9_AF Form 66_3916441_Perimeter_Fence_rem rep.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Fence Replacement at CJAGMTC Federal contract opportunity
- Solicitation number
- W91364-20-B-0002
About this file
This document contains a federal solicitation for fence replacement services at Camp James A. Garfield Joint Military Training Center in Ohio. The solicitation seeks removal and replacement of approximately 6,175 linear feet of existing perimeter security fence and includes base bid work and alternate options. Additional requirements include necessary clearing and grubbing, installation of a temporary fence, grading, and reseeding disturbed areas. The replacement fence must meet military standards and antiterrorism measures per DOD guidelines. Responses are due by July 31, 2020. The contracting agency is the Department of the Army Ohio Army National Guard. The point of contact is Bradley Wahl and the contract officer is Joshua Huber.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF 1409 Signed 8SEP.pdf | ||
| Fence Replacement Amendment 003.pdf | ||
| 91364-20-B-0002_Fence sign in sheet_13-08-2020.pdf | ||
| Fence Solicitations Q_A UPDATED 25AUG2020_Answered.xlsx | XLSX spreadsheet | |
| Fence Solicitations Q_A UPDATED 18AUG2020.xlsx | XLSX spreadsheet | |
| Fence Solicitation Modification 2.0 UPDATED 18AUG2020.docx | DOCX document | |
| CJAGJMTC Fence Solicitation Modification.pdf | ||
| 10_BidForm_CJAG_Perimeter_Fence_rem_rep.docx | DOCX document | |
| RFI Template.pdf | ||
| CJAGMTC Fence Solicitation.pdf | ||
| CJAGJMTC_SOW_Perimeter_Fence_Rep_3916441_.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NCOC-A
| PROJECT NUMBER : | PROJECT TITLE: | SOLICITATION/CONTRACT NO.: | ||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | 390285 | CGJMTC MPMG | ||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | OTHER | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | |||||||||||||||||||
| 1 | Enviromental Work Plan | |||||||||||||||||||
| 2 | Access Roster | |||||||||||||||||||
| 3 | Project Schedule | |||||||||||||||||||
| 4 | Demolition Work Plan | |||||||||||||||||||
| 5 | SWPP Plan | |||||||||||||||||||
| 6 | Fees & Permits | |||||||||||||||||||
| 7 | Site Supervisor Resume | |||||||||||||||||||
| 8 | Concrete mix design | |||||||||||||||||||
| 9 | Fence posts | |||||||||||||||||||
| 10 | Fence rail | |||||||||||||||||||
| 11 | Fence fabric | |||||||||||||||||||
| 12 | Fence ties | |||||||||||||||||||
| 13 | Gate hardware | |||||||||||||||||||
| 14 | Barbed wire | |||||||||||||||||||
| 15 | Barbed wire supports | |||||||||||||||||||
| 16 | Warranty Documents | |||||||||||||||||||
| 17 | Close out Documents | |||||||||||||||||||
| 18 | ||||||||||||||||||||
| 19 | ||||||||||||||||||||
| 20 | ||||||||||||||||||||
| 21 | ||||||||||||||||||||
| 22 | ||||||||||||||||||||
| 24 | ||||||||||||||||||||
| 25 | ||||||||||||||||||||
| 26 | ||||||||||||||||||||
| 27 | ||||||||||||||||||||
| 28 | ||||||||||||||||||||
| 29 | ||||||||||||||||||||
| 30 | ||||||||||||||||||||
| 31 | ||||||||||||||||||||
| 32 | ||||||||||||||||||||
| 33 | ||||||||||||||||||||
| 34 | ||||||||||||||||||||
| 35 | ||||||||||||||||||||
| 36 |
Solicitation No. F38604-99-1480 Attachment 6
AF FORM 66
(Computer Generated) PAGE &P of &N
File details come from the government source that posted it. Updated .