom wire and barbed wire. It also includes clearing vegetation within 10 feet of the new fence line and installing temporary fencing during construction. Bids are due at a specified location by August 31, 2020. The selected contractor will be responsible for grading and seeding disturbed areas, and meeting applicable safety and antiterrorism standards. This project provides an opportunity for SDVOSB contractors, but may be opened to unrestricted competition if adequate SDVOSB bids are not received. The soliciting agency is the Department of the Army Ohio Army National Guard.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF 1409 Signed 8SEP.pdf | ||
| Fence Replacement Amendment 003.pdf | ||
| 91364-20-B-0002_Fence sign in sheet_13-08-2020.pdf | ||
| Fence Solicitations Q_A UPDATED 25AUG2020_Answered.xlsx | XLSX spreadsheet | |
| Fence Solicitation Modification 2.0 UPDATED 18AUG2020.docx | DOCX document | |
| CJAGJMTC Fence Solicitation Modification.pdf | ||
| CJAGMTC Fence Solicitation.pdf | ||
| 10_BidForm_CJAG_Perimeter_Fence_rem_rep.docx | DOCX document | |
| RFI Template.pdf | ||
| 9_AF Form 66_3916441_Perimeter_Fence_rem rep.xlsx | XLSX spreadsheet | |
| CJAGJMTC_SOW_Perimeter_Fence_Rep_3916441_.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Number | Questions | Answers |
| 1 | Can the bid be submitted via e-mail? | No - bids are to be put in the drop box at the bid opening |
| 2 | If so, What is the email address for submission? | Bid opening will be August 31st under the solar canopy on CJAGMTC - across from where we met for the site visit. |
| 3 | Is attached PDF format acceptable for bid submission? | Use the bid form that is included in the solicitation |
| 4 | Is the fence Selvage knuckle on top twist on bottom? | Per section Article 4.1 a iv the top and bottom selvage shall twist |
| 5 | Is the fence grounding required at every end and terminal post? | Fence grounding is normally required if within 16 feet of a power source or 20 feet of a power line. Contractor shall assume that the grounding will be required in 15 locations for lighting and power considerations. Locations shall be coordinated with OHARNG. |
| 6 | Is there specific gate hardware required other than non-removable hinges? | Contractor shall also provide lockable latching mechanisms to be approved by the OHARNG. |
| 7 | Are there any specifics on temporary fence? | Temporary fence shall be 6 foot high chain link. |
| 8 | What is considered secure? | No openings in the fence that would be passable by a large animal or human. |
| 9 | Can you give us more detail on the clearing specifications for this project? Are we to trim that trees that are not being cut down in order to install the new fence? If so, how far up are we allowed to trim and how many will this entail? Are we clearing on all alternatives or only the base bid? | Per SOW section Article 2.1.1 the contractor is to clear and grub a 10' area out side the fence. This shall include a 40' high area for an envelope over the fence. |
-Trees that fall in the 10' by 40' envelope shall be trimmed.
-See answer above for height of 40'. It is unknown how many trees this will entail, however using the overall length of fence and the 10' clear zone there are approximately 5 acres of area to be cleared, trimmed and grubbed. Please see Environmental Procedures on how to properly dispose of clearing debris.
-Clearing is assumed on all sections and prorated amount shall be applied to each alternate/option.
File details come from the government source that posted it. Updated .